23-0010-A
Wastewater Treatment Facility No. 2 Storage Building No. 2
Issue Date: 11/17/2023
Questions Deadline: 12/13/2023 11:00 AM (CT)
Response Deadline: 1/9/2024 11:00 AM (CT)
San Jacinto River Authority
Contact Information
Contact: Kim Robbins Senior Buyer
Address: 1577 Dam Site Road
Conroe, TX 77304
Phone: (936) 588-7118
Email: krobbins@sjra.net
Page 1 of 5 pages
Deadline: 1/9/2024 11:00 AM (CT)
23-0010-A
Event Information
Number:
23-0010-A
Title:
Wastewater Treatment Facility No. 2 Storage Building No. 2
Type:
SJRA - Request for Competitive Sealed Proposal
Issue Date:
11/17/2023
Question Deadline: 12/13/2023 11:00 AM (CT)
Response Deadline: 1/9/2024 11:00 AM (CT)
Notes:
The San Jacinto River Authority is requesting Competitive Sealed Proposals
(CSP) for the following project in Montgomery County, The Woodlands,
Texas: CSP No. 23-0010-A – Wastewater Treatment Facility No. 2 Storage
Building No. 2.
LOCATION AND DESCRIPTION OF PROJECT:
SJRA Wastewater Treatment Facility No. 2
Construction of a 60-ft x30-ft storage building with a 40-ft x30-ft open canopy
with 16-ft tall eaves. The building is to have two motorized steel roll-up bay
doors, three pedestrian doors, electrical system, ventilation system and
plumbing for water. The project is to be turn-key construction in which the
Contractor will provide design and construction of the foundation base,
concrete foundation, the storage building and all its openings and
ventilation, electrical system, lighting, and exterior pavement.
Engineer's opinion of probable construction cost: $ 460,000
Estimated project schedule: Substantial Completion within 180 calendar
days after NTP.
Please login the Brazos Valley e-Marketplace to download the CSP
document for the bid schedule and further details.
Please note, emailed Proposals are not accepted. Proposals shall be loaded
in the Brazos Valley e-Marketplace System.
All questions/inquiries shall be entered into the Brazos Valley e-Marketplace
System.
For assistance with Brazos Valley e-Marketplace System, please
email: support@ionwave.net
Or call: 866.277.2645
Page 2 of 5 pages
Deadline: 1/9/2024 11:00 AM (CT)
23-0010-A
Bid Activities
Mandatory Pre-Proposal Conference
SJRA Woodlands Division
2436 Sawdust Road
The Woodlands, Texas 77380
12/6/2023 2:00:00 PM (CT)
Bid Attachments
CSP 23-0010-A - WWTF No. 2 Storage Building No. 2_Final.pdf
CSP 23-0010-A WWTF No. 2 Storage Building No. 2
CSP 23-0010-A - WWTF No. 2 Storage Building No. 2 - 100 Percent Dwgs.pdf
Drawings
CSP 23-0010-A - WWTF No. 2 Storage Building No. 2 - 100 Percent Specs.pdf
Specifications
CSP Attachments B_J.pdf
Attachments B-J
Conflict of Interest Questionnaire Form.pdf
Conflict of Interest Questionnaire Form
CSP 23-0010-A - WWTF No. 2 Storage Building No. 2 - Proposal Form.xlsx
Proposal Form
Exhbit A - Major Construction Services Agreement - Sample.pdf
Exhibit A - Major Construction Services Agreement - Sample
View Online
View Online
View Online
View Online
View Online
View Online
View Online
Requested Attachments
23-0010-A_Proposal_Firm_Name
(Attachment required)
Attachments B-J
23-0010-A_CIQ_Form
(Attachment required)
Conflict of Interest Questionnaire Form (please enter firm name in box 1 and complete boxes 6-7).
23-0010-A_Bid_Bond_Firm_Name
(Attachment required)
provide bid bond
Bid Lines
1 Mobilization, Bonds, Insurance and other Division 01 Requirements
(Response required)
Quantity: 1 UOM: LS
Price: $
Item Notes: 01 11 13 Work Covered By Contract Documents
Supplier Notes:
Total: $
Additional notes
(Attach separate sheet)
Page 3 of 5 pages
Deadline: 1/9/2024 11:00 AM (CT)
23-0010-A
2 Design of a storage building and deep open canopy concrete foundation.
(Response required)
Quantity: 1 UOM: LS
Price: $
Item Notes: 01 11 13 Work Covered By Contract Documents
Supplier Notes:
Total: $
Additional notes
(Attach separate sheet)
3 Design of a 60-ft long and 30-ft deep storage pre-engineered metal building attached to a 40-ft long and 30-ft
deep open canopy.
(Response required)
Quantity: 1 UOM: LS
Price: $
Total: $
Item Notes: 01 11 13 Work Covered By Contract Documents
Supplier Notes:
Additional notes
(Attach separate sheet)
4 Construction and erection of a 60-ft long and 30-ft deep storage building attached to a 40-ft long and 30-ft deep
open canopy.
(Response required)
Quantity: 1 UOM: LS
Price: $
Total: $
Item Notes: 01 11 13 Work Covered By Contract Documents
Supplier Notes:
Additional notes
(Attach separate sheet)
5 Construction of all building related appurtenances including but not limited to site paving, utilities, electrical work
and all other items as shown in Plans.
(Response required)
Quantity: 1 UOM: LS
Price: $
Total: $
Item Notes: 01 11 13 Work Covered By Contract Documents
Supplier Notes:
Additional notes
(Attach separate sheet)
6 Excavation and Backfill Necessary Due to Unforeseen Circumstances Encountered During Construction Beyond
the Cut and Fill Required for Building Foundation Work.
(Response required)
Quantity: 20 UOM: CY
Price: $
Total: $
Item Notes: 31 21 33.01
Supplier Notes:
Additional notes
(Attach separate sheet)
7 Additional Cut and Offsite Disposal of Soil Necessary Due to Unforeseen Circumstances Encountered During
Construction Beyond the Cut and Fill Required for Building Foundation Work.
(Response required)
Quantity: 20 UOM: CY
Price: $
Total: $
Item Notes: 31 21 33.01
Supplier Notes:
Additional notes
(Attach separate sheet)
Page 4 of 5 pages
Deadline: 1/9/2024 11:00 AM (CT)
23-0010-A
Supplier Information
Company Name:
Contact Name:
Address:
Phone:
Fax:
Email:
Supplier Notes
By submitting your response, you certify that you are authorized to represent and bind your company.
Print Name
Signature
Page 5 of 5 pages
Deadline: 1/9/2024 11:00 AM (CT)
23-0010-A
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.