Request for Qualifications (Architect / Engineer)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Project Name 1922 Club
Response Deadline 12/20/2024
2:00 PM local time
Project Location Ohio Stadium (0082)
Project Number
OSU-230836
City / County Columbus / Franklin
Project Manager
Ross Quellhorst
Owner
The Ohio State University
Contracting Authority Local Higher Education
Delivery Method Construction Manager as Risk
Prevailing Wages State
No. of paper copies requested (stapled, not bound)
0
No. of electronic copies requested (PDF)
1
Submit the Statements of Qualifications (Form F110-330) via email to: 1922_Club.01_Selection@docs.e-builder.net
In the subject line, include the project number and name for RFQ you are responding to. See Section J of this RFQ for
additional submittal instructions.
Submit all questions regarding this RFQ in writing to Ross Quellhorst at quellhorst.9@osu.edu with the project number
included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the
OFCC website at Bids & RFQs on a regular basis until one week before the response deadline. The name of the party
submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
This project is a wonderful opportunity to celebrate the enduring symbol of tradition, pride, and unity. Ohio Stadium serves
as the sacred ground where Buckeye spirit comes alive. Constructed in 1922, the stadium is home to the Ohio State
Buckeyes Football and the community of Buckeye faithful who cheer them on. This project will renovate approximately
12,000 SF of vacant space on the east side of Ohio Stadium into premium club and event space. The project includes
new kitchen, catering space and a full bar on the main level, plus a mezzanine space with an additional bar and private
event rooms. The space will host approx. 750 patrons for game days events and daily restaurant operations.
A study and Program of Requirements were completed in 2023 which will be provided to shortlisted teams. The selected
AE will be required to verify and validate the program and budget.
This project is required to be designed and delivered within a collaborative BIM-enabled environment following The Ohio
State University BIM Project Delivery Standards. The Primary firm submitting for the project will be required to have the
BIM expertise capable of meeting the aforementioned standards. The Ohio State University BIM Project Delivery
Standards can be accessed via the OSU FOD website: BIM Project Delivery Standards.
The minimum required BIM Use Cases for this project are noted below. Details on the BIM Uses Cases are outlined in
Section 2 of the Ohio State University BIM Project Delivery Standards.
Design BIM Use Case
2.3.1.1. Model Authoring – Design Intent BIMs (Required for the
Architectural team and the Engineering team)
2.3.1.2. Model Authoring – Design Intent BIMs (Required for the
architectural team, preferred for the engineering team)
2.3.2. Existing Conditions Documentation/Modeling
2.3.3. Program of Requirements (PoR) Validation
2.3.4. Site Design
2.3.5. Model Based User Group Meetings/Reviews
2.3.6. Sustainability (Energy Modeling/Simulation and
Performance)/ Design Simulation/Analysis
2.3.7. Clash Prevention
2.3.8 Quantity Schedule
Construct BIM Use Case
2.4.1. Model Authoring – Trade Coordination BIMs
2.4.2. Model Authoring – Shop/Fabrication BIMs
2.4.3. Clash Detection
Required Additional Notes
X
X
X
X
X
Required Additional Notes
X
X
F110-02-2022-MAR
Publish Date: 11/22/24, Revised: 12/10/24
Page 1 of 5
Request for Qualifications (Architect / Engineer) continued
Design BIM Use Case
2.4.4. Model-based Scheduling (Sequencing/Simulation)
2.4.5. Model-based Estimating (Quantification/Cost Estimating)
2.4.6. Site Analysis Planning
Required Additional Notes
The minimum required deliverables for this project are noted below. Details on the BIM deliverables are outlined in
Section 4 of the Ohio State University BIM Project Delivery Standards
Deliverable
BIM Execution Plan
Design Intent BIMs
Revit Model Rule Set Results
Interim Architectural and Structural
Conformed Design Intent BIMs
Project Base Point
Conformed Design Intent BIMs
Interim Asset Worksheet
Final Asset Worksheet
Required
X
X
X
X
X
X
X
X
This project includes asset tagging. The Primary firm submitting for the project is required to have the expertise capable of
meeting this prerequisite and is responsible to support their consultants to meet this requirement. The Asset Tagging
Process Diagram, Asset Worksheet Template, and LOD Matrix can be accessed via the OSU FOD website
(https://fod.osu.edu/resources) under Design Guidelines, Specifications, Standards; Specifications and Standards;
Building Information Modeling (BIM).
B. Scope of Services
The project and construction budget as listed in this RFQ is estimated. The project has been approved for design services
only. This request is for Architect/Engineer (A/E) to provide design and project management to establish the schematic
design concept, design development, construction documents, bidding, construction contract administration and post-
construction services.
A POR was developed in Fall 2023 which will be required to be validated by the AE team. The AE will be required to
partner with the CM to validate the estimate and total budget developed for the project using the target value budget /
target value design process.
The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf.
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and
clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed
cost components to address the Owner’s project requirements. Participate in the Encouraging Growth, Diversity & Equity
(EDGE) Program as required by statute and the Agreement. Required Professional Liability Insurance will be per Exhibit A
– A/E Terms and Conditions Article 7.2.6.
As required by the Agreement, and as properly authorized, provide the following categories of services:
• Program Verification
• Schematic Design
• Design Development
• Construction Document Preparation
• Bid and Award Support
• Conformed Documents
• Construction Administration
• Post-Construction
• Additional Services of all types
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at Architect and Engineer Agreements.
The selected A/E will be required to sign the standard agreement. No modifications to the requirements in the agreement
will be accepted.
During the construction period, provide not less than 6 hours (excluding travel time) on-site construction administration
services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site
F110-02-2022-MAR
Publish Date: 11/22/24, Revised: 12/10/24
Page 2 of 5
Request for Qualifications (Architect / Engineer) continued
representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having
relevant and appropriate types of construction administration experience.
The project team (Owner / A/E / Contractor) will be required to utilize e-Builder, the University’s Project Management
System, for all compatible services required by the University.
The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors,
and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within
Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here:
https://fod.osu.edu/resources, under the section titled “Construction Site Safety Requirements.”
Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using the
e-Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio
State University Project Closeout Standards can be accessed via the OSU FOD vender resource website
(https://fod.osu.edu/resources) under Post Construction / Close Out.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Design experience working within Athletic Facilities on University Campuses
2. Proven experience working within challenging design schedules and budgets aligned to meet Athletic
playing schedules.
3. Sustainable Design Experience
4. Projects delivered in a collaborative BIM-enabled environment
5. Experience working on high-end venues designed to host sophisticated events and gatherings providing an
upscale and exclusive atmosphere and experience.
For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330),
projects must be designed by the Lead Firm.
C. Estimated Budget / Funding
State Funding:
$0
Other Funding:
$15,000,000
Construction Cost: $11,431,584
Total Project Cost: $15,000,000
D. Anticipated Schedule
Professional Services Start:
Construction Notice to Proceed:
Substantial Completion of all Work:
Professional Services Completed:
01 / 25
09 / 25
08 / 26
10 / 26
E. Estimated Basic Fee Range (see note below)
F. EDGE Participation Goal
6.6% to 7.1%
Percent of initial Total A/E Fee:
5%
NOTE: Basic Services include: (1) Program Verification, (2) Schematic Design, (3) Design Development, (4) Construction Documents,
(5) Bidding and Award OR GMP Proposal and Amendment (as applicable), (6) Construction Administration, and (7) Closeout services. The
Basic Fee includes all professional design services and consultant services necessary for proper completion of the Basic Services, including
validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost estimates and design schedules for the
project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for Construction Cost above. The Basic
Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below)
Lead A/E Discipline: Architecture
Secondary
Mechanical-Electrical-Plumbing Eng.
Disciplines:
Structural Eng.
H. Additional Service Providers Required
Restaurant / Bar Design - Interiors
AV/Technology/Communications/Security
Interior Design/Furniture Design
NOTE: The lead A/E shall be (1) an architect registered pursuant to ORC Chapter 4703, (2) a landscape architect registered pursuant to ORC
Chapter 4703, or a (3) professional engineer or (4) professional surveyor licensed pursuant to ORC Chapter 4733.
I. Evaluation Criteria for Selection
F110-02-2022-MAR
Publish Date: 11/22/24, Revised: 12/10/24
Page 3 of 5
Request for Qualifications (Architect / Engineer) continued
• Demonstrated ability to meet Owner’s programmed project vision, scope, budget, and schedule on previous
projects.
• Demonstrated ability to meet Owner’s Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf.
• Previous experience compatible with the proposed project (e.g., type, size).
• Relevant past work of prospective firm’s proposed consultants.
• Past performance of prospective firm and its proposed consultants.
• Qualifications and experience of individuals directly involved with the project.
• Proposer’s previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
• Design quality and demonstrated ability of prospective firm and its proposed consultants to provide design
services which represent the University’s Design Guidelines for Buildings and Landscape buildings-
landscape.pdf
• Experience and capabilities of creating or using Critical Path Method (CPM) schedules and of using CPM
schedules as a project management resource.
• Approach to and success of using partnering and Alternative Dispute Resolution.
• Proximity of prospective firms to the project site.
• Proposer’s apparent resources and capacity to meet the needs of this project.
• The selected A/E and all its consultants must have the capability to use the Internet within their normal business
location(s) during normal business hours.
Interested firms are required to address their BIM project delivery experience and how they will implement Building
Information Modeling (“BIM”) on the project by documenting:
• The ability for the entire team to effectively collaborate and share models and data.
• Each discipline’s model manager and their relevant experience.
• How the A/E will support a consultant that does not have sufficient BIM experience to meet the above
expectations.
Interested A/E firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program
form in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract
with and use EDGE-certified Business Enterprise(s), as a part of the A/E’s team. The Intent to Contract and to Perform
and / or waiver request letter and Demonstration of Good Faith Effort form(s) with complete documentation must be
attached to the A/E’s Technical Proposal. Both forms can be accessed via the OFCC website at Procurement Forms. The
Intent to Contract and to Perform form is again required at the Fee Proposal stage.
If the A/E firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform forms
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business Enterprises, by name, which will
participate in the delivery of the proposed professional services solicited in the RFQ.
Interested A/E firms must indicate on their Statement of Qualifications, the locations where their services will be
performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D
related to providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting
purchases from or investment in any Russian institution or company. Failure to do so may cause their Statement of
Qualifications to be rejected.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at Procurement Forms.
Electronic submittals should be combined into one PDF file saved with the form name, project number listed on the RFQ
and your firm’s name (ex. F110-330_OSU-nnnnnn_Firm Name). Use the “print” feature of Adobe Acrobat or similar
software for creating a PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go
to Advanced, then PDF Optimizer.
Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with a
maximum file size of 25 MB.
Firms are requested to identify professional registrations, memberships, and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-02-2022-MAR
Publish Date: 11/22/24, Revised: 12/10/24
Page 4 of 5
Architect / Engineer Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name 1922 Club
Project Number OSU-230836
Proposer Firm
City, State, Zip
Selection Criteria
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site
b. Amount of fees awarded by Contracting Authority in
previous 24 months
c. Number of licensed professionals
Less than 100 miles
100 miles to 200 miles
More than 200 miles
Less than $200,000
$200,000 to $1,000,000
More than $1,000,000
Less than 2 professionals
2 to 10 professionals
More than 10 professionals
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead
b. Project design lead
c. Technical staff
d. Construction administration staff
Experience / ability of project manager to
manage scope / budget / schedule / quality
Experience / creativity of project designer to
achieve owner’s vision and requirements
Experience / ability of technical staff to create
fully coordinated construction documents
Experience / ability of field representative to
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads
Experience / ability of key consultants to
perform effectively and collaboratively
b. Proposed EDGE-certified Consultant participation*
One point for every 2 percent increase in
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration
b. OSU Sustainability Standards or LEED** project
experience
c. BIM project experience
d. Team organization
Less than 2 sample projects
2 to 4 sample projects
More than 4 sample projects
LEED v4.0 or v4.1 projects
OSU Sustainability Standards projects
Training and knowledge
Direct project experience
Clarity of responsibility / communication
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance
b. Experience with similar projects / delivery methods
c. Budget and schedule management
d. Knowledge of Ohio Capital Improvements process
Past performance as indicated by
evaluations and letters of reference
Less than 3 projects
3 to 6 projects
More than 6 projects
Performance in completing projects within
original construction budget and schedule
Less than 3 projects
3 to 6 projects
More than 6 projects
Value
Score
5
2
0
2
1
0
0
1
2
Max
=3
0 - 10
0-5
0 - 10
0-5
Max
= 20
0 - 15
0-5
1
2
3
Max
=3
1
Max
2
=2
1
Max
3
=3
0-2
0 - 10
0-3
4-6
7 - 10
0-5
0-1
2-3
4-5
* Must be comprised of professional design services consulting firm(s) and NOT the lead firm – For more
information on scoring this and other criteria refer to the OFCC website under Procurement Forms.
** Leadership in Energy & Environmental Design administered by Green Building Certification Inc.
Notes:
Evaluator:
Name
Subtotal
F110-02-2022-MAR
Signature
Publish Date: 11/22/24, Revised: 12/10/24
Date
Page 5 of 5