| Location: | Pennsylvania |
|---|---|
| Posted: | Jul 28, 2025 |
| Due: | Aug 27, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Upper Moreland Township, Montgomery County |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be done under this contract consists of all labor, equipment, and materials for the improvement of an existing baseball field at Masons Mill Park in Upper Moreland Township, Montgomery County, PA. The current infield will be regraded and replaced with synthetic turf with an underdrain system. The Contractor is responsible for all demolition, turf system installation, erosion control, grading, soil compaction, trash/material removal, and local permitting. The Contractor shall provide all materials, equipment, tools, labor and work, unless otherwise provided and shall be responsible for the complete supervision, performance and completion of all work in accordance with the drawings, specifications, special provisions and contract. The Contract consists of a Base Bid and one (1) add/alternate item.

With GovernmentContracts, you can:
...Work also includes soil erosion and sedimentation control measures, traffic control, and restoration....
PennBid
Bid Due: 6/09/2026
...77121504 - Air pollution monitoring or measurement services 77121606 - Soil pollution measurement... ...
State Government of Pennsylvania
Bid Due: 12/31/2099
...in the contract documents. The Ba se Bid includes Soil Erosion a nd ...
Windsor township
Bid Due: 6/23/2026
...Installation of agricultural and soil best management practices. The scope of the project ...
PennBid
Bid Due: 6/18/2026