| Location: | Mississippi |
|---|---|
| Posted: | Aug 28, 2025 |
| Due: | Sep 10, 2025 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 12FPC325Q0046 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Erosion Control measures on J.E. Perkins Road in Forrest County, Mississippi
This project consists of all labor and materials to restore and stabilize the channel and exposed waterline along J. E. Perkins Road in Forrest County, Mississippi. Rock riprap and Concrete Grout will be installed for approximately 175 feet to stabilize and protect the streambanks and utilities. All disturbed areas will be graded to provide positive drainage and seeded/mulched to provide permanent vegetative cover (see Attachment A & B Specifications/Drawings for details).
***Per Clause 52.228-13 Alternative payment Protections, the contractor shall submit a form of payment protection after award***
The solicitation is set aside for Total Small Business.
In accordance with FAR 36.204, the estimated magnitude of the project is between $25,000 through $100,000.
A firm fixed price construction contract is anticipated.
A site visit will be on Wednesday, September 3, 2025, at 10:00 am CST.
Attendees may meet at USDA-NRCS Area Office, 113 Fairfield Drive, Ste. 110, Hattiesburg, MS 39402
In accordance with FAR 28.102-1, performance and payment bonds are required for any construction exceeding $150,000. For proposals between $35,000 and 150,000, the Contracting Officer requires a payment bond and an irrevocable letter of credit (ILC). The contractor will have 10 calendar days after award to satisfy this requirement.

With GovernmentContracts, you can:
...of improvements to Deana Road from Highway 90 to Ocean Springs Road, construction ...
State Government of Mississippi
Bid Due: 6/17/2026
...for the construction of a concrete sidewalk along a portion of College Street, ...
State Government of Mississippi
Bid Due: 6/09/2026
...Annual Contract for Concrete Pilings #20370 StatusAccepting Bids Bid Date 6/11/26 12:00pm Company... ...
Jackson County
Bid Due: 6/11/2026
...of a concrete pathway, drainage system improvements and water system upgrades. Bids will ...
City of Ocean Springs
Bid Due: 6/17/2026