DAS CC Hoover Print Shop Expansion

Location: Iowa
Posted: Apr 30, 2026
Due: May 19, 2026
Agency: State Government of Iowa
Type of Government: State & Local
Category:
  • 66 - Instruments and Laboratory Equipment
Solicitation No: RFB947300-01
Publication URL: To access bid details, please log in.
Bid Information
Bid Number

RFB947300-01

Solicitation

DAS CC Hoover Print Shop Expansion

Solicitation Type

Request for Bids

County
Description
Description

The Iowa Department of Administrative Services will be receiving bids for DAS CC Hoover Print Shop Expansion, 1305 E Walnut St, Des Moines, IA 50319

**Full Size Project Manual Available for Download in IMAPCS**
Agency Information
Number

005

Name

Administrative Services, Dept

Address 1

1305 E. Walnut St.

Address 2

City/State/Zip

Des Moines, IA 50319
Contact Information
Contact Name

Construction Procurement

Contact Title

Michael Bradbury


Contact Phone Number

(515) 823-9327

Contact Phone Extension

Contact Other Number

Contact Fax Number
Valid Dates
From

4/30/2026 4:25:00 PM

Until

5/19/2026 2:00:00 PM
Documents/Attachments

4/28/2026 3:28:03 PM

4/28/2026 3:27:45 PM

Attachment Preview

GROUP
100% CD SET
State of Iowa
DAS Hoover Print Shop Expansion
DAS Project #9473.00 RFB 947300-01
Hoover Building
1305 East Walnut Street
Des Moines, IA 50319
ARCHITECT / CONSULTANT LIST:
FARNSWORTH GROUP - ARCHITECT
14225 UNIVERSITY AVENUE, SUITE 110, WAUKEE, IOWA 50263
PHONE: 515.225.3469
KCL ENGINEERING
300 4TH STREET, WEST DES MOINES, IOWA 50265
PHONE: 515.724.7938
LOCATION MAP
1305 East Walnut Street
DRAWING LIST
GENERAL
*CO
G1.0
Ph0.1
Ph0.2
Ph0.3
COVER
GENERAL INFORMATION & LIFE SAFETY PLAN
PHASE 1
PHASE 2
PHASE 3
ARCHITECTURAL
AD1.1 DEMOLITION PLANS
A1.1 FLOOR PLAN & REFLECTED CEILING PLAN
A7.1 DOOR & ROOM FINISH SCHEDULE, DOOR ELEVATIONS AND DETAILS, AND PARTITION TYPES
A8.1 EQUIPMENT PLAN
Fire Protection (F)
F1.1 FIRST FLOOR PLAN - FIRE PROTECTION
Plumbing (P)
PD1.1 FIRST FLOOR PLAN DEMOLITION - PLUMBING
P1.1 FIRST FLOOR PLAN - PLUMBING
P3.1 PLUMBING DETAILS AND SCHEDULES
Mechanical (M)
M0.0 MECHANICAL GENERAL NOTES & SYMBOLS
MD1.1 FIRST FLOOR PLAN DEMOLITION - HVAC
M1.1 FIRST FLOOR PLAN - HVAC
M3.1 MECHANICAL DETAILS AND SCHEDULES
Electrical (E)
E0.0 ELECTRICAL GENERAL NOTES & SYMBOLS
E0.1 TECHNOLOGY GENERAL NOTES & SYMBOLS
ED1.1 ELECTRICAL DEMOLITION - LIGHTING
ED1.2 ELECTRICAL DEMOLITION - POWER & SYSTEMS
E1.1 ELECTRICAL POWER
E2.1 ELECTRICAL LIGHTING
E3.1 ELECTRICAL TECHNOLOGY
E4.1 ELECTRICAL ONE-LINE DIAGRAM & DETAILS
E4.2 ELECTRICAL SCHEDULES
E4.3 ELECTRICAL SCHEDULES
EFA5.10.1 PFIHRAESDEE1TECTION & ALARM PLANS
E5.1 PHASE 2
FA1.1 FIRE DETECTION & ALARM PLANS
IMAGE © < COPYRIGHT NOTICE >
PROFESSIONAL REGISTRATIONS
PROFESSIONAL
CHAD D.
BASS
21397
IOWA
THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED BELOW
WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION. I AM A DULY LICENSED ARCHITECT UNDER THE
LAWS OF THE STATE OF IOWA.
SIGNATURE:
NAME: SARAH HUSTON
DATE: 04/17/2026
LICENSE RENEWAL DATE: 06/30/2026
PAGES OR DIVISIONS COVERED:
G AND A SERIES
THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED BELOW
WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION. I AM A DULY LICENSED ENGINEER UNDER THE
LAWS OF THE STATE OF IOWA.
SIGNATURE:
NAME: CHAD BASS
DATE: 04/17/2026
LICENSE RENEWAL DATE:
12/31/2027
PAGES OR DIVISIONS COVERED:
F, P, AND M SERIES
PROFESSIONAL
ERIC
HEYNEN
P24706
IOWA
THE PORTION OF THIS TECHNICAL SUBMISSION DESCRIBED BELOW
WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION. I AM A DULY LICENSED ENGINEER UNDER THE
LAWS OF THE STATE OF IOWA.
SIGNATURE:
NAME: ERIC HEYNEN
DATE: 04/17/2026
LICENSE RENEWAL DATE: 12/31/2027
PAGES OR DIVISIONS COVERED:
_E__S_E_RIES and FA SHEET
SYMBOLS LEGEND
NOTE: NOT ALL SYMBOLS ARE USED IN CONSTRUCTION DOCUMENTS
1
A8.1
DETAIL #
WALL SECTION
1
A8.1
ENLARGED CALLOUT
SHEET #
XX.X COLUMN GRID
1
A8.1
DETAIL #
BUILDING SECTION
PAGE #
XX.X
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
1
A8.1
ALIGN
ALIGN
1
A8.1
DETAIL #
DETAIL SECTION
SHEET #
1
A8.1
DETAIL #
INTERIOR ELEVATION
SHEET #
BREAK LINE
ELEVATION
0'-0"
ELEVATION
1
REVISION NOTE
ROOM
NAME
101
ROOM DESIGNATION
ARCHITECTURE
B#
CASEWORK TYPE
0"
-6"
CHANGE IN LEVEL
MATL
1'-0"
CEILING/ SOFFIT
HEIGHT
AL1
GLAZING TYPE
#.#
KEYNOTE
D#.#
12
6
DEMOLITION KEYNOTE
ROOF PITCH
1
A8.1
DOOR NUMBER
DETAIL #
EXTERIOR ELEVATION
SHEET #
SLOPE: 1/4" SLOPE/ROOF SLOPE
T#
TOILET ACCESSORY
#
WALL TYPE
XXX-#
XXX-#
FINISH MATERIAL
TRANSITION
PROJECT NO.:02500979.001
14225 University Avenue, Suite 110 - Waukee, Iowa 50263 - Phone: (515) 225-3469 / info@f-w.com
DATE: 04/17/2026
ABBREVIATIONS
GENERAL
ACT
ADJ
ADT'L
AFF
ALT
APPROX
B/O
BD
BLDG
BLKG
BOT
BRG
C/C
CEM
CFCI
CFOI
CL
CJ
CLG
CLR
COL
CONC
CONST
CONT
CTR
DBL
DEMO
DET/DTL
DIA
DIM
DN
DWG(S)
E
EA
EC
EHO
EL
ELEC
ELEV
EMER
EQ
EQUIP
EW
EX/EXIST
EXP
EXT
FD
FDN
FE
FEC
FFE
FIN
FLR
FRMG
FT
FV
GA
GALV
GC
GEN
GYP
HDWR
HM
HOL
HOR
HT
HVAC
ID
ACOUSTIC(AL) TILE
ADJUSTABLE
ADDITIONAL
ABOVE FINISHED FLOOR
ALTERNATE
APPROXIMATE(LY)
BOTTOM OF
BOARD
BUILDING
BLOCKING
BOTTOM
BEARING
CENTERLINE
CENTER TO CENTER
CEMENT(ITIOUS)
CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CONTRACTOR FURNISHED,
INSTALLED BY OTHERS
CONTROL JOINT
CEILING
CLEAR
COLUMN
CONCRETE
CONSTRUCTION
CONTINUOUS
CENTER(ED)
DOUBLE
DEMOLITION
DETAIL
DIAMETER
DIMENSION
DOWN
DRAWING(S)
EAST
EACH
ELECTRICAL CONTRACTOR
ELECTRICAL HOLD OPEN
ELEVATION
ELECTRIC(AL)
ELEVATOR
EMERGENCY
EQUAL
EQUIPMENT
EACH WAY
EXISTING
EXPOSED
EXTERIOR
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FLOOR ELEVATION
FINISH
FLOOR
FRAMING
FOOT/FEET
FIELD VERIFY
GAUGE
GALVANIZED
GENERAL CONTRACTOR
GENERAL
GYPSUM
HARDWARE
HOLLOW METAL
HOLLOW
HORIZONTAL
HEIGHT
HEATING/VENTILATION/AIR
CONDITIONING
INSIDE DIAMETER
IN
INCL
INSUL
INT
JT
LAM
LF
LT
MAS
MAT'L
MAX
MECH
MFR
MIN
MISC
MTD
MTL
N
NA
NIC
NOM
NTS
OC
OD
OFCI
OFCR
OFOI
OPNG
OPP
OVHD
PERIM
PFIN
PLBG
PLYWD
PNT
PTD
PWR
RB
REC
REINF
REQ'D
REV
RD
RM
RO
S
SF
SIM
SPEC
SQ
SS
STOR
STRUCT
SUSP
SY
T/O
TYP
UNFIN
UNO
VERT
VIF
W/
W/O
W
WC
WD
WH
WT
INCH
INCLUDING
INSULATION
INTERIOR
JOINT
PLASTIC LAMINATE
LINEAR FEET (FOOT)
LIGHT
MASONRY
MATERIAL
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
MISCELLANEOUS
MOUNTED
METAL
NORTH
NOT APPLICABLE
NOT IN CONTRACT
NOMINAL
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OWNER FURNISHED,
CONTRACTOR INSTALLED
OWNER FURNISHED,
CONTRACTOR ROUGH-IN
OWNER FURNISHED,
INSTALLED BY OTHERS
OPENING
OPPOSITE
OVERHEAD
PERIMETER
PREFINISHED
PLUMBING
PLYWOOD
PAINT
PAINTED
POWER
RUBBER BASE
RECESSED
REINFORCED
REQUIRED
REVISED (REVISION)
ROOF DRAIN
ROOM
ROUGH OPENING
SOUTH
SQUARE FEET (FOOT)
SIMILAR
SPECIFICATIONS
SQUARE
STAINLESS STEEL
STORAGE
STRUCTURAL
SUSPENDED
SQUARE YARD(S)
TOP OF
TYPICAL
UNFINISHED
UNLESS NOTED OTHERWISE
VERTICAL
VERIFY IN FIELD
WITH
WITHOUT
WEST
WATER CLOSET
WOOD
WATER HEATER
WEIGHT
INTERIOR
AB
ACB
ACC
ACT
AF
AP
ART
BBT
BR
CC
CCT
CG
CJ
CKB
CON
CPT
CR
CS
CUR
DG
EG
EM
F
FRP
G
GR
HBL
HR
LIN
LS
LVT
MB
MP
NS
P
PL
QTZ
ALUMINUM WALL BASE
ACOUSTICAL CEILING BAFFLE
ACOUSTICAL CEILING CLOUD
ACOUSTICAL CEILING TILE
ARCHITECTURAL FILM
ACOUSTIC PANEL
ARTWORK
BIOBASED RESILIENT TILE
BRICK / VENEER BRICK
CUBICLE CURTAIN
CUBICLE CURTAIN TRACK
CORNER GUARD
CONTROL JOINT
CORKBOARD
CONCRETE FLOORING / FINISH
CARPET
CRASH RAIL
CULTURED STONE
DECORATIVE CURTAIN / ROD
DOOR FRAME GUARD
END WALL GUARD
ENTRY MAT SYSTEM
FABRIC
FIBERGLASS REINFORCED
PANEL(S)
GLASS / GLAZING
GROUT
HORIZONTAL BLINDS
HAND RAIL
LINOLEUM SHEET / TILE
LOUVER SYSTEM
LUXURY VINYL TILE
MOLDED WALL BASE
METAL PANEL
NATURAL STONE
PAINT
PLASTIC LAMINATE
QUARTZ
RB
RF
RP
RS
RUB
RUG
S
SC
SCR
SD
SHT
SS
SST
SSV
ST
SV
SVT
T
TP
TR
TS
TZ
VAL
VBL
VCT
VET
WC
WCT
WD
WF
WP
WR
RESILIENT WALL BASE
RESINOUS POURED FLOORING
RESIN / ACRYLIC PANEL
ROLLER SHADE
RUBBER SHEET / TILE
RUG CARPETING
SIGNAGE
SHOWER CURTAIN
SHOWER CURTAIN ROD
STATIC DISSIPATIVE FLOORING
SHUTTER
SOLID SURFACE
STAINLESS STEEL
SPECIALTY SHEET VINYL
STAIN
SHEET VINYL
SPECIALTY VINYL TILE
TILE FLOORING/ WALL / WALL
BASE (CERAMIC, PORCELAIN,
GLASS)
TOILET PARTITION
TRIM / CROWN / BASE MOLDING
TRANSITION STRIP
TERRAZZO FLOORING
VALANCE
VERTICAL BLINDS
VINYL COMPOSITION TILE
VINYL ENHANCED TILE
WALL COVERING
WOOD CEILING TILE / PLANK
WOOD (VENEER, PANELING,
WAINSCOT, FLOORING)
WINDOW FILM
WALL PROTECTION
WHITEROCK
STANDARD MOUNTING HEIGHTS
CORNER GUARD
3" TO CORNERGUARD
OR DOOR FRAME
FIBER
REINFORCED
PANELS
WALL PROTECTION
4'-0" TO TOP OF
CABINET - IF FIRE
EXTINGUISHER
OVER 40 LBS
3'-6" HT.
FIRE EXTINGUISHER
CABINET
OCCUPANT LOAD TABLE
NUMBER
NAME
OCCUPANCY
TYPE
AREA
LEVEL A FLOOR
HA62
HALLWAY
164 SF
HA64
GRAPHIC DESIGN OFFICES BUS
978 SF
HA66
PRODUCTION / PRINT ROOM BUS
3175 SF
HA68
WARRANT STORAGE
STG
32 SF
HA70
PAPER STORAGE
S-1
634 SF
HA72
BINDERY / LETTERSHOP
BUS
4498 SF
HA74
OVERNIGHT STORAGE
STG
82 SF
HC01
GENERATOR
1592 SF
HC02
MECHANICAL
1067 SF
TOTAL:
12222 SF
OCCUPANCY OCCUPANT
FACTOR
LOAD
150 SF
7
150 SF
22
300 SF
1
300 SF
3
150 SF
30
300 SF
1
64
REMARKS
GRAPHIC
DESIGN
OFFICES
978 SF
BUS
150 7
EXIT
CLR CAPACITY
33" 165
EXIT
CLR CAPACITY
33" 165
FEC
EXIT
CLR CAPACITY
33" 165
WARRANT
STORAGE
32 SF
STG
300 1
PRODUCTION
/ PRINT
ROOM
3175 SF
BUS
150 22
EXIT
CLR CAPACITY
33" 165
EXIT
CLR CAPACITY
68" 340
PAPER
STORAGE
634 SF
S-1
300 3
BINDERY
/
LETTERSHOP
4498 SF
BUS
150 30
EXIT
CLR CAPACITY
68" 340
EXIT
CLR CAPACITY
68" 340
FEC
OVERNIGHT
STORAGE
82 SF
STG
300 1
PROJECT GENERAL NOTES
A. REFER TO GENERAL INFORMATION SHEETS FOR SYMBOLS AND ABBREVIATIONS.
B. WALLS TO BE REMOVED SHALL BE FROM FLOOR TO STRUCTURE ABOVE UNLESS
OTHERWISE INDICATED AND SHALL INCLUDE ALL MECHANICAL, ELECTRICAL,
ETC. PREPARE ALL DISTURBED AREAS FOR NEW CONSTRUCTION.
C. DO NOT SCALE DRAWINGS TO DETERMINE DIMENSIONS. IF A REQUIRED
DIMENSION IS NOT INDICATED, CONTACT THE ARCHITECT FOR DETERMINATION.
D. THE CONTRACTOR SHALL NOT CUT STRUCTURAL MEMBERS/ELEMENTS IN A
MANNER RESULTING IN A REDUCTION OF LOAD CARRYING CAPACITY OR
LOAD/DEFLECTION RATIO.
E. PAINT ALL STEEL DOORS, DOOR FRAMES, INTERIOR BORROW LITE FRAMES,
LINTELS AND OTHER EXPOSED METAL ITEMS UNLESS OTHERWISE NOTED OR
SHOWN.
F. EXISTING CONDITION INFORMATION SHOWN WITHIN THE PROJECT AREA IS
BASED ON FIELD OBSERVATION AND EXISTING DRAWING DOCUMENTATION. ALL
EXISTING CONDITION INFORMATION SHOWN OUTSIDE THE PROJECT AREA IS
PROVIDED FOR REFERENCE ONLY AND HAS NOT BEEN FIELD VERIFIED.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS
PRIOR TO BEGINNING ANY NEW WORK AND SHALL BRING AND DISCREPANCIES
TO THE ATTENTION OF THE DESIGN PROFESSIONAL PRIOR TO DEMOLITION AND
CONSTRUCTION.
G. STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE LIQUIDS IS UNDERSTOOD TO
NOT BE WITHIN THE BUILDING. STORAGE OF ANY MATERIAL IS TO BE IN
COMPLIANCE WITH ALL APPLICABLE CODES AND AUTHORITIES HAVING
JURISDICTION.
LIFE SAFETY GENERAL NOTES
A. REFER TO ELECTRICAL DRAWINGS FOR FIRE ALARM
NOTIFICATION AND EMERGENCY EGRESS LIGHTING
LOCATIONS.
B. REFER TO PARTITION TYPES FOR FURTHER FIRE
SEPARATION REQUIREMENTS.
C. ALL FIRE RATED ASSEMBLIES SHALL BE INSTALLED IN
STRICT ACCORDANCE WITH TESTED ASSEMBLIES
INDICATED.
D. WHERE A RATING HAS BEEN GIVEN TO AN EXISTING WALL,
ALL PENETRATIONS (EXISTING OR NEW) SHALL BE SEALED
AND PROPERLY FIREPROOFED PER THAT RATING
REQUIREMENT.
LIFE SAFETY LEGEND
FIRE RATINGS
2FB
2 HOUR FIRE BARRIER WALL
2FW
2 HOUR FIRE WALL
EGRESS
TRAVEL DISTANCE TO AN EXIT
GROUP
14225 UNIVERSITY AVENUE, SUITE 110
WAUKEE, IOWA 50263
(515) 225-3469 / info@f-w.com
www.f-w.com
Engineers | Architects | Surveyors | Scientists
ARCHITECTURAL GENERAL NOTES
A. REFER TO LIFE SAFETY SHEETS FOR LIFE SAFETY INFORMATION.
B. CONTRACTOR TO PROVIDE ALL ADDITIONAL FRAMING NECESSARY FOR ALL
OPENINGS AND SUPPLEMENTAL FRAMING ABOVE PARTITIONS.
C. CONTRACTOR SHALL COORDINATE WITH OTHER TRADES FOR SYSTEM RELATED
PENETRATIONS NOT SHOWN.
D. CONTRACTOR SHALL MAINTAIN THE BUILDING IN A WEATHERPROOF CONDITION
AT ALL TIMES.
E. PROJECTS SHALL REMAIN IN COMPLIANCE WITH ALL ASPECTS OF ALL
GOVERNING CODES AND ORDINANCES DURING THE COURSE OF
CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, EXITING, FIRE ALARM
SYSTEM(S) SMOKE/FIRE DETECTION SYSTEM(S), SPRINKLER SYSTEM(S).
F. TEMPORARY BARRICADES SHALL BE INSTALLED BY CONTRACTOR AT AREAS OF
WORK TO CONTAIN CONSTRUCTION ACTIVITY AND TO PREVENT UNAUTHORIZED
PERSONS FROM ENTERING THE WORK AREA. COORDINATE LOCATIONS WITH
OWNER.
G. ALL AREAS TO BE DEMOLISHED OR DISTURBED BY ANY DEMOLITION ARE TO BE
PATCHED AND PAINTED (OR PREPARED FOR OTHER SCHEDULED FINISH). IF
PAINTING IS REQUIRED, ENTIRE WALL SHALL RECEIVE PAINT TO AVOID
MISMATCH OF COLOR.
H. ALL OPENINGS AND VOIDS LEFT BY THE REMOVAL OF EXISTING CONSTRUCTION,
EQUIPMENT, PIPING, DUCTS, ETC, SHALL BE PROPERLY PATCHED AND CLOSED
OFF TO MAINTAIN PROPER FIRE RATING IN AFFECTED WALL, FLOOR, OR ROOF.
PREPARE PATCHED AREAS TO RECEIVE NEW FINISHES AS SCHEDULES (OR
MATCH EXISTING FINISHES IF NOT OTHERWISE IDENTIFIED).
I. WHEN PATCH OF EXISTING FLOOR IS REQUIRED, SLOPING OR RAMPING IN
EXCESS OF CONTRACT TOLERANCES WILL NOT BE ALLOWED (1/8" PER 10 FEET
MAXIMUM).
J. UPON REMOVAL OF TEMPORARY PARTITIONS, CONTRACTOR IS RESPONSIBLE
FOR PATCHING TO MATCH EXISTING ADJACENT CONSTRUCTION.
K. AT CONSTRUCTION ACCESS, CONTRACTOR TO PROVIDE LABOR AND MATERIALS
TO REPAIR ALL DISTURBED ELEMENTS.
L. REMOVAL OF CERAMIC TILE AND GROUT BEDS FROM EXISTING WALLS AND
FLOOR SHALL INCLUDE PREPARATION FOR NEW CONSTRUCTION.
M. IT IS THE RESPONSIBILITY OF EACH CONTRACTOR TO PROVIDE COMPLETE
WORKING SYSTEMS FOR ALL NEW ELEMENTS AND TO COORDINATE THEIR
WORK WITH ALL OTHER TRADES.
N. ALL CONTRACTORS SHALL PROVIDE NEW, UNDAMAGED MATERIALS UNLESS
OTHERWISE SPECIFIED.
O. STORE MATERIALS IN SUCH A MANNER AS NOT TO OVERSTRESS, OVERLOAD, OR
OTHERWISE PUT AN UNSAFE LOAD ON ANY STRUCTURE DURING
CONSTRUCTION.
P. INSTALL ALL WORK IN ACCORDANCE WITH CURRENT APPLICABLE CODES,
PUBLISHED STANDARDS, AND ACCEPTABLE CONSTRUCTION STANDARDS.
Q. DETAILS ARE GENERALLY TYPICAL AND ARE NOT TO BE CONSTRUED AS LIMITED
TO THOSE AREAS SPECIFICALLY INDICATED. REVIEW ANY QUESTIONS OR
CONFLICTING INFORMATION WITH THE DESIGN PROFESSIONAL PRIOR TO
FABRICATION OR INSTALLATION.
R. CONTRACTOR SHALL VERIFY DIMENSIONS IN FIELD PRIOR TO BEGINNING
CONSTRUCTION.
S. HINGE SIDE OF DOOR JAMBS TO BE LOCATED 4” FROM NEAREST WALL
INTERSECTION UNLESS OTHERWISE NOTED.
DEFERRED SUBMITTALS
THE FOLLOWING SYSTEMS ARE A DESIGN/BUILD RESPONSIBILITY OF THE
CONTRACTOR OR PRODUCT MANUFACTURER AND WILL REQUIRE THE DEFERRED
SUBMITTAL OF DESIGN WORK TO THE AUTHORITY HAVING JURISDICTION FOR PLAN
REVIEW AND PERMITTING:
1. FIRE SPRINKLER SYSTEMS
2. FIRE ALARM SYSTEMS
XX
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
COMMON PATH OF TRAVEL
DEAD END CORRIDOR
EGRESS PATH TAG
EXTERIOR
EXIT
CLR CAPACITY
0" 180
EGRESS CAPACITY
300 4th St
West Des Moines, IA
50265
515-724-7938
ISSUE:
# DATE: DESCRIPTION:
OCCUPANCY
Name
150 SF
XXXX
000 00
ROOM NAME
ROOM AREA
OCCUPANCY TYPE
OCCUPANCY LOAD USED
OCCUPANCY LOAD FACTOR
MISCELLANEOUS
FEC
FIRE EXTINGUISHER CABINET
CODE INFORMATION
HOOVER PRINT SHOP EXPANSION
1305 E WALNUT STREET
DES MOINES, IOWA 50319
WORK DESCRIPTION
INTERIOR RENOVATION AND EXPANSION OF EXISTING PRINT
SHOP AND GRAPHIC DESIGN OFFICE INCLUDING PARTITION
WALLS, FINISHES, MECHANICAL, ELECTRICAL, LIGHTING,
PLUMBING, AND FIRE ALARM SYSTEMS.
APPLICABLE CODES
2024 INTERNATIONAL BUILDING CODE
2012 INTERNATIONAL ENERGY CONSERVATION CODE
STATE MECHANICAL CODE
2024 INTERNATIONAL FIRE CODE
STATE ELECTRIC CODE (2023 NEC WITH AMENDMENTS)
2012 NFPA LIFE SAFETY CODE
ICC A117.1 ACCESSIBILITY CODE
2010 ADA
STATE PLUMBING CODE
100% CD SET
PROJECT:
State of Iowa
BUILDING CONSTRUCTION AND OCCUPANCY
CONSTRUCTION TYPE: EXISTING BUILDING
PRIMARY OCCUPANCY: EXISTING TO REMAIN - GROUP B
FIRE RATING
PRIMARY STRUCTURAL FRAME:
EXISTING TO REMAIN
EXTERIOR BEARING WALLS:
EXISTING TO REMAIN
INTERIOR BEARING WALLS:
EXISTING TO REMAIN
FLOOR CONST/SECONDARY MEMBERS: EXISTING TO REMAIN
CORRIDORS (X-OCCUPANCY):
EXISTING TO REMAIN
ELEVATOR SHAFTS:
EXISTING TO REMAIN
ELEVATOR MECHANICAL:
EXISTING TO REMAIN
STAIRS/EXIT ENCLOSURES:
EXISTING TO REMAIN
BOILER AND FUEL-FIRED HEATER ROOM: EXISTING TO REMAIN
OCCUPANT LOADS
OCCUPANCY - B: 8,725 SF @ 150 GSF/ PERSON = 59 PEOPLE
OCCUPANCY - S: 114 SF @ 300 GSF/ PERSON = 2 PERSON
OCCUPANCY - S-1: 634 SF @ 300 GSF/ PERSON = 3 PEOPLE
TOTAL: 64 PEOPLE
EGRESS
EXIT TRAVEL DISTANCE (CONST TYPE):
___ FT MAX
EXIT TRAVEL DISTANCE FROM POINT
IN ROOM (CONST TYPE):
___ FT MAX
EXIT TRAVEL DISTANCE FROM DOOR
OF ROOM (CONST TYPE):
___ FT MAX
COMMON PATH OF TRAVEL (CONST TYPE): ___ FT MAX
COMMON PATH OF TRAVEL (CONST TYPE)
> # OCC =
___ FT MAX
≤ # OCC =
___ FT MAX
COMMON PATH OF TRAVEL (CONST TYPE): ___ FT MAX
DEAD END CORRIDORS (CONST TYPE):
___ FT MAX
EXIT TRAVEL DISTANCE TO SMOKE
COMPARTMENT:
___ FT MAX
EGRESS CORRIDOR WIDTH:
__" MIN, 0.2" x OCC LOAD
EGRESS DOOR WIDTH:
32" MIN, 0.2" x OCC LOAD
EGRESS STAIR WIDTH:
44" MIN, 0.3" x OCC LOAD
EGRESS PATH A
DAS Hoover Print
Shop Expansion
DAS Project #9473.00
Hoover Building
1305 East Walnut Street
Des Moines, IA 50319
DATE:
DESIGNED:
DRAWN:
REVIEWED:
04/17/2026
SLH
NHD
SLH
SHEET TITLE:
GENERAL
INFORMATION & LIFE
SAFETY PLAN
PATH ID
A
TOTAL PATH LENGTH
LENGTH
112' - 1 5/16"
112' - 1 5/16"
SHEET NUMBER:
LIFE SAFETY PLAN
1
SCALE: 3/32" = 1'-0"
0
4
8
PLAN
16
NORTH
EGRESS PATH B
PATH ID
B
TOTAL PATH LENGTH
LENGTH
67' - 8 9/32"
67' - 8 9/32"
G1.0
PROJECT NO.:
02500979.001
GROUP
14225 UNIVERSITY AVENUE, SUITE 110
WAUKEE, IOWA 50263
(515) 225-3469 / info@f-w.com
www.f-w.com
Engineers | Architects | Surveyors | Scientists
300 4th St
West Des Moines, IA
50265
515-724-7938
ISSUE:
# DATE: DESCRIPTION:
PHASE 1: June - October, 2026
- New work to be performed in the spaces shown in green.
- Existing spaces and equipment shown in white are to remain in tact and
operation during phase one. This includes the current print shop and
inserter room.
- Erect temporary wall at the east end of the existing inserter room to
accomplish new work at the east end of the project.
- Install temporary electrical connections in anticaption of equipment
relocating during Phase 2.
PHASING LEGEND:
PHASE 1 WORK AREA
PHASE 2 WORK AREA
PHASE 3 WORK AREA
TEMPORARY WALL
WS
CANNON COLOR C1350
WS
OCE MICR 1
INSERTER 2
UP
CANNON C9010
WS
OCE MICR 2
WS
SHRINK
WRAPPER
INSERTER 1
2'-0"
100-50
1
PHASE 1 - SCOPE PLAN
SCALE: 1/16" = 1'-0"
100% CD SET
NOT FOR CONSTRUCTION
PROJECT:
State of Iowa
DAS Hoover Print
Shop Expansion
DAS Project #9473.00
Hoover Building
1305 East Walnut Street
Des Moines, IA 50319
DATE:
DESIGNED:
DRAWN:
REVIEWED:
04/17/2026
Designer
Author
Approver
SHEET TITLE:
PHASE 1
SHEET NUMBER:
Ph0.1
PROJECT NO.:
02500979.001
GROUP
14225 UNIVERSITY AVENUE, SUITE 110
WAUKEE, IOWA 50263
(515) 225-3469 / info@f-w.com
www.f-w.com
Engineers | Architects | Surveyors | Scientists
300 4th St
West Des Moines, IA
50265
515-724-7938
ISSUE:
# DATE: DESCRIPTION:
PHASE 2: November, 2026 - January, 2027
- New work to be performed in the spaces shown in blue.
- Equipment to be relocated as shown and operation at these locations
during Phase 2.
- Coordinate equipment relocation and calibration with equipment supplier.
- Maintain and erect temporary walls as needed to perform work.
PHASING LEGEND:
PHASE 1 WORK AREA
PHASE 2 WORK AREA
PHASE 3 WORK AREA
TEMPORARY WALL
2'-0"
2'-6"
GRAPHIC
DESIGN
OFFICES
HA64
PRODUCTION /
PRINT ROOM
HA66
WS
3'-6"
INSERTER 1
BINDERY /
LETTERSHOP
HA72
3'-3" CANNON C9010 3'-6"
5'-0" OCE MICR 1
WS
2'-0"
WS
OCE MICR 2
PAPER
STORAGE
HA70
SHRINK
WRAPPER
CUTTER
FOLDER
MECHANICAL
HC02
UP
GENERATOR
HC01
1 PHASE 2 - SCOPE PLAN
SCALE: 1/16" = 1'-0"
100% CD SET
NOT FOR CONSTRUCTION
PROJECT:
State of Iowa
DAS Hoover Print
Shop Expansion
DAS Project #9473.00
Hoover Building
1305 East Walnut Street
Des Moines, IA 50319
DATE:
DESIGNED:
DRAWN:
REVIEWED:
04/17/2026
Designer
Author
Approver
SHEET TITLE:
PHASE 2
SHEET NUMBER:
Ph0.2
PROJECT NO.:
02500979.001
GROUP
14225 UNIVERSITY AVENUE, SUITE 110
WAUKEE, IOWA 50263
(515) 225-3469 / info@f-w.com
www.f-w.com
Engineers | Architects | Surveyors | Scientists
300 4th St
West Des Moines, IA
50265
515-724-7938
ISSUE:
# DATE: DESCRIPTION:
PHASE 3: January, 2027
- New work to be performed in the spaces shown in purple.
- Equipment to be relocated to it's final location as shown on sheet A8.1.
- Coordinate equipment relocation and calibration with equipment supplier.
PHASING LEGEND:
PHASE 1 WORK AREA
PHASE 2 WORK AREA
PHASE 3 WORK AREA
TEMPORARY WALL
GRAPHIC
DESIGN
OFFICES
HA64
PRODUCTION /
PRINT ROOM
HA66
1 PHASE 3 - SCOPE PLAN
SCALE: 1/16" = 1'-0"
BINDERY /
LETTERSHOP
HA72
PAPER
STORAGE
HA70
MECHANICAL
HC02
UP
GENERATOR
HC01
100% CD SET
NOT FOR CONSTRUCTION
PROJECT:
State of Iowa
DAS Hoover Print
Shop Expansion
DAS Project #9473.00
Hoover Building
1305 East Walnut Street
Des Moines, IA 50319
DATE:
DESIGNED:
DRAWN:
REVIEWED:
04/17/2026
Designer
Author
Approver
SHEET TITLE:
PHASE 3
SHEET NUMBER:
Ph0.3
PROJECT NO.:
02500979.001
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow CY26 Administrative Contracting Officer Support and GSA Vehicle Support at IAAAP and ...

DEPT OF DEFENSE

Bid Due: 12/19/2026

...of Iowa Department of Administrative Services (DAS) is seeking professional design services to ...

State Government of Iowa

Bid Due: 6/22/2026

...Type Request for Bids County Description Description The Iowa Department of Administrative Services... ...

State Government of Iowa

Bid Due: 6/24/2026

...of Administrative Services will be receiving bids for demolition of utilities in tunnels, ...

State Government of Iowa

Bid Due: 6/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.