Liquid Filled Pad Mounted Transformers

Location: South Carolina
Posted: Jul 1, 2024
Due: Aug 1, 2024
Agency: Aiken County
Type of Government: State & Local
Category:
  • 59 - Electrical and Electronic Equipment Components
  • 61 - Electric Wire, and Power and Distribution Equipment
Solicitation No: Bid Number: 25-06-B
Publication URL: To access bid details, please log in.
Procurement Bids


Bid Number:
25-06-B
Category:
Bid
Bid Name:
Liquid Filled Pad Mounted Transformers
Date Entered:
06/30/2024
Award Date:
Â
Distribution Date:
07/01/2024
Opening Date:
08/01/2024
Description:

Aiken County Government is soliciting sealed Bids for Liquid Filled Pad Mounted Transformers. Bids will be accepted until 3:00 p.m. August 1st 2024 in the Procurement Office, 1930 University Pkwy, Suite 3201, Aiken, SC 29801 then read aloud.

Bid Documents and Specifications may be viewed online at: https://www.aikencountysc.gov/Depts/PRC/PRCmain .

Questions can be emailed to procurement@aikencountysc.gov until 3:00 p.m. July 23rd 2024. Answers will be posted on our website July 26th , 2024 before 3:00p.m.
Phone calls will not be accepted.

Aiken County Procurement will not be held responsible for notifying vendors of any addenda. These are posted to our website. Please check before finalizing your bid package.


Notes:

Documents

Jul 01, 2024 12:13 PM
Specifications

Jul 01, 2024 12:12 PM
Bid Invitation To Submit

Attachment Preview

SECTION 16322
LIQUID FILLED PAD MOUNTED TRANSFORMERS
PART 1 -- GENERAL
1.1 THE REQUIREMENT
A. The Contractor shall furnish, install, and test liquid filled, pad-mount transformers for power
distribution systems as specified herein, as indicated on the Drawings, and as required to
complete the electrical installations.
B. All equipment specified in this Section shall be furnished by the transformer manufacturer who
shall be responsible for the suitability and compatibility of all included equipment.
C. Reference Section 16400, Electrical.
1.2 CODES AND STANDARDS
A. The liquid filled pad-mount transformer shall comply with the following codes and standards:
1. American National Standards Institute (ANSI):
a. ANSI C57.12.00-Latest Revision, General Requirements for Liquid Immersed
Distribution, Power, and Regulating Transformers.
b. ANSI C57.12.28-Latest Revision, Switchgear and Transformers, Pad-mounted
Equipment -Enclosure Integrity.
c.
ANSI C57.12.26-Latest Revision, Standard for Transformers, Pad-mounted,
Compartmental Type, Self-Cooled Three Phase Distribution Transformer for Use
with Separable Insulated High Voltage Connectors (34,500 GrdY/19,920 Volts and
Below, 2500 kVA and Smaller).
d. ANSI C57.12.90-Latest Revision, Test Code for Liquid-Immersed Distribution
Power, and Regulating Transformers and Guide for Short Circuit Testing of
Distribution and Power Transformers.
e. ANSI/IEEE 386-1985, Separable Insulated Connectors for Power Distribution
Systems Above 600 Volts.
2. Institute of Electrical and Electronic Engineers (IEEE)
3. National Electrical Code (NEC)
HORSE CREEK WWTP
PAD MOUNTED TRANSFORMERS
16322-1
Project No. 23066
4. National Electrical Manufacturers Association (NEMA)
a.
NEMA 210
1.3 SUBMITTALS
A. In accordance with the procedures and requirements set forth in the General Conditions and
Section 01300, Submittals, the Contractor shall obtain from the equipment manufacturer and
submit the following:
1. Shop Drawings
2. Operation and Maintenance Manuals
3. Spare Parts List
4. Special Tools List
5. Reports of Certified Shop Tests
B. Each submittal shall be identified by the applicable specification section.
1.4 SHOP DRAWINGS
A. Each submittal shall be complete in all respects, incorporating all information and data listed
herein and all additional information required for evaluation of the proposed equipment's
compliance with the Contract Documents.
B. Partial, incomplete or illegible submittals will be returned to the Contractor without review for
resubmittal.
C. Shop drawings shall include but not be limited to:
1. Product data sheets.
2. Sample equipment nameplate diagram.
3. Drawings showing clearly marked overall dimensions for each transformer. Drawings shall
show conduit stub-up area locations.
4. Weight of each transformer.
5. Proof of ISO 9001 registration.
HORSE CREEK WWTP
PAD MOUNTED TRANSFORMERS
16322-2
Project No. 23066
D. The submittal information shall reflect the specific equipment identification number as indicated
on the Drawings.
E. The shop drawing information shall be complete and organized in such a way that the Engineer
can determine if the requirements of these Specifications are being met. Copies of technical
bulletins, technical data sheets from "soft-cover" catalogs, and similar information which is
"highlighted" or somehow identifies the specific equipment items that the Contractor intends to
provide are acceptable and shall be submitted.
1.5 OPERATION AND MAINTENANCE MANUALS
A. The Contractor shall submit operation and maintenance manuals in accordance with the
procedures and requirements set forth in the General Conditions and Division 1.
1.6 TOOLS, SUPPLIES AND SPARE PARTS
A. The transformers shall be furnished with all special tools necessary to disassemble, service, repair
and adjust the equipment. All spare parts as recommended by the equipment manufacturer shall
be furnished to the Owner by the Contractor.
The Contractor shall furnish the following minimum spare parts for each transformer.
No. Required
1 set
Description
Primary fuses of each size provided.
B. The spare parts shall be packed in containers suitable for long term storage, bearing labels clearly
designating the contents and the pieces of equipment for which they are intended.
C. Spare parts shall be delivered at the same time as the equipment to which they pertain. The
Contractor shall properly store and safeguard such spare parts until completion of the work, at
which time they shall be delivered to the Owner.
D. Spare parts lists, included with the Shop Drawing submittal, shall indicate specific sizes, quantities,
and part numbers of the items to be furnished. Terms such as "1 lot of packing material" are not
acceptable.
E. Parts shall be completely identified with a numerical system to facilitate parts inventory control
and stocking. Each part shall be properly identified by a separate number. Those parts which are
identical for more than one size, shall have the same parts number.
1.7 IDENTIFICATION
A. Each transformer shall be identified with the identification number indicated on the Drawings. A
nameplate shall be securely affixed in a conspicuous place on each transformer.
HORSE CREEK WWTP
PAD MOUNTED TRANSFORMERS
16322-3
Project No. 23066
PART 2 -- PRODUCTS
2.1 MANUFACTURERS
A. The equipment covered by this Specification is intended to be standard equipment of proven
performance as manufactured by reputable concerns. Equipment shall be designed, constructed
and installed in accordance with the best practices of the trade, and shall operate satisfactorily
when installed as shown on the Drawings.
B. All transformer manufacturers shall be registered as an ISO 9001 quality manufacturer. The
manufacturer shall supply documentation to attest to this registration.
C. Liquid filled pad-mount transformers shall be by the Square D Company, Eaton/Cutler-Hammer,
the General Electric Company, Siemens Energy and Automation, Inc., Cooper Power Systems, Inc.,
or equal.
2.2 PAD-MOUNT TRANSFORMERS
A. Pad-mount transformers shall be of a compact design. The transformer kVA rating shall be as
indicated on the Drawings. All units shall be a pad mounted compartmental type, which when
assembled shall be an integral unit for mounting on a pad. All units shall be designed to comply
with the short circuit capability requirements of ANSI C57.12.00.
B. The transformer shall carry its continuous rating with average winding temperature rise by
resistance that shall not exceed 55 degrees C rise, based on an average ambient of 30 degrees C
over 24 hours with a maximum of 40 degrees C. The insulation system shall allow an additional
12% kVA output at 65 degrees C average winding temperature rise by resistance, on a continuous
basis, without any decrease in normal transformer life, as defined by ANSI C57.12.00.
Primary bushings shall be rated 200 Amperes.
C. Coolant and insulating fluid shall be Envirotemp FR3.
D. The high voltage windings shall be rated 12.47kV and 95kV BIL unless indicated otherwise on the
Drawings for use on a solidly grounded system and shall have two (2) 2-1/2% full capacity taps
above and below rated voltage. Impedance shall be 5.75% subject to NEMA/ANSI ± 7.5%
impedance tolerance.
E. The low voltage windings shall be rated 480Y/277VAC and 30kV BIL unless indicated otherwise on
the Drawings. Transformers shall be designed for either step up or step down use.
F. Low voltage neutrals shall be connected internally to the secondary neutral lugs and brought out
to an insulated low voltage neutral spade type bushing with an externally removable ground strap.
The low voltage neutral shall be a fully insulating bushing. A ground pad shall be provided on the
outer surface of the tank with one or more removable ground straps suitably sized for the short
HORSE CREEK WWTP
PAD MOUNTED TRANSFORMERS
16322-4
Project No. 23066
circuit rating of the transformer provided and connected between the neutral bushing and the
ground pad.
G. High and low voltage windings shall be copper.
H. The transformer and associated terminal compartments shall be so designed and constructed as
to be tamper resistant. There shall be no screws, bolts, or other fastening devices which are
externally removable. Transformers shall be suitable for outdoor installation without a fence or
other area enclosure. Full height, air filled incoming and outgoing terminal compartments with
hinged doors shall be located side by side separated by a steel barrier, with the incoming (primary)
compartment on the left. The lift-off doors shall be equipped with stainless steel hinges to allow
the doors to be removed and door stops to hold the doors open if not removed while working in
the compartments. The incoming compartment shall be accessible only after the door to the
outgoing (secondary) compartment has been opened. To facilitate making connections and
permit cable pulling, the doors shall be removable. Removable door sill on compartments shall be
provided to permit rolling or skidding of unit into place over conduit "stub-ups" in foundation.
Locking provisions shall be provided in accordance with Paragraph 7 of ANSI C57.12.26-Latest
Revision utilizing a captive penta-head bolt. Enclosure security shall conform with Paragraph 4 of
ANSI C57.12.20-Latest Revision.
I. The high voltage incoming line compartment shall be dead-front, shall enclose the high voltage
bushings, and provide for cabling from below. Externally clamped dead-front primary bushings
shall be universal bushing wells with dead front inserts or dead front, "feed thru" inserts as
required. The compartment shall have a hinged door with a fastening device which is accessible
only through the low voltage compartment and makes possible the use of a single padlock.
The Contractor shall furnish dead front, load break elbow cable terminators.
J. Furnish a load break, gang operated, liquid immersed switch that is externally operable from the
high voltage compartment through the use of a distribution hot-stick. Switch shall be the 2-
position "OFF-ON" type for use on a radial feed system. Liquid-immersed switch shall be rated
200A.
K. Primary fusing shall be:
1. BAY-O-NET type oil immersed fuses in series with oil immersed current-limiting fuses.
BAY-O-NET fuses are to be externally replaceable with a hot-stick without opening the
transformer tank.
L. The low voltage incoming line compartment shall be live-front, shall be arranged for cabling from
below, and shall contain 3-spade type externally clamped bushings for phase connections and
1-spade type bushing for neutral and/or ground connection. Low voltage bushings shall be
supported with an insulating material in a manner designed to counteract any downward forces
resulting from the connection of multiple cables to the bushings. Any manufacturer not supplying
these supports will have the transformer returned to them at their expense for reworking. Spades
HORSE CREEK WWTP
PAD MOUNTED TRANSFORMERS
16322-5
Project No. 23066
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow USCGC JAMES DS FQ3 FY25 Active Contract Opportunity Notice ID JAMES_DS_FQ3_FY25 Related

HOMELAND SECURITY, DEPARTMENT OF

Bid Due: 1/17/2025

Follow FY 26 MACC for Shaw AFB, SC Active Contract Opportunity Notice ID

DEPT OF DEFENSE

Bid Due: 1/16/2025

Follow Medical Waste Removal Services for the WJB Dorn VAMC in Columbia, SC

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 1/30/2025

Follow Title Abstract Search and Settlement/Closing Services in South Carolina Active Contract Opportunity

AGRICULTURE, DEPARTMENT OF

Bid Due: 1/20/2025

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.