Government Contract Archives

Access contract archives from city, county, educational, state and federal governments. Sign up today and gain instant access to the latest bid opportunities and receive Daily Contract Alerts matched to your business profile.

Sort by:
Results 1 - 20 of 99

Townshend Dam Valve Removal and V-Notch Weir Installation, Townshend VT VT

...to a below ground collector pipe that outlets to a small pond on the downstream side of the Dam. The valves... will be replaced with sections of steel free flowing pipe. In addition, the construction... of the collector pipes will also be required. The…...

Department of the Army | Vermont

Federal

Due: 9/14/2018

Posted: 9/08/2018

Save

Sanitary_Disposal_Sys_Replacement VT

... frost protection and adequate drainage. 2. Adequate insulation and other pipe protection methods... complete replacement from inside the building, currently cast pipe, out to new components. 4. Existing...

General Services Administration | Vermont

Federal

Due: 9/06/2018

Posted: 9/04/2018

Save

Sanitary_Disposal_Sys_Replacement VT

... and adequate drainage. 2. Adequate insulation and other pipe protection methods should be investigated... the building, currently cast pipe, out to new components. 4. Existing systems in place may need...

General Services Administration | Vermont

Federal

Due: 9/06/2018

Posted: 8/17/2018

Save

Townshend Dam Valve Removal and V-Notch Weir Installation, Townshend VT VT

...ranging in depth from 2-8' feet, which connect the relief well system to a below ground collector pipe... with sections of steel free flowing pipe. In addition, the construction of a reinforced concrete outlet... structure that has a central dividing wall and a v-notch weir for both of the collector

Department of the Army | Vermont

Federal

Due: 8/31/2018

Posted: 8/15/2018

Save

Sanitary_Disposal_Sys_Replacement VT

... insulation and other pipe protection methods should be investigated to prevent potential frost concerns... pipe, out to new components. 4. Existing systems in place may need to be removed/ rerouted based...

General Services Administration | Vermont

Federal

Due: 9/06/2018

Posted: 8/13/2018

Save

Sanitary_Disposal_Sys_Replacement VT

...: 1. Include frost protection and adequate drainage. 2. Adequate insulation and other pipe... will require complete replacement from inside the building, currently cast pipe, out to new components. 4...

General Services Administration | Vermont

Federal

Due: 9/06/2018

Posted: 8/09/2018

Save

Sanitary_Disposal_Sys_Replacement VT

... insulation and other pipe protection methods should be investigated to prevent potential frost concerns... pipe, out to new components. 4. Existing systems in place may need to be removed/ rerouted based...

General Services Administration | Vermont

Federal

Due: 9/06/2018

Posted: 7/26/2018

Save

Townshend Dam Valve Removal and V-Notch Weir Installation, Townshend VT VT

...the relief well system to a below ground collector pipe that outlets to a small pond... on the downstream side of the Dam. The valves will be replaced with sections of steel free flowing pipe. In... and a v-notch weir for both of the collector pipes will…...

Department of the Army | Vermont

Federal

Due: 10/11/2018

Posted: 7/10/2018

Save

Route 15 Flood Bypass Culvert Replacements VT

...; installation of new culverts; relocation of water mains; modifications to drainage pipes...

State Government of Vermont | Vermont

State & Local

Due: 7/20/2018

Posted: 6/28/2018

Save

Construction Services for Repairs to the East Access Road, Union Village Dam, Thetford, Vermont VT

...disposal of approximately seven bituminous coated corrugated metal pipe (BCCMP) culverts ranging... feet; the replacement of one culvert with a 54 inch reinforced arch concrete pipe (RACP...) and the replacement of six culverts with high density polyethylene (HDPE) corrugated pipe…...

Department of the Army | Vermont

Federal

Due: 7/06/2018

Posted: 6/15/2018

Save

Construction Services for Repairs to the East Access Road, Union Village Dam, Thetford, Vermont VT

...the following: removal and offsite disposal of approximately seven bituminous coated corrugated metal pipe... concrete pipe (RACP) and the replacement of six culverts with high density polyethylene (HDPE...) corrugated pipe ranging in size from 24 inch…...

Department of the Army | Vermont

Federal

Due: 7/06/2018

Posted: 6/14/2018

Save

VT Route 127 Outfall Repair Reconstruction VT

... drainage pipe, minor pavement removal and replacement, drainage pipe, manhole structure, culvert...

State Government of Vermont | Vermont

State & Local

Due: 7/10/2018

Posted: 6/05/2018

Save

Invitation for Bids - South Cove 4" Sewer Force Main Rehabilitation VT

...the pipe and wearing a hole after 50+ years of soil movement. Appendix A towards the end... of this document provide specifications and other pertinent information for the use of Cured-In-Place Pipe (CIPP...) technology to bond to the host pipe and increase…...

State Government of Vermont | Vermont

State & Local

Due: 6/15/2018

Posted: 6/01/2018

Save

Design Consultant Services - RFP - Town of Bridport, VT VT

... engineering services for a project to replace a deteriorating corrugated metal pipe squash type culvert...

State Government of Vermont | Vermont

State & Local

Due: 5/25/2018

Posted: 5/02/2018

Save

Construction Services for Valve Removal and Outlet Structure with V-Notch Weir at Townshend Dam… VT

...well system to a below ground collector pipe that outlets to a small pond on the downstream side... of the Dam. The valves will be replaced with sections of free flowing pipe. In addition... for both of the collector pipes (relief well and toe drain) will…...

Department of the Army | Vermont

Federal

Due: 5/18/2018

Posted: 5/01/2018

Save

Sewer Pipe Replacement, North Hartland Lake, VT VT

... OF: Remove and replace approximately 320 feet of vitrified clay (VC) sanitary sewer pipe...

Department of the Army | Vermont

Federal

Due: 5/04/2018

Posted: 4/16/2018

Save

Dowsville Rd Culvert Replacement VT

... existing 5' diameter metal pipe culvert carrying an unnamed tributary of Dowsville Brook is to be replaced...

State Government of Vermont | Vermont

State & Local

Due: 4/26/2018

Posted: 4/02/2018

Save

Sewer Pipe Replacement, North Hartland Lake, VT VT

... - New England District is issuing a Pre-Solicitation Notice for Sewer Pipe Replacement, North... clay (VC) sanitary sewer pipe in accordance with specifications. This solicitation will be available...

Department of the Army | Vermont

Federal

Due: 4/20/2018

Posted: 3/26/2018

Save

Londonderry BF 016-1 (33) VT

.... WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES INSTALLATION OF A PIPE LINER IN EXISTING CULVERT...

State Government of Vermont | Vermont

State & Local

Due: 4/13/2018

Posted: 3/21/2018

Save

Crestview Drive Culvert Replacement VT

... arch culvert with a new 5' round HDPE storm pipe, and inlet/outlet headwalls. This project... alignment and pipe size. The City has received a Category D Better Roads Grants to complete...

State Government of Vermont | Vermont

State & Local

Due: 4/03/2018

Posted: 3/21/2018

Save

Showing 1 - 20 of 99 results

GovernmentContracts Email Notifications and Alerts

Get new state, local and federal government contract opportunities that match your business daily.