| Location: | Pennsylvania |
|---|---|
| Posted: | Dec 2, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | South Middleton Township Municipal Authority, Cumberland County |
| Publication URL: | To access bid details, please log in. |
Project Description: The work includes all material, labor, and equipment necessary for the replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment. The project is located in South Middleton Township, Cumberland County.

With GovernmentContracts, you can:
...Invitation To Bid #26-016 ELECTRICAL FEEDER REPLACEMENT PROJECT We're sorry, this Invitation To..., ...
County of Lehigh
Bid Due: 6/24/2026
..., and will publicly open said bids after 10:00 A.M. Local Time, June ...
Lehigh County
Bid Due: 6/25/2026
...associated angles. The removal, disposal, and replacement of the interior electrical panels including... ...
DEPT OF DEFENSE
Bid Due: 6/30/2026
...Project: HVAC Replacement at the Public Safety Training Facility; Spec #24-06/26 Ref. #: ...
PennBid
Bid Due: 6/22/2026