Design-Build Services for the Smoaks/Johnsville Community Center

Location: South Carolina
Posted: Feb 18, 2026
Due: Feb 25, 2026
Agency: Colleton County
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
bid date bid number bid documents status
02-25-2026 CPST-18 Design-Build Services for the Smoaks/Johnsville Community Center Open

Attachment Preview

Purchasing Department
113 Mable T. Willis Blvd.
Walterboro, SC 29488
843.782.0504
RFQ: CPST-18
DESIGN-BUILD SERVICES FOR THE SMOAKS/JOHNSVILLE
COMMUNITY CENTER
Due: Wednesday, February 25, 2026 @ 11:00 am
MAIL OR DELIVER RESPONSE TO:
Capital Projects
Attn: Johnny Stieglitz
403 E. Washington Street, Suite D
Walterboro, SC 29488
1|Page
Table of Contents
A. OVERVIEW.................................................................................................................................. 3
B. METHOD OF PROCUREMENT ............................................................................................ 3
C. GENERAL SCOPE OF SERVICES ......................................................................................... 3
D. SUBMITTAL FORMAT ............................................................................................................ 4
E. SELECTION PROCESS............................................................................................................. 5
F. SELECTION CRITERIA ........................................................................................................... 5
G. INSTRUCTIONS TO GENERAL CONTRACTOR ............................................................ 6
H. GENERAL CONTRACTUAL REQUIREMENTS ............................................................... 7
I. REQUIRED FORMS ................................................................................................................11
2|Page
A. OVERVIEW
Colleton County, South Carolina (the "County") is seeking qualified, licensed General Contractors to provide
Architectural/Engineering and construction services for the Colleton County, Smoaks/Johnsville Community
Center located at 2026 Community Ave. Smoaks, SC. These services shall include water and sewer needs,
facility design/engineering plans, specifications, cost estimates, permitting, and construction.
The qualified General Contractor must include a list of all sub-consultants required to provide a complete
set of plans, specifications, and construction for the project. The sub-consultants may include, but are not
limited to, structural, mechanical, electrical, landscaping, civil, survey, geotechnical services, general
contractor, and subcontractor services.
This solicitation does not commit Colleton County to award a contract, pay any costs incurred in preparing
the submitted proposals, or procure or contract for the services. Colleton County reserves the right to
accept, reject, or cancel, in part or in its entirety, offers received as a result of this request if it is deemed in
the County's best interest to do so.
All documentation associated with this solicitation is on the Colleton County website at:
https://www.colletoncounty.org/bids-proposal-requests. Questions regarding this solicitation must be
emailed to John Stieglitz, Capital Projects, at jstieglitz@colletoncounty.org no later than 11:00 am on
Monday, February 23, 2026. Answers to all questions will be posted on the Colleton County website as
addenda to this RFQ.
B. METHOD OF PROCUREMENT
This is a qualifications-based selection. The award will be given to the most responsible, responsive, and
highly qualified company, as ranked by the selection committee. This evaluation and selection process is a
competition, not simply a prequalification. The general scope of services is outlined below.
Colleton County intends to award the contract to a single General Contractor. Upon successful negotiation
of fees and contract terms, and subject to final approval by Colleton County Council, an agreement will be
executed for the requested services.
C. GENERAL SCOPE OF SERVICES
Colleton County is seeking architectural/engineering and construction services from a qualified, licensed
General Contractor to design and build the new Colleton County Smoaks/Johnsville Community Center at
2026 Community Ave. Smoaks, SC.
Community Center: The new construction shall include all trades required to build the facility and make it
ready for use. All water and sewer design, permitting, and installation shall be included in the project's
construction. All SCDOT, SCDES, and Colleton County Building Permits required for a complete project are
the responsibility of the General Contractor. The budget for a fully completed, functional facility is
approximately $900,000.00. There are no preliminary designs or permitting in place.
3|Page
The following items should be addressed when preparing your proposal:
Project supervisor qualifications
Project site superintendent qualifications, to include a list of projects completed in the last 5
years. List the type of facility, location, and date. Do not include any Colleton County projects.
Timeline for design and construction
D. SUBMITTAL FORMAT
Responding General Contractors shall submit three (3) bound copies, with one (1) being the original.
Responses must be submitted in a sealed envelope/package containing the General Contractors name,
solicitation name, and number.
The RFQ response must be submitted by the date and time listed in this RFQ. The response shall contain no
more than twenty-five (25) double-spaced pages, typed on one side only, excluding appendices. The
minimum font size shall be 12 points. Responses should address the proposal content requirements in the
same order as listed below. The General Contractors may wish to include additional information. If a General
Contractor does not submit responses to these items, their submittal may be considered non-responsive
and returned without further review/evaluation. General Contractors are advised that Colleton County
reserves the right to conduct an independent investigation of any information, including prior experiences,
identified in the responses. General Contractors are responsible for effecting delivery by the deadline date
and time; late submissions will be rejected without opening. Colleton County accepts no responsibility for
misdirected or lost proposals. Responses shall be explained and identified within the twenty-five (25) pages.
The following is included in the 25-page RFQ response:
1. Letter of Interest: The Letter of Interest should be no longer than one (1) page and shall contain the
following items:
a. An expression of the General Contractors interest in being selected for the project.
b. A statement by the General Contractors listing the commitment of key personnel to the
extent necessary to meet Colleton County’s quality and schedule expectations.
c. Provide the name of the General Contractor's Project Manager responsible for this contract,
who has the authority to sign the agreement for the General Contractor.
d. A summary of key points regarding the General Contractor's qualifications.
e. A current registration as a licensed General Contractor in South Carolina.
f. Signing the letter of interest constitutes authorization of the General Contractor's
qualifications to negotiate and enter a contract with Colleton County.
g. Certification of the authorized submitter that the information contained within is correct by
including: “I certify that the information included within this document is, to the best of my
knowledge, correct as of the date indicated.”
2. Project Organization Chart: Limited to one (1) side of one sheet of paper. This chart must include
the names of the key individuals selected for this project, their roles on the project, the names of
the Company by which they are employed, and the lines of communication, to include functional
structure, levels of management, and reporting relationships for key Individuals, and primary
functions to be performed in managing and designing the project. It shall also indicate the
individuals who will serve as points of contact with Colleton County’s Project Manager.
4|Page
3. Project Approach: Outline the General Contractors approach and schedule for completing the
specifications.
4. Specific Qualifications: Project experience directly applicable to Colleton County’s General
Contractor construction needs that demonstrate particular knowledge in and around the
Lowcountry Region (Beaufort, Hampton, and Jasper Counties). Those projects that relate specifically
to the area and are the most current will carry the most significant weight. Project outlines should
not exceed one page. Each project should include:
a. A brief description of the project work completed (including photos if available)
b. Project location
c. List the client’s budget and the General Contractor's cost of the project
d. Client, client reference, and contact information
Do not include any reference to projects completed in Colleton County.
REQUIRED FORMS
As specified in the last section of this RFQ, please include all required forms at the end of the
submitted proposal.
6. Project Questions: Responses to the questions below must be included in the response to the RFQ,
and they must not exceed 10 pages.
E. SELECTION PROCESS
The Colleton County selection committee will evaluate each proposal based on the stated selection criteria.
The selection committee may select all, some, or none of the General Contractors for interviews. The final
ranking of General Contractors and recommendation of the award will be presented to the Colleton County
Council for final approval.
Colleton County reserves the right to reject all qualifications and waive defects, technicalities, and/or
irregularities in any submittal. The County reserves the right to finalize a contract based on all factors involved
in the written qualifications submitted without further discussion or interviews.
F. SELECTION CRITERIA
The relative point value and selection criteria follow:
25%
Overall experience of the General Contractor and GC Employees
25%
Ability, qualification, and experience of the project team
25%
Related experience on similar projects
25%
Ability to provide services requested
5|Page
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project Name: Fort Fremont Stairs and Rails Design/Build Agency/Owner: Beaufort County Ad Publish..., ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 7/02/2026

...Ad Title: HVAC Replacement - Design-Build - Four Locations Purchasing Agent/Entity: Greenville...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/25/2026

...Project ID: Title: Fort Fremont Stairs and Rails Design/Build Addenda: 0 Release Date: ...

Beaufort County

Bid Due: 7/02/2026

...Project Name: Design-Build Services for a New Greenwood County Fire Station Agency/Owner... (parcel ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.