| Location: | Minnesota |
|---|---|
| Posted: | May 27, 2025 |
| Due: | Jun 18, 2025 |
| Agency: | Metropolitan Airports Commission (MAC) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Solicitation062 |
| Publication URL: | To access bid details, please log in. |
Project Description: Provide equipment replacements and additions to provide energy savings at Terminal 1.
Work includes concrete construction, gypsum board walls, masonry wall penetrations, doors and painting. Mechanical work includes installation of hydronic piping, ductwork, air handling units/fan coils, hydronic pumps, a heat pump unit, and associated controls. Electrical work includes updating lighting from HID to LED in a tug drive area, replacing hallway lighting and occupancy sensors, and replacing ready room lighting. Electrical work to support the mechanical scope.

With GovernmentContracts, you can:
...storefront windows, masonry repairs, and installation new snow guards, gutters, and downspouts on ...
Metropolitan Airports Commission (MAC)
Bid Due: 6/16/2026