CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
49 BUSINESS PARK SEWER PUMP STATION
REPLACEMENT
AND
NORTH FIRST STREET SEWER SERVICE LINE
REPLACEMENTS AND DRAINAGE IMPROVEMENTS
TOWN OF FLORA, MISSISSIPPI
prepared for
MAYOR AND BOARD OF ALDERMEN
TOWN OF FLORA
168 CARTER STREET
FLORA, MISSISSIPPI 39071
DECEMBER 2024
prepared by
WILLIFORD ENGINEERING INC.
188 Sundial Road
Madison, Mississippi 39110
WEI Project Nos. 18-005.11 and 13
ADVERTISEMENT FOR BIDS
Section A
LEGAL AD
ADVERTISEMENT FOR BIDS
NOTICE is hereby given that Town of Flora, Mississippi, will receive written sealed bids until the
hour of 2:00 PM, local time on, Friday, February 7, 2025 at the Board Room of the Flora Town Hall
located at 168 Carter Street, Flora, MS 39071 (601-879-8686) for the furnishing of all labor and materials,
and for performing all activities specified in the Contract Documents, for the construction of the US 49
Business Park Sewer Pump Station Replacement and North First Street Sewer Service Line
Replacements and Drainage Improvements project.
The project includes extensions and improvements to the existing municipal sewer system
located along Highway 49 North in the northwestern section of the Town of Flora, Mississippi and
along North First Street in the north-central section of the Town of Flora. The Contract Time will be
One Hundred Eighty (180) consecutive calendar days, and the liquidated damages will be $250 per
consecutive calendar day thereafter.
Plans, contract documents and proposal forms are on file for public inspection in the office of the
Town Clerk, Town of Flora, 168 Carter Street, Flora, MS 39071 (601-879-8686). One complete hard-
copy set of the contract documents, specifications and plans may be procured by mail, or may be obtained
digitally by email from Williford Engineering Inc., 188 Sundial Road, Madison, MS 39110 (601-955-
6504), upon payment of $100, none of which is refundable.
All bids will be publicly opened and read aloud at the time set forth above at the Board Room in the
Town Hall of the Town of Flora, 168 Carter Street, Flora, MS 39071. Bids will be considered by the Mayor
and Board of Aldermen of the Town of Flora at the next regular meeting thereof to be held within sixty
(60) days of the date of receipt of bids.
Any contract awarded under this advertisement for bids is expected to be financed in part or in whole
by funds available to the Town of Flora, MS from one or more sources. Neither the U.S. Government, the
State of Mississippi, nor any of their departments, agencies or employees is or will be a party to this
advertisement for bids or any resulting construction contract. This procurement will be subject to the MS State
Purchasing Laws.
The Town of Flora reserves the right to waive any and all informalities in the bidding and to reject
any and all bids.
As approved by the Mayor and Board of Alderman of the Town of Flora, this the 10th day of
December, 2024.
Notes: Forward to the Clarion Ledger and the Madison County Journal on January 2, 2025
Forward to the Mississippi Contract Procurement Center on January 9, 2025
Publish as a legal ad in the Clarion Ledger and the Madison County Journal on January 9 and
16, 2025
Furnish the bill for advertisement and a proof of publication to the Anna Carole Evans, Town
Clerk, Town of Flora, P.O. Box 218, Flora, MS 39071
49 Bus Pk PS and N First St Sewer Imp.
Town of Flora, Mississippi
December 2024
Advertisement for Bids
Section A Page 1 of 1
Williford Engineering Inc.
Madison, Mississippi
WEI #18-005.11 and 13
INFORMATION FOR BIDDERS
Section B
I.
Receipt and Opening of Bids: See copy of Advertisement for Bids bound herewith.
II.
Proposals:
A.
Shall be made on the forms provided and all applicable blank spaces filled in. Any
interlineations, alteration, erasure or change of any kind must be initialed by the BIDDER and
shall not contain any recapitulation of the work to be done. No oral, telephonic or telegraphic
proposals will be considered.
B.
Any bid may be withdrawn prior to the above scheduled time for the opening of bids or
authorized postponement thereof. Any bid received after the time and date specified shall not
be considered.
C.
Submit bids (in duplicate) in an opaque sealed envelope marked as follows:
1.
Bid for construction of US 49 Business Park Sewer Pump Station Replacement
and North First Street Sewer Service Line Replacements and Drainage
Improvements, Town of Flora, Mississippi.
2.
Certificate of Responsibility No.
, if applicable.
If total bid is less than $50,000, the envelope should be marked “Bid less than
$50,000, no COR required.”
D.
Any addenda issued during the bidding shall be noted on the Proposal Form and they will
become a part of the executed contract.
III. Method of Bidding:
A.
The bid will consist of a base bid amount in accordance with the totals bid per various items
and schedules of the project proposal form with various additives and deductives for variances
in the proposed project.
B.
The TOWN OF FLORA, MISSISSIPPI reserves the right to reject any or all bids.
IV. Addenda and Interpretations:
A.
Should a bidder find discrepancies in, or omissions from, the drawings or specifications or
should be in doubt as to their written meaning, Bidder should at once notify the ENGINEER,
who will send a written instruction or interpretation to all known holders of the documents. The
ENGINEER will not be responsible for any oral instructions.
B.
Any addenda to specifications or plans that may be issued before or during the time of bidding
shall be included in the proposal and will become a part of the Contract.
V.
Certificate of Responsibility Number:
A.
Each CONTRACTOR submitting a bid must show on the bid and on the face of the envelope
containing the bid, their Contractor’s Mississippi State Certificate of Responsibility Number, if
the bid is more than $50,000. If the bid is less than $50,000, no Certificate of Responsibility is
required.
B.
No bids will be accepted, opened or considered unless the above information is given
as specified. Sufficient evidence that said certificate of responsibility number has been issued
49 Bus Pk PS and N First St Sewer Imp.
Town of Flora, Mississippi
December 2024
Information for Bidder’s
Section B Page 1 of 4
Williford Engineering Inc.
Madison, Mississippi
WEI #18-005.11 and 13
INFORMATION FOR BIDDERS
Section B
and is in effect at the time of receiving bids must be submitted when required by OWNER or
ENGINEER, if applicable.
VI. Bid Security: Each bid must be accompanied by a certified check of the bidder, or a Bid Bond
prepared on the form of a bid bond as included herein, duly executed by the bidder as principal and
having as surety thereon a surety company licensed by the State of Mississippi and signed by an agent
resident in Mississippi, in the amount of five percent (5%) of the base bid. If the bid is less than
$50,000, this requirement shall be waived.
VII. Liquidated Damages for Failure to Enter into Contract: The successful bidder, upon the Bidder’s
failure or refusal to execute and deliver the contract and bonds required within ten (10) days after
receiving the contract for execution, shall forfeit to the OWNER, as liquidated damages, the bid security
deposited with the bid.
VIII. Security for Faithful Performance: Simultaneously with the delivery of the executed Contract, the
CONTRACTOR shall furnish Contract Performance and Payment Bonds in the full amount of the
Contract for the payment of all persons performing labor on this Contract and for furnishing all materials
in connection with this Contract. The surety on such Bond or Bonds shall be a duly authorized Surety
Company doing business in the State of Mississippi. If the bid is less than $50,000, this requirement
shall be waived.
IX. Law and Regulations: The bidder's attention is directed to the fact that all applicable State laws,
municipal ordinances, and the rules and regulations of all authorities having jurisdiction over
construction of the project shall apply to the Contract throughout, and they will be deemed to be
included in the contract the same as though herein written out in full.
X.
Condition of Work: Each bidder shall visit the site and is responsible for being fully informed of the
conditions at the site relating to the completion of the project. Failure to do so will not relieve a
successful bidder of the obligation to furnish all material and labor necessary to carry out the provisions
of the contract.
XI. Obligation of Bidder: At the time of the opening of bids, each bidder will be presumed to have
inspected the site and to have read and to be thoroughly familiar with the Plans and Contract
Documents (including addenda).
XII. Time of Completion: Bidder must agree to commence work on or before the date specified in a written
"Notice to Proceed" from the OWNER and to fully complete the project within the number of
consecutive calendar days as set forth in these Contract Documents.
XIII. Proposal Guarantees: Proposal guarantees will be returned to the unsuccessful bidders, as soon as
a Contract has been awarded, and returned to the successful bidder after he has executed the Contract
and has furnished Contract Performance and Payment Bonds and Certificates of Insurance as
required.
XIV. Non-Collusion Affidavit: CONTRACTOR must complete the non-collusion affidavits included in the
Contract Documents and submit same as part of the bid. FAILURE TO DO SO WILL DISQUALIFY
THE BID.
XV. Interpretations: No oral interpretation made to any Bidder as to the meaning of the Plans and
Specifications or Contract Documents shall be considered an effective modification of any of the
provisions of the Contract Documents. Written and oral requests for interpretation of the Plans and
Specifications shall be submitted to the ENGINEER for a formal decision which will be given in writing
to all Plan and Specification holders.
49 Bus Pk PS and N First St Sewer Imp.
Town of Flora, Mississippi
December 2024
Information for Bidder’s
Section B Page 2 of 4
Williford Engineering Inc.
Madison, Mississippi
WEI #18-005.11 and 13
INFORMATION FOR BIDDERS
Section B
XVI. Subcontractor: The Bidder is specifically advised that any person, firm or other party to whom it
proposes to award a subcontract must be acceptable to the OWNER. The total allowable subcontract
amount shall not exceed fifty percent (50%) of contract amount.
A.
Qualifications of Subcontractors: Material and Equipment Suppliers:
Within ten (10) working days after award of contract, the CONTRACTOR will submit to the
OWNER and the ENGINEER for acceptance, a list of the names of Subcontractors and such
other persons and organization (including those who are to furnish principal items of materials
or equipment) proposed for those portions of the work as to which the identity of the
Subcontractors and other persons and organizations must be submitted as specified in the
Contract Documents. Within thirty (30) working days after receiving the list, the ENGINEER
will notify the CONTRACTOR in writing if either the OWNER or the ENGINEER, after due
investigation, has reasonable objection to any Subcontractor, person or organization on such
list. The failure of the OWNER or the ENGINEER to make objection to any Subcontractor,
person or organization on the list within thirty (30) working days of receipt shall constitute an
acceptance of such Subcontractor, person or organization but shall not constitute a waiver of
any right of the OWNER or the ENGINEER to reject any WORK, MATERIAL or EQUIPMENT
that is not in conformance with the requirements of the Contract Documents.
B.
The CONTRACTOR will not employ any Subcontractor, other person or organization, whether
initially or as a substitute, against whom the OWNER or the ENGINEER may have reasonable
objection, nor will the CONTRACTOR be required to employ any Subcontractor who has been
accepted by the OWNER and the ENGINEER, unless the ENGINEER determines that there
is good cause for doing so.
C.
The CONTRACTOR shall be fully responsible for all acts and omissions of his Subcontractors
and of persons and organizations directly or indirectly employed by the CONTRACTOR and
of persons and organizations for whose acts any of them may be liable to the same extent
that the Contractor is responsible for the acts and omissions of persons directly employed by
the Contractor. Nothing in the Contract Documents shall create any obligation on the part of
the OWNER or ENGINEER to pay or to see to the payment of any monies due any
Subcontractor or other person or organization, except as may otherwise be required by law.
OWNER or ENGINEER may furnish to any Subcontractor or other person or organization, to
the extent practicable, evidence amounts paid to the CONTRACTOR on account of specific
Work done in accordance with the schedule of values.
D.
The divisions and sections of the Specifications and the identifications of any Drawings shall
not control the CONTRACTOR in dividing the Work among Subcontractors or delineating the
Work to be performed by any specific trade.
E.
The CONTRACTOR agrees to bind specifically every Subcontractor to the applicable terms
and conditions of the Contract Documents for the benefit of the OWNER.
F.
All Work performed for the CONTRACTOR by a Subcontractor shall be pursuant to an
appropriate agreement between the CONTRACTOR and the Subcontractor.
G.
The CONTRACTOR shall be responsible for the coordination of the trades, subcontractors
and materialmen engaged in the Work.
1.
The CONTRACTOR shall cause appropriate provisions to be inserted in all
subcontracts relative to the Work to bind Subcontractors to the CONTRACTOR by
49 Bus Pk PS and N First St Sewer Imp.
Town of Flora, Mississippi
December 2024
Information for Bidder’s
Section B Page 3 of 4
Williford Engineering Inc.
Madison, Mississippi
WEI #18-005.11 and 13
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.