| Location: | South Carolina |
|---|---|
| Posted: | Dec 10, 2025 |
| Due: | Jan 2, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project consists of construction of roadway and bridge improvements that will be installed following the current SCDOT standard specifications and details. Proposed construction includes the clearing, grubbing and grading of approximately 23.5 acres, 1.75 linear miles of variable-lane parkway, 146 linear feet of four-lane divided bridge, installation of 36” water main, relocation and abandonment of an existing 36” water main, stormwater infrastructure and incidental construction.

With GovernmentContracts, you can:
...; general grading work (Bayberry Dr.) 06/18/2026 03:00 PM UTC...
County of Spartanburg
Bid Due: 6/18/2026
...Documents. The Contractor's scope of work shall include, but not limited to, demo, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/10/2026
...or used as structural fill (for the stormwater pond, Cell 8 or the ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/18/2026
...along Mayberry Street. The proposed scope of work includes traffic control, grading, curb...
City of Greenville
Bid Due: 6/16/2026