| Location: | South Carolina |
|---|---|
| Posted: | May 27, 2025 |
| Due: | Jun 30, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RIA SCIIP Grant A-23-C143 R-23-C143 |
| Publication URL: | To access bid details, please log in. |
Construction of stormwater collection and conveyance infrastructure along the S. Main Street Corridor and S. Nichols Street Corridor. Work to be performed, installation of reinforced concrete piping, associated drainage structures, associated utility relocation, paving, and site restoration. Also construction of a stormwater pocket park with retention pond, pathways, hardscapes at the intersection of S. Main Street and US 76 on Town owned land.

With GovernmentContracts, you can:
...Branch to be a concrete slab structure capable of carrying heavy construction and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/16/2026
...Section B project consists of combination of concrete pathway, retaining wall structure... and ...
Richland County
Bid Due: 6/16/2026
...with a 10'x10' metal roofed hip structure; 1,000 LF of 8' wide concrete ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/18/2026
...Bid Number: 2026-014 Bid Title: Construction Manager At-Risk for Abernathy Park Category...: Construction ...
City of Clemson
Bid Due: 6/30/2026