| Location: | Georgia |
|---|---|
| Posted: | Jul 30, 2025 |
| Due: | Sep 4, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-72650-NONST-2026-000000034 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-72650-NONST-2026-000000034 | BID 26-001 COG Kincaid and Hamilton Intersection Realignment and East College Street Sidewalk | Griffin , City Of |
Jul 30, 2025 @ 04:04 PM
|
Sep 04, 2025 @ 02:00 PM
|
Start Date: Jul 30, 2025 @ 04:04 PM ET
End Date:
Sep 04, 2025 @ 02:00 PM ET
Project A ¿ Hamilton Boulevard Realignment
The project consists of the demolition and relocation of approximately 386 linear feet of 24-foot-wide local street along with milling and new overlay of the remaining 1,259 linear feet of existing roadway. The street construction includes asphalt paving and concrete curb and gutter. Utility work on the project includes replacement of the existing 18-inch storm pipe system and two catch basins and installation of approximately 1,661 linear feet of 12¿ C900 PVC water main and related appurtenances. A new 5-foot-wide sidewalk is to be constructed on the relocated section of the street and along the remainder of the existing street totaling 1,435 linear feet. A Contech steel pedestrian bridge with concrete abutments will be constructed for a sidewalk creek crossing.Project B ¿ Hamilton Boulevard Overlay
The project also consists of approximately 1,440 square yards of milling and paving on Hamilton Boulevard east of Memorial Drive to the City of Griffin city limits. The milling and paving includes thermoplastic striping and minor concrete work at driveways.Project C ¿ E. College Street Sidewalk
The project consists of the installation of approximately 2,450 linear feet of 5-foot-wide sidewalk and related grading. The construction driveway will require modifications on College Street and removal of shrubs and trees.
| Code | Description |
| 91355 | Construction, Tunnel |
| 91384 | Maintenance and Repair, Streets, Major and Residential |
| 91395 | Paving and Resurfacing, Highway and Road |
| 91350 | Construction, Streets, Major and Residential, Including Reconstruction |
April Meeks
afmeeks@cityofgriffin.com
770-229-6621

With GovernmentContracts, you can:
...FY 2026 Signage & Striping Improvements Pineview, City Of May 12, 2026 @ ...
State Government of Georgia
Bid Due: 6/16/2026
...2025 Road Striping Project Part 2 Start Date: 05/19/2026 5:00 PM Close Date: ...
County of Bryan
Bid Due: 6/18/2026
...Road Striping (LMIG-SAP) - Part 2 Bryan County Board Of Commissioners May 28, ...
State Government of Georgia
Bid Due: 6/18/2026
...26067-A: Lake Kedron Parking Lot Striping Fayette County Board Of Commissioners May 22, ...
State Government of Georgia
Bid Due: 6/11/2026