| Location: | Alabama |
|---|---|
| Posted: | Mar 6, 2025 |
| Due: | Mar 13, 2025 |
| Agency: | HOMELAND SECURITY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 70Z085Q250011548 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS IS TO BE AWARDED OFF OF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.
STATEMENT OF WORK (SOW)
FOR
USCGC WEDGE Renew Piping Insulation, Overhead Insulation and Conduct Overhead Repairs
WEDGE has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).
1.0 GENERAL
The 75’ WLR asset, USCGC WEDGE needs approximately 500 linear feet of pipe insulation, 1500 square feet of overhead insulation, and 300 sq ft of overhead panels.
The scope of this contract is defined by the efforts and tools required to support USCGC WEDGE (WLR 75307). The Contractor shall provide all labor, materials, and tools necessary to install insulation and bulkhead panels.
Table 1 -Pipe Insulation Renewal
Description
(System/ Pipe Diameter/ Linear Feet)
Location
Drawing
Tender Chill Water/ Potable Water Piping / .5 in / 50 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Chill Water/ Potable Water Piping / .75 in / 50 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Chill Water/ Potable Water Piping / .875 in / 50 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Chill Water/ Potable Water Piping / 1 in / 100 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Chill Water/ Potable Water Piping / 1 .25 in / 125 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Waste Water Piping / 1.5 in / 50 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Tender Waste Water Piping / 1.75 in / 25 ft
Galley/Mess deck/Crew Berthing/ Crew
See below
Tender Waste Water Piping / 2.0 in / 50 ft
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
See below
Table 2 – Overhead Insulation Renewal
Description
(Area/Approximate Square feet)
Location
Insulation Material
Overheads/1500 sq feet
Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room
BFG 261 (MIL-C-20079) or equivalent
Table 3 – Overhead Repairs
Description
(Area/Approximate Size)
Location
Drawing
300 sq ft of overhead panels
Galley/Mess Deck
See below
The goal is to return CGC WEDGE habitability areas to an appropriately insulated area.
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery
NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details
Coast Guard Drawing 75D-WAGL-3801-1 Vent Heating & A/C
Coast Guard Drawing 75D-WAGL-3901-1, Insulation & Sheathing Schedule (75306-75307)
Coast Guard Drawing 75D-WAGL 3902-1 Rev 1, JOINER DETS ENG RM (75306-75307
Coast Guard Drawing 75D-WAGL 3902-2 Rev 2, JOINER DETS MN DK & UPPER DK (75306-75307)
Coast Guard Drawing 75D-WAGL 3902-3 Rev 2, JOINER DETS WHEELHOUSE (75306-75307)
Unless otherwise stated, this contract applies to on-site support for USCGC WEDGE (WLR 75307) in Mobile, AL.
2.1 RENEW CHILLWATER PIPING IINSULATION
The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
NOTE
Although most of the chill water piping is exposed due to previous remediation work; the Contractor will have to remove some overhead and bulk head paneling to access some of the piping.
NOTE
Although pipe lengths, routes, and sizes are detailed in the specified drawings, the as-built configuration may vary slightly in routes, lengths, and sizes.
NOTE
Other surfaces/fittings affected include: brackets, bulkhead penetrations, flat work, and all other protrusions or fixtures that will condense due to relative humidity from surrounding atmosphere.
2.2 RENEW OVERHEAD INSULATION
The Contractor shall ensure all pipe insulation has been renewed by preforming a walkthrough of all spaces identified in section 2.1 with the Engineer Petty Officer (EPO) or the EPO’s designated representative.
3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
4.1 PERIOD of Performance
The period of performance for this contract shall start April 1, 2025 and end no later than 14 days after commencement of work.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at CGC WEDGE at 1500 15TH St., Mobile, AL 36615 unless an alternate location is approved by the Coast Guard.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s operations.
4.4 TRAVEL
Contractor travel may be required to support this requirement. All travel required by this task shall be provided by the Contractor at no expense to the Government.
5.0 GOVERNMENT FURNISHED RESOURCES
Bulkhead and Overhead panels previously removed during remediation efforts.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.
The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report and warranty no later than 7 days after returning to the home office.
RDD/POP: 04/01/2025- 04/14/2025
Delivery address and ATTN to:
MKC Zachary Mason
CGC Wedge (WLR-75307)
1500 15TH St.,
Mobile, AL 36615
251-214-5671

With GovernmentContracts, you can:
...Follow Z1DA--679-24-102 B18 Laundry Renovations & Additions Active Contract Opportunity Notice... unchanged. ___________________________________ ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/19/2026
...LARGE QUANTITIES PRIMARILY FOR MANUFACTURING JANITORIAL AND LAUNDRY PRODUCTS) 190 - CHEMICALS AND...
Shelby County, Alabama
Bid Due: 6/23/2026
...Laundry Bag (IPP LOGO) 1.2.8 Five hundred (500) 30 oz. Atlantic Cylindrical Water ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...Non-Woven Laundry Bag (IPP LOGO) 1.2.8 Five hundred (500) 30 oz. Atlantic Cylindrical ...
DEPT OF DEFENSE
Bid Due: 6/12/2026