1200 West Extension Phase 5 Addendum #2

Location: Utah
Posted: Apr 17, 2025
Due: Apr 23, 2025
Agency: Nibley City
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Open Bids
1200 West Extension Phase 5

1200 W Phase 5 Bid Documents

1200 West Phase 5 CDs

1200 West Phase 5 Electrical Plan

1200 West Phase 5 Geotech & Pavement Study

1200 West Plan Holder List

1200 W Phase 5 Q&A #1

1200 W Phase 5 Q&A #2

1200 W Phase 5 Addendum #1

1200 W Phase 5 Addendum #2

Attachment Preview

2020-0022
April 2025
Nibley City
1200 West Roadway Extension Phase 5
DOCUMENT 00 10 00
ADVERTISEMENT FOR BIDS
GENERAL NOTICE
Nibley City is requesting Bids for the construction of the following Project:
1200 West Roadway Extension Phase 5-
Bids for the construction of the Project will be received at Nibley City located at 455 West 3200 South,
Nibley, Utah 84321 until Wednesday April 23rd, 2025 at 10:00 a.m. local time. Alternatively, bids may be
mailed to 455 West 3200 South, Nibley, Utah 84321. At that time the Bids received will be publicly opened
and read.
The Work generally consists of Roadway extension along Meadow Lane from 2490 S to 2200 S and striping
from 2980 S to 3200 S.
OBTAINING THE BIDDING DOCUMENTS
Information and Bidding Documents for the Project can be found at the following designated website:
https://nibleycity.gov/public-works/
Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to
register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan
room or source other than the designated website in either electronic or paper format. The designated
website will be updated periodically with addenda, lists of registered plan holders, reports, and other
information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding
Documents will be offered only through the designated website. Neither Owner nor Engineer will be
responsible for Bidding Documents, including addenda, if any, obtained from sources other than the
designated website. Reach out to Tom Dickinson at tomd@nibleycity.gov for access to the plan set
materials.
PRE-BID CONFERENCE
A mandatory pre-bid conference for the Project will be held on Wednesday April 2nd, 2025 at 9:30 a.m. at
Nibley City Offices, 455 West 3200 South, Nibley, Utah 84321. Bids will not be accepted from Bidders that do
not attend the mandatory pre-bid conference.
INSTRUCTIONS TO BIDDERS
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to
the Instructions to Bidders that are included in the Bidding Documents.
THIS ADVERTISEMENT IS ISSUED BY:
Owner: Nibley City
By:
Tom Dickinson
Title: City Engineer
Date: Wednesday, March 26th, 2025
END OF DOCUMENT
EJCDC® C-111, Advertisement for Bids for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
00 10 00 Advertisement for Bid
Page 1 of 1
2020-0022
April 2025
Nibley City
1200 West Roadway Extension Phase 5
DOCUMENT 00 20 00
INSTRUCTIONS TO BIDDERS
Table of Contents
Page
Article 1— Defined Terms ................................................................................................................................................2
Article 2— Bidding Documents ......................................................................................................................................2
Article 3— Qualifications of Bidders...............................................................................................................................3
Article 4— Pre-Bid Conference ......................................................................................................................................3
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program; Other
Work at the Site..............................................................................................................................................................3
Article 6— Bidder’s Representations and Certifications..............................................................................................4
Article 7— Interpretations and Addenda .....................................................................................................................5
Article 8— Bid Security.....................................................................................................................................................5
Article 9— Contract Times ..............................................................................................................................................5
Article 10— Substitute and “Or Equal” Items ................................................................................................................6
Article 11— Subcontractors, Suppliers, and Others......................................................................................................6
Article 12— Preparation of Bid .......................................................................................................................................6
Article 13— Basis of Bid ....................................................................................................................................................7
Article 14— Submittal of Bid............................................................................................................................................8
Article 15— Modification and Withdrawal of Bid .........................................................................................................8
Article 16— Opening of Bids ...........................................................................................................................................8
Article 17— Bids to Remain Subject to Acceptance...................................................................................................8
Article 18— Evaluation of Bids and Award of Contract ..............................................................................................8
Article 19— Bonds and Insurance ..................................................................................................................................9
Article 20— Signing of Agreement.................................................................................................................................9
Article 21— Sales and Use Taxes.....................................................................................Error! Bookmark not defined.
00 20 00 Instruction to Bidders
Page 1 of 10
2020-0022
April 2025
Nibley City
1200 West Roadway Extension Phase 5
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions
and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the
meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which
registers plan holders.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents
(together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is
Bidder’s responsibility to determine that it is using a complete set of documents in the preparation
of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of
incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of
the Project and permission to download or distribution of the Bidding Documents does not confer a
license or grant permission or authorization for any other use. Authorization to download
documents, or other distribution, includes the right for plan holders to print documents solely for
their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder
pays all costs associated with printing or reproduction. Printed documents may not be re-sold
under any circumstances.
2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or
invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at
such website, and obtain a complete set of the Bidding Documents from such website. Bidders
may rely that sets of Bidding Documents obtained from the Bidding Documents Website are
complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by
Owner.
2.04 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding
Documents are available, such documents will be made available to the Bidders as Electronic
Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf)
that is readable by Adobe Acrobat Reader. It is the intent of the Engineer and Owner
that such Electronic Documents are to be exactly representative of the paper copies of
the documents. However, because the Owner and Engineer cannot totally control the
transmission and receipt of Electronic Documents nor the Contractor’s means of
reproduction of such documents, the Owner and Engineer cannot and do not
guarantee that Electronic Documents and reproductions prepared from those versions
are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon
complete sets of Electronic Documents of the Bidding Documents, described in
Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising
from transmission/receipt of Electronic Documents versions of Bidding Documents and
reproductions prepared from those versions and, further, assumes all risks, costs, and
responsibility associated with use of the Electronic Documents versions to derive information
that is not explicitly contained in printed paper versions of the documents, and for Bidder’s
reliance upon such derived information.
00 20 00 Instruction to Bidders
Page 2 of 10
2020-0022
April 2025
Nibley City
1200 West Roadway Extension Phase 5
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 Bidder is to submit the Bidder Qualification Statement with its Bid to demonstrate Bidder’s
qualifications to perform the Work:
3.02 A Bidder’s failure to submit required qualification information within the times indicated may
disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek
additional pertinent information regarding Bidder’s qualifications.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A mandatory pre-Bid conference will be held at the time and location indicated in the
Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss
the Project. Proposals will not be accepted from Bidders who do not attend the conference. It is
each Bidder’s responsibility to sign in at the pre-bid conference to verify its participation. Bidders
must sign in using the name of the organization that will be submitting a Bid. A list of qualified
Bidders that attended the pre-bid conference and are eligible to submit a Bid for this Project will be
issued in an Addendum.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner
will issue Addenda to make any changes to the Contract Documents that result from discussions at
the pre-Bid conference. Information presented, and statements made at the pre-bid conference
will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S SAFETY
PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way,
easements, and other lands furnished by Owner for the use of the Contractor. Any additional
lands required for temporary construction facilities, construction equipment, or storage of
materials and equipment, and any access needed for such additional lands, are to be
obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or
adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to
the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the
Site, including those drawings depicting existing surface or subsurface structures at
or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental
Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any
Bidder on request. These reports and drawings are not part of the Contract Documents,
but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely,
as provided in the General Conditions, has been identified and established in the
Supplementary Conditions. Bidder is responsible for any interpretation or conclusion
00 20 00 Instruction to Bidders
Page 3 of 10
2020-0022
April 2025
Nibley City
1200 West Roadway Extension Phase 5
Bidder draws from any Technical Data or any other data, interpretations, opinions, or
information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of
Technical Data set forth in Article 1 of the General Conditions will apply.
4. Geotechnical Baseline Report/Geotechnical Data Report: The Bidding Documents
contain a Geotechnical Baseline Report (GBR) and Geotechnical Data Report (GDR).
a. As set forth in the Supplementary Conditions, the GBR describes certain select
subsurface conditions that are anticipated to be encountered by Contractor during
construction in specified locations (“Baseline Conditions”). The GBR is a Contract
Document.
b. The Baseline Conditions in the GBR are intended to reduce uncertainty and the
degree of contingency in submitted Bids. However, Bidders cannot rely solely on the
Baseline Conditions. Bids should be based on a comprehensive approach that
includes an independent review and analysis of the GBR, all other Contract
Documents, Technical Data, other available information, and observable surface
conditions. Not all potential subsurface conditions are baselined.
c. Nothing in the GBR is intended to relieve Bidders of the responsibility to make their
own determinations regarding construction costs, bidding strategies, and Bid prices,
nor of the responsibility to select and be responsible for the means, methods,
techniques, sequences, and procedures of construction, and for safety precautions
and programs incident thereto.
d. As set forth in the Supplementary Conditions, the GDR is a Contract Document
containing data prepared by or for the Owner in support of the GBR.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings,
pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in
Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the
presence or location of Underground Facilities are not intended to be categorized, identified,
or defined as Technical Data.
5.03 Other Site-related Documents
A. No other Site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. Bidders visiting the Site are required to arrange their own transportation to the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site
conditions.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner
safety program exists, it will be noted in the Supplementary Conditions.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the
general nature of other work of which Owner is aware (if any) that is to be performed at the
Site by Owner or others (such as utilities and other prime contractors) and relates to the Work
contemplated by these Bidding Documents. If Owner is party to a written contract for such
other work, then on request, Owner will provide to each Bidder access to examine such
contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
00 20 00 Instruction to Bidders
Page 4 of 10
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Project: Summit County Service Area 3 Snow Removal RFP 25/26 Ref. #: Snow

State Government of Utah

Bid Due: 5/21/2025

Project: Daggett County-Comprehensive Emergency Operations Plan Ref. #: RA25-77 Department: Division of Purchasing

State Government of Utah

Bid Due: 7/13/2025

Project: Ambulance BID Ref. #: 2025-003 Department: CITIES - Springville City Type: RFB

City of West Valley City

Bid Due: 6/02/2025

Project: Design Professional Services Ref. #: DPS2025 Department: SPECIAL SERVICE DISTRICTS - Metropolitan

City of West Valley City

Bid Due: 3/26/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.