| Location: | South Carolina |
|---|---|
| Posted: | May 2, 2025 |
| Due: | May 22, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H27-6164-LC |
| Publication URL: | To access bid details, please log in. |
USC is seeking architectural and engineering services for the replacement of the HVAC system (fan coils, pumps, and piping) at Harper Elliott College (approx.12,000 GSF) as well as provide various interior architectural upgrades (offices, student lunge, meeting rooms). Minor renovations (bathroom ADA) may also be required in the DeSaussure Building.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project...: Improvements include ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...: Design-Bid-Build Construction Cost Range: $1,235,000 to $1,305,000 Agency Project Coordinator... and support ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/17/2026
...and hardware. Documents May Be Obtained From: Scherrie Cogdill, Director of Design and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...29104 Project Delivery Method: Design-Build Construction Cost Range: $96,000 Agency Project... with applicable ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/15/2026