| Location: | Pennsylvania |
|---|---|
| Posted: | Oct 6, 2025 |
| Due: | Nov 4, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Bethlehem Township Municipal Authority, Northampton County |
| Publication URL: | To access bid details, please log in. |
Project Description: From time to time, the Owner requires the permanent restoration of trench areas resulting from new lateral sewer installations and sanitary sewer or storm sewer line repairs/installations. This project includes all required permanent restoration for calendar year 2026, with the option to extend the Contract to also include calendar years 2027 and 2028. The work includes all labor, materials and equipment required to perform this restoration, including bituminous and concrete paving, sidewalks and curbs, where applicable, on Township streets and State roads. The work shall include mobilization/demobilization, saw cutting, milling, excavation and removal of temporary repaving materials, compaction, new paving (bituminous or concrete as applicable), sealing of new paving edges, concrete sidewalk and/or curb replacement, and topsoil and seeding, where applicable.

With GovernmentContracts, you can:
...Project Opening Date Bid Notice Awarded 2025 Storm Sewer Repairs at Various Locations ...
Windsor township
Bid Due: 12/10/2025
...Project: Earl Township Sunset Hill Storm Sewer & Road Widening Project Ref. #: ...
PennBid
Bid Due: 11/17/2025
...General Consultant Services contract for Water, Sewer and Storm Water Rate Board Pro ...
City of Philadelphia
Bid Due: 12/01/2025
...- Construction, Sewer and Storm Drain Responses due: November 18, 2025 Posted by: ...
City of Philadelphia
Bid Due: 11/18/2025