Government Contract Opportunities
Access open contracts from city, county, educational, state and federal governments. Sign up today and gain instant access to the latest bid opportunities and receive Daily Contract Alerts matched to your business profile.
Siegfried & Roy Park: Playground Replacement NV
... fabric shade panels within project limits, and installation of new 2-5-years-old and 5-12-years-old... and plant protection, pvc pipe storm drainage, stormwater area drains and inlets, and geotechnical...
Nevada Government eMarketplace (NGEM) | Nevada
Carson River Trail System - Phase 3 (Prison Hill West) NV
...including ditches, drainage pipes, rip/rap, erosion control, signs, revegetation and related improvements... to the access road for the trailhead parking area, installation of a prefabricated vault toilet... and installation of a shade structure. NOTE:…...
Nevada Government eMarketplace (NGEM) | Nevada
Collection System Rehabilitation NV
...: The installation of approximately 11,400 linear feet of cured-in-place pipe (CIPP)within existing...; installation or trenchless pipe repair sleeves; removal or abandonment of sewer manholes; installation...
Nevada Government eMarketplace (NGEM) | Nevada
Siegfried & Roy Park: Playground Replacement NV
... panels within project limits, and installation of new 2-5-years-old and 5-12-years-old playground... protection, pvc pipe storm drainage, stormwater area drains and inlets, and geotechnical evaluation...
Nevada Government eMarketplace (NGEM) | Nevada
Carson River Trail System - Phase 3 (Prison Hill West) NV
..., drainage pipes, rip/rap, erosion control, signs, revegetation and related improvements. This project... for the trailhead parking area, installation of a prefabricated vault toilet and installation...
Nevada Government eMarketplace (NGEM) | Nevada