LMIG 2026

Location: Georgia
Posted: May 6, 2026
Due: Jun 8, 2026
Agency: City of Peachtree Corners
Type of Government: State & Local
Category:
  • 89 - Subsistence (Food)
Solicitation No: RFQ 26-01
Publication URL: To access bid details, please log in.
Bid Number: RFQ 26-01
Bid Title: LMIG 2026
Category: City Bids
Status: Open
Description:

The City invites you to submit a Qualifications Based Proposal from your firm that clearly presents your experience, expertise and professional capabilities on a project of this nature. The project generally consists of a the design and construction administration of sidewalks along Courtside Drive, Engineering Drive, and a roadway reconfiguration of Northwoods Parkway.

Contact: Email James Nguyen

Publication Date/Time:
5/6/2026 2:00 PM
Closing Date/Time:
6/8/2026 2:00 PM
Related Documents:

Attachment Preview

REQUEST FOR QUALIFICATIONS 26-01
LMIG 2026
I. Invitation to Service Providers
The City invites you to submit a Qualifications Based Proposal from your firm that clearly
presents your experience, expertise and professional capabilities on a project of this nature.
The City of Peachtree Corners (hereinafter called “City”) will receive sealed technical proposals
until June 8, 2026, 4:00 PM EDT, for the above referenced project and the City invites consultants
to submit proposals responsive to the specific requirements set forth in this request for
qualifications (RFQ).
Any questions and/or specifications that may need clarification shall be submitted via email to the
City’s representative at jnguyen@peachtreecornersga.gov. The email shall include the
correspondent’s name, company, mailing address, email address, and a direct phone number. It
shall be the consultant’s responsibility to seek clarification as early as possible prior to the opening
of proposals. The deadline for the submissions of questions via email is June 1, 2026, 5:00 PM
EDT All responses to questions and clarifications will be issued as an Addenda sent to all parties
who notified the City as an interested consultant. Only questions answered by Addenda will be
binding. The proposals must be sent via FTP, hard copy or email to:
James Nguyen, PE
City of Peachtree Corners
310 Technology Parkway
Peachtree Corners, Georgia 30092
jnguyen@peachtreecornersga.gov
Proposal should be marked RFQ 26-01 LMIG 2026Hard copy submittals must bear on the
outside the name and address of the consultant and include an electronic version of the proposal
on a flash drive. No proposal may be withdrawn or modified in any way after the deadline for the
proposal. Electronic submissions are adequate and are encouraged. Proposals must be valid for
ninety (90) days following the opening date.
The City may request additional information from suppliers to clarify elements of their proposals.
The City also reserves the right to make independent investigations as to the qualification of each
proposal.
The City reserves the right to reject any or all Proposals. The City further reserves the right to
reject the Proposals of any consultant whom it finds non-responsive. The City may also reject the
Proposal of any consultant if the City believes that it would not be in the best interest of the Project
to make an award to that consultant.
RFQ 26-01 LMIG 2026
Page 1 of 5
II. Project Description
The City of Peachtree Corners has a sidewalk and roadway reconfiguration engineering &
construction project that will be funded by Georgia Department of Transportation (GDOT) Local
Maintenance and Improvement Grant program. However, the plans do not need to follow the
GDOT Plan Development Process (PDP) as it will be locally let and not federally funded.
The project will include design and construction of sidewalks along the following roads:
Street
From
To
Linear Side of
Feet the Road
Courtside Dr
Peachtree corners circle
Life Time
650 North
Engineering Dr
Spalding Dr
SR 141/Peachtree
Parkway
2,700
West
Total:
3,350 Feet
The sidewalk along Engineering Drive will be an extension of the Citys multi-use trail system
and should be designed as a 12-foot-wide path and tie into the existing path.
The project will also include the evaluation and reconfiguration of Northwoods Parkway, an
existing roadway corridor currently configured as four travel lanes (two lanes in each direction)
with a median. The intent is to redesign the corridor to better reflect the surrounding area, improve
safety and operations for all users, and enhance multimodal accessibility.
The design and construction plans shall be prepared under the guidance of a professional
Consultant and shall be in accordance with AASHTO, GDOT & Gwinnett County Department of
Transportation Design Policies.
III. Scope of Services
The services to be performed by the consultant pursuant to this Project, include, but are not limited,
to the following:
Phase 1: Traffic Study, Survey & Database
Complete a topographic survey
Perform a traffic study (the traffic counts that were completed in the Preliminary
Assessment can be used)
Complete an operational analysis and 95th percentile queue lengths for this intersection
as well as the intersection of Peachtree Parkway (SR 141) and Peachtree Corners Circle
Phase 2: Construction Plans & Bid Documents
Develop construction plans including but not limited to:
o Cover sheet
o Index
o Typical Sections
RFQ 26-01 LMIG 2026
Page 2 of 5
o Cut/Fill limits
o Right of way and / or easement areas (to be included on mainline plans)
o Drainage profiles
o Driveway profiles if needed
o Plan sheets
o Erosion control plans
Coordination with Utility Companies
Preparation of a construction cost estimate
Plans should be designed to be constructed generally within the existing alignment
shown in the Project Concept Layout and avoid utilities where possible. If right of way
or easements are needed, areas will be included on the mainline plan sheets.
Address plan review comments.
Bid Document package, including construction plans, specifications, bidding details
and bid cost worksheet.
Provide a bid advertisement document
Respond to questions from bidders
Prepare addenda as needed
Coordinate and attend the bid opening and review bids for award
Review the bids and the qualification of the lowest bidder
Preparation of a bid recommendation letter
Phase 3: Construction Administration
Preparation of the Contract Agreement between the City and the selected contractor
Coordination of the pre-construction meeting
Provide 7-day letter, as needed
Provide responses to questions during the bidding and construction phases, as needed
Coordination with Contractor and Utility Companies
Review and approve Contractor’s Pay Applications
Periodically review Contractor’s operations
Coordinate and conduct final inspection and prepare final punch item list
Process project’s close out documents
IV. Proposal Format
Consultants shall submit an original Qualification Based Proposals. Proposals should be marked
RFQ 26-01 LMIG 2026”. Electronic submissions are adequate and are encouraged, however,
any hard copy submittals must bear on the outside the name and address of the consultant and
should include an electronic copy provided on flash drive. Proposals must be in strict compliance
with this Request for Qualification. Failure to comply with all provisions of the RFQ or to provide
complete responses to all sections may result in disqualifications.
Responses shall be concise while completely providing all information required. All responses
shall be typed and kept to a maximum of ten (10) 8.5” x 11” one sided pages. Exhibits may be
printed as 11” x 17” sheets and folded to fit the proposal. The required font size is a 12 point with
the exclusion of fonts associated with tables, charts and exhibits.
For the City to adequately compare and evaluate proposals, all proposals must include:
RFQ 26-01 LMIG 2026
Page 3 of 5
Cover Letter: A one-page letter that summarizes the key elements of the proposal. The letter must
include the contractor’s contact information and address where the business resides. The letter
should state why the contractor feels they should be selected. The letter is required to be signed by
an authorized officer and must provide a statement that they understand the contents of the Request
for Proposal and the proposal will be valid for ninety (90) days from the opening date.
Project Summary: A summary of the project displaying the consultant’s understanding of the
proposed project and impacts it may make for the City of Peachtree Corners. The summary shall
include the consultant’s understanding of the scope of work and the purpose of the proposal.
Methodology: Description of the overall approach the consultant will take to complete the scope
of work within this Request for Qualifications, including any innovative efforts that may occur.
Include all the tools or applications that will be used to complete the project. Include details on
how the project team will ensure the City’s satisfaction and what task is required by the City to
assist.
Proposed Schedule: Provide a GANTT chart styled schedule for completion of the scope of work
that gives specific time frames for each phase of the project.
Project Staff: Provide the anticipated list of individuals who will be tasked to work on this project
and indicate the functions that each will perform. Include each personnel’s experience that
demonstrates their capability to successfully complete this project.
Similar Experience: Provide no less than three (3) project references completed in the last five
years similar in size and scope to the proposed project that proves that the consultant and
corresponding project staff have the experience capable of completing this proposed project. Each
reference shall include project name, project description, key personnel, location, cost, status, and
client contact information.
V. Proposal Schedule
Advertise Request for Proposal
Submission of questions via email
Proposals due
Potential notice of award
May 6, 2026
June 1, 2026, 5:00 PM EDT
June 8, 2026, 4:00 PM EDT
June 12, 2026
VI. Proposal Evaluation Process
Consultants will be selected by an evaluation team based on the weighted criteria below:
Criteria
Methodology
Schedule
Project Staff
Similar Experience
Total
Points
30
20
20
30
100
RFQ 26-01 LMIG 2026
Page 4 of 5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Engineering Services Waycross, City Of Jun 01, 2026 @ 11:27 AM Jul 07, ...

State Government of Georgia

Bid Due: 7/07/2026

...Engineering Services Shady Dale, City Of May 11, 2026 @ 10:58 AM Jun ...

State Government of Georgia

Bid Due: 6/16/2026

...Request for Proposals for Engineering Services Fitzgerald, City Of Jun 01, 2026 @ ...

State Government of Georgia

Bid Due: 7/07/2026

...Request for Proposals for Engineering Services Coffee County Board Of Commissioners May 12, ...

State Government of Georgia

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.