Riverfront Painting Upgrades

Location: Indiana
Posted: Nov 2, 2026
Due: Nov 17, 2026
Agency: City of Evansville
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
DEPARTMENT DESCRIPTION ATTACHED DOCUMENT CLOSE DATE
Levee Authority

Riverfront Painting Upgrades

IFB-949-01-2026

Addendum 1

Tuesday, November 17, 2026 9:00 AM CDT

Attachment Preview

Invitation For Bids:
IFB-949-01-2026
Project: Evansville Riverfront Painting Upgrades
Issue Date: October 26, 2026
Issued By: City of Evansville - Vanderburgh County Levee Authority District
Transmitted Via: City of Evansville - Purchasing Department Webpage
https://www.evansvillegov.org/city/department/division.php?structureid=133
Bids Due: November 17, 2026, at 9:00 am CDT
1200 Stanley Ave.
Evansville, IN 47711
1

SECTION 1 - INTRODUCTION & VENDOR INSTRUCTIONS
1. Purpose
The Evansville-Vanderburgh Levee Authority District ("Board"), by and through the City of Evansville-Vanderburgh
County Levee Authority (Department), is seeking competitive sealed bids from qualified contractors to complete
upgrades to the Evansville Riverfront through a comprehensive painting and coatings project. This IFB defines the
minimum project requirements and outlines the responsibilities and expectations for all potential Vendors
("Respondents" or "Contractors").
Vendors are encouraged to review the full project scope and site conditions carefully before preparing a response.
2. Contractor Responsibilities
Contractors responding to this IFB are expected to provide all necessary labor, materials, tools, equipment, and
services to successfully complete the project. At a minimum, the selected Contractor will be responsible for:
* Procuring all materials and supplies required for performance of the work.
* Providing all labor, tools, and equipment needed to complete the project safely and efficiently.
* Implementing all necessary pedestrian and/or vehicle traffic control measures.
* Meeting all local licensing requirements under Evansville Municipal Code 3.95.030 at the time of bid opening.
* Ensuring that any prime Contractor submitting a bid over $150,000 meets Responsible Respondent criteria
pursuant to Evansville Municipal Code 3.95.040.
* Maintaining a compliant written drug-testing program for bids exceeding $10,000, in accordance with
Municipal Code 3.95.020.
* Maintaining all required liability, workers' compensation, and specialty insurance coverage throughout the
duration of the contract, as specified in the General Conditions.
3. Project Schedule
Bid documents available to bidders October 26, 2026.
Pre-bid meeting November 2, 2026
Last day for contractor questions November 6, 2026
Final addendum (if applicable) November 11, 2026
Bids due November 17, 2026
Anticipated contract award December 1, 2026
*The Successful Bidder will begin within ten (10) days of notice to proceed.
*The Successful Bidder will have work completed within 60 days of notice to proceed.
4. Pre-Bid Conference
A mandatory pre-bid conference will be held on November 2, 2026, at 10:00 AM (local time) at 1200 Stanley
Ave. Evansville, IN 47711. Failure to attend will result in the Vendor being deemed non-responsive.
5. Right of Rejection
The Board reserve the right to reject any one or all bids, or any part of any bid, to waive any irregularities in any bid,
and to award the purchase in the best interest of the City. Furthermore, the City reserves the right to hold the bid
of the three (3) lowest contractors for a period of sixty (60) calendar days from and after the time of the bid
opening.
6. Communication Protocol
2

To ensure a fair and consistent evaluation process, there shall be no verbal communication regarding this
solicitation between prospective bidders and any City of Evansville and/or Vanderburgh County employee,
representative, or Board member. All questions must be submitted in writing to DaChenae Streeter via email at
dstreeter@evansville.in.gov with the subject line: Evansville Riverfront Painting Upgrades.
Inquiries must be received no later than November 6, 2026. Questions received after this deadline may not be
answered.
Only written addenda issued by the City will modify this solicitation; verbal statements will not be binding. No
specification changes may be made within five business daysof the bid opening.
7. Access to Solicitation Documents
Vendors are responsible for reviewing all drawings, specifications, site conditions, and supporting materials before
submitting a bid. Failure to familiarize yourself with these documents will not relieve the Vendor of required
performance obligations
8. Bid Preparation & Submission Costs
Each vendor shall be responsible for all costs incurred in order to prepare and submit their response to this IFB.
9. Bid Bond
A bid bond or certified check equal to 5% of the total bid amount, payable to the Evansville-Vanderburgh Levee
Authority District.
No bid may be withdrawn for 30 days following the bid opening without written approval from the Evansville-
Vanderburgh Levee Authority District. Bonds and checks will be returned to unsuccessful contractors once
performance bond has been received from the awarded contractor.
10. Performance Bond
The successful Contractor shall furnish and pay for an approved one hundred percent (100%) Performance Bond
(Indiana Form 86A) pursuant to the provisions of I.C. 36-1-12-14 covering the faithful performance of the Contract
and the payment of all obligations arising thereunder, with such sureties as the Owner may approve, prior to work
beginning. The Performance Bond serves as a guarantee that all provisions of the solicitation, the specifications and
resulting Contract shall be met. The surety of the performance bond may not be released until one (1) year after the
date of the board's final settlement with the Contractor.
11. Public Bid Opening Procedures
At the public opening, only the following information will be given:
* Vendor name and amount of bid
No award will be made or implied at this time, unless otherwise indicated. Bids nor related documents will be
reviewed at the public opening. No discussion of any nature concerning brand names, deliveries, samples, etc. can be
entered into between any municipal employee and any contractor during or after the public opening until the
evaluation process has concluded and a recommendation for award has been made.
12. Public Records Disclosure
A. All submissions may be considered public documents under applicable laws and may be subject to disclosure.
Some solicitation records are public as soon as received by the City, others become public at public opening, and
others at contract award. Contractor recognizes and agrees that City will not be responsible or liable in any way
for any losses that the Contractor may suffer from the lawful disclosure of information or materials to third
3

parties.
B. Any materials requested to be treated as confidential documents, proprietary information, or trade secrets must
be clearly identified and readily separable from the balance of the bid submission. Such designations will not
necessarily be conclusive, and Contractor may be required to justify why such material should not, upon written
request, be disclosed by the City under the applicable public records act.
C. City will make reasonable effort to provide at least two (2) business days' notice to the Contractor of a public
records request for material submitted pursuant to this IFB (Invitation for Bid). The City will then release the
document in accordance with the City's policy for responding to such requests unless both of the following are true:
i. the Contractor responds to the notice with any objection to the production of the document within two (2)
business days of receipt of the notice; and
ii. the Contractor agrees in writing to indemnify City, in a form acceptable to City, in the event a challenge
is brought for withholding a public record based on Contractor having designated it a trade secret.
13. Bid Format & Submission Requirements
Each bid must:
* Be submitted in a sealed envelope clearly marked with the IFB number and project title.
* Include one (1) original, one (1) paper copy, and one (1) electronic copy (PDF on flash drive).
* Include unit pricing in both words and numerals, with written amounts governing in the event of
discrepancies.
* Be typewritten, complete, and signed by an individual authorized to bind the firm.
* Follow the sequence and format of the IFB; incomplete bids may be rejected.
The contents of this solicitation will become incorporated within any contract signed by the Board and the provider
of service. Do not retype this bid. Instead, respond on a separate page and cite the section number for each
response. All areas of the request must be addressed in the same sequence cited in the solicitation instructions in
order that proper consideration is given to the bid. Bids submitted without information or incomplete content may
result in the bid being removed from consideration.
14. Delivery of Bids
Contractors may deliver their sealed bid no later than 4:00 PM on November 16, 2026 at:
Purchasing Department
1 NW MLK Jr. Blvd. Room 323
Evansville, IN 47708
Bids submitted after November 16, 2026 at 4:00 PM CDT must be hand delivered to the Board secretary no later than
9:00 am CDT on November 17, 2026, at:
Levee Authority
1200 Stanley Avenue
Evansville, IN 47711
It is the sole responsibility of the vendor to see that their bid is received by the proper time at the proper location
described herein. Late bids will not be accepted or considered and will be returned unopened.
15. Evaluation of Bids
The City will select the lowest responsive and responsible Vendor whose bid best meets project requirements and
offers the most comprehensive and cost-effective approach
4

16. Right of Refusal
The Board reserves the right to reject any one or all bids, or any part of any bid, to waive any irregularities in any bid, and to
make award in the best interest of the Board /City. Furthermore, the City reserves the right to hold the bid of the three (3)
lowest Vendors for a period of sixty (60) calendar days from and after the time of the bid opening.
17. Award of Contract
It is the intent of the Board to enter into a contract with a provider that will emphasize administrative efficiencies, and
possess the capacity, infrastructure and organizational competence to perform required functions necessary for managed
care under this bid.
Award recommendations made by the purchasing department are contingent upon an initial evaluation of the
responsiveness of Contractor's bid submission. Contractor's qualifications to determine if the Contractor is a quality service
provider. The Contractor's policies and procedures may be evaluated as a further determination of quality.
The Board reserves the right to make award in the best interest of the Board /City.
The process of evaluating each Contractor's bid may involve interviews with a random sampling of the Contractor's current
and previous customers. This is not an exclusive criterion for awarding the contract.
It is anticipated that contract(s) will be awarded on or before December 1, 2026.
SECTION 2 - SPECIFICATION & SCOPE OF WORK
1. Project Specification
The Evansville Riverfront wall extends approximately 1,760 feet, with sections reaching 25 to 30 feet in height. All
prospective bidders are responsible for verifying existing site conditions and confirming actual square footage prior
to submitting a bid. Field verification is mandatory to ensure accurate pricing and material estimate
2. Scope of Work Overview
The Contractor shall furnish all labor, materials, equipment, and services necessary to complete the full painting and
protective coatings scope described below. All work must comply with manufacturer recommendations, industry
standards, and City specifications.
Work includes, but is not limited to:
A. Surface Preparation
* Pressure wash all surfaces receiving new finishes.
* Mask and protect adjacent areas, structures, utilities, and landscape elements to prevent overspray,
damage, or staining.
B. Concrete Finishes
* Apply two full coats of H&C Color Top Stain for Concrete in two colors, as specified by the city.
C. Handrails
* Spot-prime rusted areas using KEM Bond rust-inhibiting primer.
* Apply two coats of Sherwin-Williams Hi-Solids Polyurethane S/G to all handrails.
D. Galvanized Steel Components
* Spot-prime galvanized gates and steel elements using Macro poxy 626.
* Apply two coats of Hi-Solids Polyurethane S/G to all galvanized steel surfaces.
E. Chain Link Fencing
* Prime as required.
* Apply two coats of finish coating as directed.
5

The warranty shall cover defects in materials and workmanship, including, but not limited to, peeling, blistering,
flaking, cracking, delamination, loss of adhesion, premature coating failure, and corrosion or substrate exposure
resulting from inadequate surface preparation or improper application.
Upon written notification by the Owner of a warranted defect, the Contractor shall, at no additional cost to the
Owner, properly prepare the affected areas and repair or recoat the defective work using materials compatible
with the existing coating system.
The warranty shall not apply to damage caused by vandalism, impact, structural movement, substrate deterioration
not attributable to the Contractor, or other conditions beyond the Contractor's control.
The Contractor shall comply with all coating manufacturer's surface preparation, environmental, application,
curing, and dry-film-thickness requirements. The Contractor shall provide the Owner with the manufacturer's
product data and warranty documentation prior to application.

F. Light & Speaker Racks
* Prime as needed.
* Apply two coats of Hi-Solids Polyurethane S/G.
G. Cleanup
* Remove and legally dispose of all masking materials, debris, and waste generated by the work.
* Restore all impacted areas to pre-construction conditions.
H. Alternate Work (Additive)
* Pressure wash all concrete seating areas not scheduled to receive new finishes
3. Contractor's Compliance Acknowledgement
The Contractor shall comply with Indiana Code 5-16-13, including all requirements governing public works
contractor qualifications. Contractors must execute and submit the Contractor's Acknowledgment form prior to the
start of any work
4. Contract Term and Notice to Proceed
Upon award, the department will provide:
* A notice of award
* A copy of the agreement
The Contractor must:
* Sign and return the agreement,
* Provide all required insurance documentation, and
* Complete all post-award document submissions within ten (10) calendar days of receiving the agreement.
Failure to meet this requirement may result in forfeiture of the bid bond unless the City determines a mutual
resolution is appropriate.
Work must begin within ten (10) days of issuance of the Notice to Proceed.
5. Warranty Requirements
The Contractor shall guarantee all improvements for two (2) years from the date of final acceptance.
The warranty shall cover defects in materials and workmanship, including, but not limited to, peeling, blistering,
flaking, cracking, delamination, loss of adhesion, premature coating failure, and corrosion or substrate exposure
resulting from inadequate surface preparation or improper application.
Upon written notification by the Owner of a warranted defect, the Contractor shall, at no additional cost to the
Owner, properly prepare the affected areas and repair or recoat the defective work using materials compatible
with the existing coating system.
The warranty shall not apply to damage caused by vandalism, impact, structural movement, substrate deterioration
not attributable to the Contractor, or other conditions beyond the Contractor's control.
The Contractor shall comply with all coating manufacturer's surface preparation, environmental, application,
curing, and dry-film-thickness requirements. The Contractor shall provide the Owner with the manufacturer's
product data and warranty documentation prior to application.
If repairs are required, the Contractor must begin remedial work within 10 days of written notice unless additional
time is authorized by the department in writing.
If the Contractor fails to begin repairs, the City may perform or procure corrective work and recover associated
costs, including supervision and inspection expenses.
The Owner retains 90 days after the warranty period to identify and notify the Contractor of any qualifying defects.
6. Product Substitutions ("Or Equal")
6

References to specific manufacturers or brand names are not intended to limit competition. They define the
minimum standard of quality and performance. Contractors may submit proposed equivalents, subject to City
approval.
7. Budget Constraints
If total project costs exceed available funding, the City reserves the right to either award the project in part or reject
all bids.
8. Drug Testing & Licensing Requirements
At the time of bid submission, Contractors must provide:
* A copy of the company's Random Drug Testing Program (per Chapter 3.95 of City Code).
* Applicable Contractor Licenses for all trades participating in the project.
For bids under $10,000, the Contractor must still submit both items.
* If contractor has RBO prequalification for the current fiscal year they may include a copy of their current year
prequalification letter issued by the City of Evansville - Vanderburgh County Purchasing Department in place
of the drug policy and contractor license(s)
9. Required Insurance Coverage
The Contractor must maintain the specified minimum coverage levels, including but not limited to:
* General Aggregate: $2,000,000
* Products & Completed Operations: $2,000,000
* Personal & Advertising Injury: $1,000,000
* Each Occurrence: $750,000
* Fire Damage (any one fire): $50,000
* Medical Expense (any one person): $5,000
Insurance certificates must:
* Name the City of Evansville as an additional insured,
* Be fully executed and submitted before work begins, and
* Comply with additional insurance requirements outlined in Section XI (Scope of Services).
10. Notice to Proceed & Liquidated Damages
If the Contractor fails to meet the required project timeline, the City will assess liquidated damages of $100 per day,
unless the Board agrees that the circumstances leading to the delay were unforeseen and outside of contractors
control.
11. Final Inspection & Invoicing Requirements
Upon completion, the Contractor must schedule a joint inspection with the City and architect.
The City will provide a list of deficiencies, which must be corrected before another inspection is requested.
Final acceptance occurs only after all deficiencies are resolved.
Only after Final Inspection may the Contractor submit an invoice reflecting approved work and any authorized
change orders.
SECTION 3 - CONTRACTOR QUALIFICATIONS & REQUIREMENTS
1. Minimum Qualifications
7

The Contractor and all employees assigned to this project must conduct themselves in a professional manner at all
times. Requirements include:
* Proper attire must be worn at all times; shirts are mandatory.
* Offensive language, inappropriate behavior, or unsuitable clothing will not be tolerated.
* The use of alcohol or illegal drugs is strictly prohibited on the job site.
These behavioral requirements apply throughout the entire duration of the contract.
2. Required Experience Documentation
To demonstrate sufficient experience and capability, each Contractor must provide the following with its bid
submission:
1. Three (3) local reference letters, documenting relevant project experience.
2. A manpower list identifying all personnel expected to work on the project.
3. A description of the company's operational history, specifically the number of years the business has
performed work similar in scope and complexity to this project.
These materials will be used to verify qualifications, assess capacity, and determine overall responsibility.
3. Non-Compliance Procedures
If the Contractor fails to comply with any term or condition of the contract, the City will issue a written notice
identifying the deficiency.
The Contractor will have four (4) days to correct the issue.
If the deficiency is not corrected within this period, the City may take one or more of the following actions:
* Terminate the contract and compensate the Contractor only for work performed up to the date of termination,
minus any amounts owed to the City.
* Use City employees or hire another contractor to complete corrective measures. Costs incurred will be
deducted from payments due to the Contractor.
* Pursue any additional remedies allowed by law or equity.
This section emphasizes the Contractor's obligation to remain compliant and responsive throughout the project.
4. Invoice Submission Requirements
All invoices submitted for payment must meet the following requirements:
* The invoice must clearly identify "Evansville Vanderburgh Levee Authority".
* Invoices must be itemized and include the Contractor's company name, address, and telephone number.
* Each invoice must include a unique invoice number that does not duplicate any previously submitted invoice.
* Failure to follow invoicing requirements may delay payment processing.
5. Insurance Requirements
The Contractor must maintain, for the full duration of the contract, all insurance coverage required under the
specifications, including:
* General liability insurance, providing coverage for personal injury, occupational illness, accidental death, and
property damage arising from Contractor or subcontractor operations.
o Minimum combined single limit: $1,000,000 per occurrence.
* Workers' compensation insurance, as required by Indiana law, covering all employees performing work under the
contract.
* The City of Evansville must be listed as an additional insured on all general liability policies.
Certificates of insurance must be submitted to the City's Board of Public Works or Purchasing Department before work
begins.
6. Responsibility for Damage to City or Private Property
8

If any property-including but not limited to pavement, sidewalks, vehicles, buildings, traffic equipment, or
landscaping-is damaged as a result of the Contractor's operations, the Contractor must:
* Immediately repair the damage at the Contractor's own expense.
* Maintain a clean and safe work area at all times, free of debris and hazards.
If the Contractor fails to make required repairs promptly, the City or Levee Authority may perform the repairs and
recover all associated costs from the Contractor.
18. Taxes
The City of Evansville is exempt from federal, state, and local taxes and will not be responsible for any such taxes in
connection with the award or performance of this contract.
19. Choice of Law and Venue
Any and all actions or proceedings arising out of, or related to, this bid and any resulting contract shall be governed by and
construed in accordance with the laws of the State of Indiana. Submissions in response to this solicitation by Vendor
constitutes consent and stipulation to jurisdiction and venue in the courts of Vanderburgh County, Indiana, concerning all
litigation and proceedings arising out of or related to this solicitation and any resulting contract.
9

SECTION 4 - GENERAL CONDITIONS
1. DEFINITIONS
The Contract Documents consist of the Contract, the Notice to Respondents, the Request for Bids/Solicitation,
the Instructions to Respondents, the General Conditions, the Special Conditions, the Special Provisions, any
Project Drawings, the Standard Drawings and the Specifications. The Standard Specifications of the Indiana
Department of Transportation (INDOT), Current Edition, are referenced in the Contract Documents, and are
incorporated by reference.
The Contract shall consist solely of all written terms of this written agreement, entered into by and between the
Owner and by the Contractor in the performance of the Work and the payment therefore and the Contract
Documents. This Contract and the Contract Documents supersedes any prior agreements, written or oral,
between the Owner and the Contractor.
The following terms are used in these Contract Documents, and are defined as follows:
a) Project The entire improvement proposed by the Owner to be constructed in whole or in part pursuant
to the Contract.
b) Owner The City of Evansville, acting by and through the lawful conduct of the appropriate Board or
Commission.
c) Contractor The person, persons, firms or corporations to whom the Contract is awarded by the
Owner, including all agents, employees, workmen or assignees of said Contractor.
d) Subcontractor A person, firm, or corporation other than the Contractor, who supplies labor, workmen
and materials, or labor only, or work at the site of the Project at the request of the Contractor.
e) Work All work, including materials, labor, supervision, use of tools, etc., necessary to complete the
Project in full compliance with the terms of the Contract, including work performed by the Contractor and
his Subcontractor(s).
f) Engineer The City Engineer of the City of Evansville, his employees, or assignees or a firm contracted to
carry out architectural or engineering duties for a project
g) Surety The person, firm or corporation that has executed, as surety, the Contractor's Performance
Bond, securing the Contractor's performance of the Contract.
h) Affected County Vanderburgh County or an adjacent county.
i) E-Verify Program An electronic verification of work authorization program of the Illegal Immigration
Reform and Immigration Responsibility Act of 1996 (P.L. 104-208), Division C, Title IV, s.403(a), as
amended, operated by the United States Department of Homeland Security or successor work
authorization program designated by the United States Department of Homeland Security or other federal
agency authorized to verify the work authorization status of newly hired employees under the Immigration
Reform and Control Act of 1986 (P.L. 99-603).
j) Local Indiana Business A business whose principal place of business is in an Affected County; a business
that pays a majority of its payroll (in dollar volume) to residents of Affected Counties; or a business that
employees residents of Affected Counties as a majority of its employees.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Event Name: Real Estate Services Bid Documents Agency: Dept of Administration Event ID:

State Government of Indiana

Bid Due: 11/19/2026

Post Date 10/29/2026 Quest Number 10422342 Category Code Street/Road Concrete Reconstruction Bid/Request Name

City of Fort Wayne

Bid Due: 11/12/2026

77441 - 2026 Sewer Rehabilitation #2 (Large Diameter) Quest Number: 10410060 Closing Date:

City of Fort Wayne

Bid Due: 11/19/2026

Project name and number PMC2703758034 - Mississinewa Lake Liftstation 2-Year Preventative Maintenance Contract

State Government of Indiana

Bid Due: 12/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.