| Location: | Pennsylvania |
|---|---|
| Posted: | Dec 10, 2025 |
| Due: | Jan 23, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Capital Area Greenbelt Association, Dauphin County |
| Publication URL: | To access bid details, please log in. |
Project Description: This project is part of a multi-phase project conducted by the Capital Area Greenbelt Association (CAGA) to restore a total of 6,380 linear feet of Parkway Creek located along the Capital Area Greenbelt. This popular pedestrian and bicyclist greenspace is owned by the City of Harrisburg and managed by CAGA. Of the 6,380 linear feet of restoration planned across all phases, Phase 4 includes approximately 1,744 linear feet of stream restoration. Of the 1,744 linear feet, the project is broken down into 3 sub-phases, Phase 4A, 4B, and 4C. The Phase 4 stream restoration work includes: streambank grading to create floodplain reconnection; installing bank treatments, including boulder packing, to protect existing adjacent park infrastructure and stabilize mature trees; installing riparian plantings along the stream corridor.

With GovernmentContracts, you can:
...- Riprap Apron, 89 S.Y. Clearing and Grubbing - Grading Area 1, 79.0 ...
State Government of Pennsylvania
Bid Due: 6/18/2026
...consists of, but is not limited to: site clearing, gravel bar and sediment ...
PennBid
Bid Due: 6/15/2026
...and multi-court, installation of storm sewer and stormwater management facilities, bulk grading, tree... ...
PennBid
Bid Due: 6/24/2026
..., including milling/removing existing pavement and subbase materials, grading roadway, placing stone...
PennBid
Bid Due: 6/10/2026