| Location: | Missouri |
|---|---|
| Posted: | Sep 3, 2025 |
| Due: | Sep 24, 2025 |
| Agency: | City of Sedalia |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Katy Depot - Liberty Park Connect Sedalia Project
Closes: September 24, 2025 3:00 pm
The proposed work includes: the construction of a 8-10' sidewalk beginning at Katy Depot continuing west along the south side of 3rd Street to a mid-block crossing at Sneed Avenue. Tasks include: Demolition, Earthwork, Grading, Storm Sewer, Concrete Sidewalk, ADA Ramps, Signage, Pavement Markings, Traffic Control, and Erosion Control.
Response Process
Responses shall be submitted with the words "Response to Katy Depot ? Liberty Park Connect Sedalia Project" on the title line of the form, in the subject line of the email or clearly indicated outside of the mailing.
Mail to:
Office of the City Clerk
200 South Osage Avenue
Sedalia, MO 65301
Responses will be reviewed in Council Chambers shortly after the closing date and time.
Details
Plans and specifications may be purchased electronically from Jeremy Stone at jestone@sedalia.com. A twenty-dollar ($20.00) non-refundable deposit is required. Include a copy of your check in the email.
Click on link below for more information.
PDF Downloads

With GovernmentContracts, you can:
..., MO 65301. All bids shall be submitted in the form of hard ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/16/2026
...Concrete I-Girder bridge, slope protection, asphalt surface roadway, guard rail, and incidental work. ...
Missouri Department of Transportation(MDOT)
Bid Due: 7/06/2026
...(57,532 square feet). Structure will feature a new reinforced concrete foundation by replacing ...
DEPT OF DEFENSE
Bid Due: 6/15/2026
...quantities of work: Concrete (Grade 4)(AE)(SW).................................... 35.6 Cu. Yds... deposit in the form ...
Drexel Technologies
Bid Due: 6/15/2026