| Location: | Mississippi |
|---|---|
| Posted: | Jul 3, 2025 |
| Due: | Jul 10, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EE25B0002 |
| Publication URL: | To access bid details, please log in. |
W912EE - Ouachita Parish, Ouachita River Basin, 2020 PL 84-99 Ouachita River Levee Bank Stabilization, Emergency Bank Stabilization Sites 2, 11, 12, 16, & 22
The Consolidation Determination and Finding (attached) is posted in accordance with FAR 7.107-5(c):
"(c) Notification to the public of consolidation of contract requirements. The SPE or CAO shall publish in the GPE—
(1) A notice that the agency has determined a consolidation of contract requirements is necessary and justified (see 7.107-2) no later than 7 days after making the determination; the solicitation may not be publicized prior to 7 days after publication of the notice of the agency determination; and
(2) The determination that consolidation is necessary and justified with the publication of the solicitation. See 7.107-2 for the required content of the determination."
The work consists of furnishing all necessary plant, labor, materials, and equipment, and performing all work constructing longitudinal peaked stone toe dikes (LPSTDs) with stone tiebacks and stone fill revetment at five sites along the Ouachita River in Northeast Louisiana, south of Monroe, Louisiana. Principal features of the work include mobilization and demobilization, clearing and grubbing, and bank stabilization work consisting of tiebacks, excavation, and backfill.
Pursuant to Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(ii), the magnitude of the proposed construction project is between $25,000,000.00 and $100,000,000.00.

With GovernmentContracts, you can:
...) Project No. LSBP-55(39) in Pearl River County Mississippi. ROADWAY ITEMS: Mobilization Clearing...
State Government of Mississippi
Bid Due: 6/23/2026
...ROADWAY ITEMS: Mobilization Clearing and Grubbing Removal of Obstructions Removal of Steel Sub ...
State Government of Mississippi
Bid Due: 6/19/2026
...way. 5.0 The work shall consist of collecting, clearing, separating, loading, hauling, delivering...
State Government of Mississippi
Bid Due: 6/15/2026