Project Description: The Airport Expansion Phase 2 work generally includes, but is not limited to, the
following: Installation of approximately 1,300 feet of 18 inch SDR-35 PVC Pipe,
modification of the existing pump station and associated manholes.
The Boat Harbor Drive Sewer Line Project work generally includes, but is not limited
to, the following: Installation of approximately 1,300 feet of 21 inch SDR-35 PVC Pipe,
35 feet of 12 inch SDR-35 PVC Pipe and associated manholes.
550 South Sewer Replacement Project work generally includes, but is not limited to, the
following: Installation of approximately 1,600 feet of 12 inch SDR-35 PVC Pipe, and
associated manholes.
All projects will be awarded to one qualification-based contractor.

With GovernmentContracts, you can:
...: SUBMISSIONS WILL ONLY BE ACCEPTED IN PERSON The Project consists of installation ...
State Government of Utah
Bid Due: 6/25/2026