| Location: | Georgia |
|---|---|
| Posted: | Mar 6, 2026 |
| Due: | Mar 23, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FD2060-25-00168_E3RCU |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The purpose of this solicitation is to obtain a 1- year contract vehicle for repair of the E-3 Recording Control Unit to support user requirements. The E-3 Recording Control Unit (E-3 RCU) or Control Panel consists of a Digital Flight Data Recorder (DFDR), a Cockpit Voice Recorder (CVR), and a Crash Position Locator (CPL) control unit. The E-3 RCU is used to operate and test the DFDR, CVR, and CPL. The DFDR records aircraft operating parameters such as altitude, attitude, power lever angle and significant events such as CPL activation. The CVR is utilized to record flight crew communication. The CPL generates and transmits distress signals in the event of a crash. This repair is intended to provide the assets necessary to support the current Mission Requirement of the E-3 AWACS aircraft.
There shall be no more than 2 PQDRs on this Contract.
Delivery of repair
The Turnaround Time (TAT) is 60 calendar days for repair. There shall be no more than three late deliveries for this contract. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by a revised delivery date acceptable to the Government.
CAV-AF reporting
The Contractor shall report production in CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur.
For further requirement descriptions please reference attached PWS.
This is an amendment is to add the requirements for CMMC, NIST SP 800-171: Reference DFARS 4.
| Feb 19, 2025 | [Combined Synopsis/Solicitation (Original)] Repair of E-3 RCU Repair |
| May 7, 2025 | [Combined Synopsis/Solicitation (Updated)] Repair of E-3 RCU Repair |

With GovernmentContracts, you can:
...of City-Issued Equipment and Asset Accountability Category: Request for Proposal -Professional Services... and ...
McDonough city
Bid Due: 6/12/2026
...experienced in the development of asset management plans for municipal water systems. Responding ...
State Government of Georgia
Bid Due: 6/16/2026
...inventory and reconciliation of approximately 6,500-7,000 City-owned fleet assets to address... discrepancies between ...
State Government of Georgia
Bid Due: 6/19/2026
...of Department of Enterprise Asset Management (DEAM), will shortly undergo a Multi-Step Sealed ...
State Government of Georgia
Bid Due: 6/26/2026