WEDGE Renew Piping Insulation

Location: Alabama
Posted: Mar 6, 2025
Due: Mar 13, 2025
Agency: HOMELAND SECURITY, DEPARTMENT OF
Type of Government: Federal
Category:
  • 20 - Ship and Marine Equipment
Solicitation No: 70Z085Q250011548
Publication URL: To access bid details, please log in.
Follow
WEDGE Renew Piping Insulation
Active
Contract Opportunity
Notice ID
70Z085Q250011548
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
SFLC PROCUREMENT BRANCH 2(00085)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: Mar 06, 2025 10:45 am PST
  • Original Published Date: Mar 06, 2025 10:13 am PST
  • Updated Date Offers Due: Mar 13, 2025 08:00 am PDT
  • Original Date Offers Due: Mar 13, 2025 08:00 am PDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Mar 13, 2025
  • Original Inactive Date: Mar 13, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 2090 - MISCELLANEOUS SHIP AND MARINE EQUIPMENT
  • NAICS Code:
    • 336611 - Ship Building and Repairing
  • Place of Performance:
    Mobile , AL 36615
    USA
Description

THIS IS TO BE AWARDED OFF OF LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.





STATEMENT OF WORK (SOW)



FOR



USCGC WEDGE Renew Piping Insulation, Overhead Insulation and Conduct Overhead Repairs





WEDGE has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).







1.0 GENERAL








    1. Background





The 75’ WLR asset, USCGC WEDGE needs approximately 500 linear feet of pipe insulation, 1500 square feet of overhead insulation, and 300 sq ft of overhead panels.








    1. Scope





The scope of this contract is defined by the efforts and tools required to support USCGC WEDGE (WLR 75307). The Contractor shall provide all labor, materials, and tools necessary to install insulation and bulkhead panels.





Table 1 -Pipe Insulation Renewal



Description



(System/ Pipe Diameter/ Linear Feet)



Location



Drawing



Tender Chill Water/ Potable Water Piping / .5 in / 50 ft



Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room



See below



Tender Chill Water/ Potable Water Piping / .75 in / 50 ft



Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room



See below



Tender Chill Water/ Potable Water Piping / .875 in / 50 ft



Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room



See below



Tender Chill Water/ Potable Water Piping / 1 in / 100 ft



Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room



See below



Tender Chill Water/ Potable Water Piping / 1 .25 in / 125 ft



Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room



See below



Tender Waste Water Piping / 1.5 in / 50 ft



Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room



See below



Tender Waste Water Piping / 1.75 in / 25 ft



Galley/Mess deck/Crew Berthing/ Crew



See below



Tender Waste Water Piping / 2.0 in / 50 ft



Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room



See below





Table 2 – Overhead Insulation Renewal



Description



(Area/Approximate Square feet)



Location



Insulation Material



Overheads/1500 sq feet



Galley/Mess deck/Crew Berthing/ Crew Head/Laundry/XPO State Room/ OIC State Room





BFG 261 (MIL-C-20079) or equivalent





Table 3 – Overhead Repairs



Description



(Area/Approximate Size)



Location



Drawing



300 sq ft of overhead panels



Galley/Mess Deck



See below










    1. OBJECTIVE





The goal is to return CGC WEDGE habitability areas to an appropriately insulated area.








    1. APPLICABLE DOCUMENTS












      1. Compliance Documents







The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:





Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2022, General Requirements



Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures



ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery



NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details



Coast Guard Drawing 75D-WAGL-3801-1 Vent Heating & A/C



Coast Guard Drawing 75D-WAGL-3901-1, Insulation & Sheathing Schedule (75306-75307)



Coast Guard Drawing 75D-WAGL 3902-1 Rev 1, JOINER DETS ENG RM (75306-75307



Coast Guard Drawing 75D-WAGL 3902-2 Rev 2, JOINER DETS MN DK & UPPER DK (75306-75307)



Coast Guard Drawing 75D-WAGL 3902-3 Rev 2, JOINER DETS WHEELHOUSE (75306-75307)










  1. SPECIFIC REQUIREMENTS/TASKS



Unless otherwise stated, this contract applies to on-site support for USCGC WEDGE (WLR 75307) in Mobile, AL.





2.1 RENEW CHILLWATER PIPING IINSULATION



The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.










      1. Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.














      1. Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).







NOTE



Although most of the chill water piping is exposed due to previous remediation work; the Contractor will have to remove some overhead and bulk head paneling to access some of the piping.














      1. Renewal. The Contractor shall renew all piping system insulation identified in Table 1 and using the relevant Coast Guard Drawing(s) as guidance.









NOTE



Although pipe lengths, routes, and sizes are detailed in the specified drawings, the as-built configuration may vary slightly in routes, lengths, and sizes.














      1. Removal. The Contractor shall remove all existing insulation material over the designated pipe surfaces, including associated pipe hangers, valves, fittings, and flanges.














      1. Disposal. The Contractor shall dispose of all removed materials in accordance with all applicable federal, state, and local regulations.









NOTE



Other surfaces/fittings affected include: brackets, bulkhead penetrations, flat work, and all other protrusions or fixtures that will condense due to relative humidity from surrounding atmosphere.












      1. Surface preparation. The Contractor shall clean all exposed pipe and pipe component surfaces with a soft bristle brush and a mild detergent solution to remove all visible surface contaminants.














      1. New insulation installation - interior refrigerant, hot water and cold and chill water piping systems (Temperature Range: -20 to +180 Deg. F). The Contractor shall install new insulation material over the exposed pipe surfaces, including associated pipe hangers, valves, fittings, and flanges, in accordance with details in NAVSEA Drawing 804-5959214; select appropriate insulation materials and thicknesses for the application and temperature ranges specified in ASTM F683, Tables S1.1 and 5.














      1. Preservation. The Contractor shall paint the newly installed insulation system, in accordance with SFLC Std Spec 6310, using the system specified for “Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam” in Appendix B (Cutter and Boat Interior Paint Systems).









2.2 RENEW OVERHEAD INSULATION



The Contractor shall ensure all pipe insulation has been renewed by preforming a walkthrough of all spaces identified in section 2.1 with the Engineer Petty Officer (EPO) or the EPO’s designated representative.








      1. Renew insulation. The Contractor shall renew/install overhead insulation as identified in Table 2 and using the relevant Coast Guard Drawing(s) as guidance.














      1. Overhead Repairs The Contractor shall remove all overhead panels in all spaces identified (exception being Galley).
















        1. The contractor shall identify all overhead mounted components to include but not limited to overhead cables, light fixtures, detectors, etc. and install brackets or new mounts to accommodate new overhead insulation.

        2. The contractor shall identify paint any remaining exposed surfaces as necessary.
















      1. Renew galley overhead panels. The Contractor shall replace overhead panels that were previously removed as identified by ships force and Table 3.












  1. CONTRACTOR PERSONNEL





3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.








  1. OTHER APPLICABLE CONDITIONS





4.1 PERIOD of Performance



The period of performance for this contract shall start April 1, 2025 and end no later than 14 days after commencement of work.





4.2 PLACE OF PERFORMANCE



The primary place of performance will be at CGC WEDGE at 1500 15TH St., Mobile, AL 36615 unless an alternate location is approved by the Coast Guard.





4.3 HOURS OF OPERATION



Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s operations.





4.4 TRAVEL



Contractor travel may be required to support this requirement. All travel required by this task shall be provided by the Contractor at no expense to the Government.







5.0 GOVERNMENT FURNISHED RESOURCES



Bulkhead and Overhead panels previously removed during remediation efforts.





6.0 CONTRACTOR FURNISHED PROPERTY



The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.






  1. GOVERNMENT ACCEPTANCE PERIOD



The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.





8.0 DELIVERABLES



The Contractor shall provide a trip report and warranty no later than 7 days after returning to the home office.





RDD/POP: 04/01/2025- 04/14/2025





Delivery address and ATTN to:



MKC Zachary Mason



CGC Wedge (WLR-75307)



1500 15TH St.,



Mobile, AL 36615



251-214-5671


Attachments/Links
Contact Information
Contracting Office Address
  • COAST GUARD ISLAND, BLDG 50-7
  • ALAMEDA , CA 94501
  • USA
Primary Point of Contact
Secondary Point of Contact
History
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow Z1DA--679-24-102 B18 Laundry Renovations & Additions Active Contract Opportunity Notice... unchanged. ___________________________________ ...

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/19/2026

...LARGE QUANTITIES PRIMARILY FOR MANUFACTURING JANITORIAL AND LAUNDRY PRODUCTS) 190 - CHEMICALS AND...

Shelby County, Alabama

Bid Due: 6/23/2026

...Laundry Bag (IPP LOGO) 1.2.8 Five hundred (500) 30 oz. Atlantic Cylindrical Water ...

DEPT OF DEFENSE

Bid Due: 6/12/2026

...Non-Woven Laundry Bag (IPP LOGO) 1.2.8 Five hundred (500) 30 oz. Atlantic Cylindrical ...

DEPT OF DEFENSE

Bid Due: 6/12/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.