Bid Proposal Library Interior Painting

Location: Michigan
Posted: Dec 9, 2025
Due: Dec 12, 2025
Agency: Bedford township
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Proposal Library Interior Painting

Attachment Preview

REQUEST FOR SEALED BID
Provide labor, material, and equipment to paint the interior of the Bedford Township
Branch Library, 8575 Jackman Road, Temperance, MI 48182 in three phases over a
period of three years.
Bids should be marked “Paint the Bedford Branch Library” and will be accepted during regular business
hours 8-5 daily at the Bedford Township Government Center located at 8100 Jackman Road, Temperance,
MI 48182. They can be hand delivered or delivered by courier/mail to:
Bedford Township Government Center
Attention: Trudy Hershberger, Clerk
8100 Jackman Road
Temperance, MI 48182
Bids must be received no later than Friday December 12th, 2025 at 4:00 PM at the Clerks Office. Bid
proposals received after this time will not be considered or accepted. Oral, telephone, fax or electronic
mail bids are invalid and will not receive consideration. Bids will be opened by the Clerk’s Office at their
earliest convenience and may not be opened immediately following the bid deadline
All bidders must provide familial disclosure in compliance with MCL 380.1267 and attach this
information to the bid proposal. The bid proposal will be accompanied by a sworn and notarized
statement disclosing any familial relationship that exists between the owner or any employee of the bidder
and any member of the Bedford Township Board or employee of the Monroe County Library System.
All bids will remain firm for a period, at minimum, of 60 days.
The Bedford Township Board of Trustees reserves the right to accept or reject any or all bids, to award
the contract to other than the low bidder; to waive any irregularities and/or informalities; and in general,
to make awards in any manner deemed to be in the best interest of the Township.
To set up an appointment to view the area, please call the Bedford Branch Library asking for Jodi
Russ at 734-847-6747 or Chase Lindecker at 734-224-7322.
Examination of Specifications, and site is to be done by each bidder. Each Bidder is to thoroughly
examine the work site and be familiar with the specification and do their own measurements. The failure
or omission of any bidder is to do the above shall in no way relieve the bidder from any obligation with
respect their bid. By submitting a bid, the Bidder agrees and warrants that he/she has done the above. No
claim for additional compensation will be considered or paid to the Contractor due to Bidder's failure to
examine the site. If unforeseen issues should occur from the original scope of work that would be deemed
an extra, that will be brought forth to the Bedford Township Board of Trustees for necessary approvals.
All bids will contain the proposed completion date for the project. Bidder needs to have general liability
insurance, workmen's compensation insurance and provide certificates to the Clerk's office. In addition (3)
references are requested of work performed for others.
1
Provide labor, material, and equipment to paint the interior of the Bedford Township
Branch Library, 8575 Jackman Road, Temperance, MI 48182 in three phases over a
period of three years.
BID SUBMISSION REQUIREMENTS
Each sealed bid must include:
- Completed Bid Form (attached or available separately)
- Manufacturer specification sheet(s)
- Warranty documentation
- Pricing breakdown
- Liability insurance policy
- Workman’s Comp insurance
- Completed W-9 Form
- Copies of any insurance or IRS forms need to be provided to the Clerk’s Office. If any of the
above coverages expire during the term of this contract, the firm shall deliver renewal
certificates and endorsements to the Township of Bedford at least ten (10) days prior to the
expiration date.
- Familial relationship disclosure form (notarized and signed)
SPECIFICATIONS
PART 1 Part 1 GENERAL
1.1 RELATED DOCUMENTS
1. Drawings and general provisions of the Contract, including Terms, General and
Supplementary Conditions.
a. Bedford Township Branch Library Painting Schedule
b. Bedford Township Branch Library East Side
c. Bedford Township Branch Library West Side
d. Bedford Township Branch Library Bid Sheet
e. Familial Disclosure
f. Contractor References
2. Section includes surface preparation and the application of paint systems for:
a. Gypsum board
b. Plaster
c. Steel (window frames, door frames, doors)
1.2 ACTION SUBMITTALS
1. Product Data: For each type of product include preparation requirements and application
instructions.
2
2. Indicate VOC content.
3. Sustainable Design Submittals:
a. “Product Data” Subparagraph below applies to LEED 2009 NC, CI, and CS.
Coordinate with requirements for paints and coatings.
b. Product Data for LEED 2009 Credit EQ 4.2: For paints and coatings, showing printed
statement of VOC content.
4. Laboratory Test Reports:
a. For paints and coatings, indicating compliance with LEED 2009 Credit EQ 4.2
requirements for low-emitting materials.
b. Label each Sample for location and application area.
5. Product List: For each product indicated, include the following:
a. Cross-reference to paint system and locations of application areas. Use same
designations indicated on Drawings and in schedules.
b. Indicate VOC content.
1.3 CLOSEOUT SUBMITTALS
1. Maintenance Manual: Provide painting maintenance manual including area summary with
finish schedule, area detail designating location where each product/color/finish was used,
product data pages, material safety data sheets, care and cleaning instructions, touch-up
procedures, and color samples of each color and finish used.
1.4 MAINTENANCE MATERIAL SUBMITTALS
1. Finish extra materials that match products installed and that are packaged with protective
covering for storage and identified with labels describing contents.
2. Paint: One gallon of each material and color applied marked with Color number and locations
used.
1.5 QUALITY ASSURANCE
1. Applicator Qualifications: A firm and individuals experienced in applying paints and coatings
similar in material, design and to the extent indicated for this project. A Firm and individuals
whose work has resulted in application with a record of successful in-service performance.
2. Apply a three foot by three foot splotch of each paint system and color at locations selected by
the owner.
1.6 DELIVERY, STORAGE, AND HANDLING
1. Delivery and Handling: Deliver products to Project site in an undamaged condition in
manufacturer’s original sealed containers, complete with labels and instructions for handling,
sorting, unpacking, protecting, and installing. Packaging shall bear the manufacturer’s label
with the following information:
a. Product name and type (description).
b. Batch date.
3
c. Color number.
d. VOC content.
e. Environmental handling requirements.
f. Surface preparation requirements.
g. Application instructions.
2. Store materials not in use in tightly covered containers in well-ventilated areas with ambient
temperatures continuously maintained at not less than 50 degrees.
3. Maintain containers in clean condition, free of foreign materials and residue.
4. Remove rags and waste from the facility daily.
5. If necessary, insert special requirements for fire protection, heating, ventilation, and other
conditions for storage areas on-site.
1.7 FIELD CONDITIONS
1. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are
between 50 and 90 degrees.
2. Do not apply paints when relative humidity exceeds 85 percent; at temperatures less than 5
degrees above the dewpoint; or to damp or wet surfaces.
3. Lead Paint: it is not expected that lead paint will be encountered in the work as the building
was built in 2004.
PART 2 PRODUCTS
2.1 MANUFACTURERS
1. Sherwin-Williams or equal
2. Comparable Products: Comparable products of approved manufacturers will be considered
including the following:
a. Products are approved by manufacturer in writing for application specified.
b. Products meet performance and physical characteristics of basis of design product
including published ratio of solids by volume, plus or minus two percent.
3. All paint materials will come from a single source and from a single listed manufacturer.
4. Manufacturers listed color schedule are for color reference only and do not indicate prior
approval.
2.2 PAINT, GENERAL
1. Definitions: Standard coating terms defined in ASTM D 16 apply.
a. Flat refers to a lusterless or matte finish with a gloss range below 15 when measured at
an 85-degree meter.
b. Eggshell refers to a low-sheen finish with a gloss range between 20 and 35 when
measured at a 60-degree meter.
c. Semi-gloss refers to a medium-sheen finish with a gloss range between 35 and 70 when
measured at a 60-degree meter.
4
d. Full gloss refers to a high-sheen finish with a gloss range more than 70 and 35 when
measured at a 60-degree meter.
2. Material Compatibility:
a. Provide materials for use within each paint system that are compatible with one another
and substrates indicated, under conditions of service and application as demonstrated
by manufacturer, based on testing and field experience.
b. For each coat in a paint system, provide products recommended in writing by
manufacturers of topcoat for use in paint system and on substrate indicated.
3. VOC Content:
a. For interior paints applied the following VOC limits exclusive of colorants added to a
tint base, when calculated according to 40 CFR 59, Subpart D (EPA)
b. Flat Paints and Coatings: 50 g/L.
c. Non-flat Paints and Coatings: 150 g/L.
d. Primers, Sealers, and Undercoaters: 200 g/L
4. Colors: See the paint schedule for colors.
PART 3 EXECUTION
3.1 EXAMINATION
1. The library facility will be in service during the execution of this project. Limited areas will
need to be isolated from the public. Performance outside business hours is recommended.
2. The painter will work with and provide a schedule to coordinate book removal and
reinstallation with library personnel.
3. Examine existing surfaces and conditions. Patch any and all surface imperfections in order to
provide a smooth and uniform painted surface.
4. Report, in writing, conditions that may affect application, appearance, or performance of paint.
5. The project intent is to paint over all the painted surfaces in the library in a rotation to
complete the entire building once every five years.
3.2 PREPARATION
1. Comply with manufacturer’s written instructions and recommendations in “MPI Manual”
applicable to substrates indicated.
2. Remove hardware, covers, plates, bookshelves and similar items already in place that are
removable and are not to be painted. If removal is impractical or impossible because of size or
weight of item, provide surface-applied protection before surface preparation and painting.
3. All books on shelves attached to walls shall be removed by library personnel.
4. All shelving shall be removed by the painter, marked and returned to the original location.
The shelf support tracks shall be covered and protected before surface preparation and
painting.
5. After completing painting operations reinstall items that were removed. Remove surface-
applied protection if any.
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...-Heritage Manor: Exterior Cleaning and Painting 6/22/2026 10:00:00 AM INVITATION TO BID OWNER ...

U.P. Engineers & Architects, Inc

Bid Due: 6/22/2026

..., wall and floor patching, painting, door and frame replacements, door hardware updates, ...

Monroe Public Schools

Bid Due: 7/01/2026

...Code: 238320 - Painting and Wall Covering Contractors Place of Performance: Saginaw , ...

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/12/2026

...(5) facility booster station sites and as needed facility painting activities performed by ...

Great Lakes Water Authority

Bid Due: 7/13/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.