| Location: | Utah |
|---|---|
| Posted: | Oct 6, 2025 |
| Due: | Oct 24, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | GC10017 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project will consist of the construction of infrastructure, earthwork and roadways to serve approximately 116 future affordable housing units at the Arroyo Crossing community land trust subdivision. Specific project improvements include the excavation and construction of two roadways and installation of water, sewer, and irrigation mains, trenching and installation of electrical conduit, and a storm drainage system. The approximate project area is 4.8 acres. Gas utility is not proposed as part of this project. See RFB doc for full details and engineering plans.

With GovernmentContracts, you can:
...of plantings, and modifications of existing irrigation and storm drainage systems....
State Government of Utah
Bid Due: 11/12/2025
...and laterals, sewer main and laterals, adding a new storm drain system and ...
State Government of Utah
Bid Due: 11/13/2025
..., roadbase, curb and gutter, concrete flatwork), railroad crossing, water main with steel ...
State Government of Utah
Bid Due: 11/12/2025
...") to provide full-service design and construction management for a new storm drain ...
State Government of Utah
Bid Due: 11/20/2025