Location: | Texas |
---|---|
Posted: | Jun 11, 2025 |
Due: | Jun 24, 2025 |
Agency: | Guadalupe-Blanco River Authority (GBRA) |
Type of Government: | State & Local |
Category: |
|
Publication URL: | To access bid details, please log in. |
TX-130 Northern Pipeline includes the installation of approximately 11.20 miles (59,300 ft) of 24-IN pipe, 3.60 miles (18,900 ft) of 16-IN pipe, and 1.60 miles (8,400 ft) of 12-IN pipe. Delivery pipeline will be situated within a 30-FT, obtained permanent easement along multiple private properties and crossing public and private roads. Work also includes the installation of butterfly valves, gate valves, blow-off valves, and combination air release/vacuum valves along the delivery pipeline. Fences and gates will be removed/demolished as part of the pipe installation and will be rebuilt/replaced as specified/detailed. Approximately 4,600 linear feet of trenchless jack and bores varying in sizes from 42”, 32”, and 24” steel casing will be installed under creeks, roadways, and varying utilities. Work will also cross several utilities that must be protected in place. The Work includes providing all necessary traffic control, site access, trench safety, permits, erosion and sedimentation control measures with storm water protection plan, site restoration, dewatering, and all other work included in the contract documents.
With GovernmentContracts, you can:
...Project: Storm Drainage Services Ref. #: RFQ 2025-051 Department: Water Utilities Type: RFQ ...
City of Waco
Bid Due: 9/09/2025
...and construction services to meet Federal, State and Municipal standards and provide other ...
State Government of Texas
Bid Due: 9/09/2025
...Water and Sewer Repair Materials Solicitation ID: RFB2025-039 Status: Posted Contact Name: Daryle... ...
State Government of Texas
Bid Due: 8/21/2025
...Project: Provision of bottled water and bulk potable water Ref. #: BT25-00027964 Type: ...
City of Dallas
Bid Due: 7/25/2025