| Location: | Connecticut |
|---|---|
| Posted: | Mar 20, 2025 |
| Due: | Mar 25, 2025 |
| Agency: | City of Norwich |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-68 |
| Publication URL: | To access bid details, please log in. |
Project Description: NPU intends to prequalify engineering/consulting firms in the service categories listed below. Service category requirements are provided in this RFQ.
1. Natural Gas System Modeling
2. Project Planning, Permitting, and Coordination
3. Steel Pipeline Design
4. Plastic Pipeline Design
5. LNG Plant Design & Operations
6. Pipeline Welding Procedures & Inspection
7. Cathodic Protection Consultation, Inspection & Monitoring
8. District Regulator/Gate Station Design & Operations
9. Training & Qualification (OQ)
10. Regulatory Compliance

With GovernmentContracts, you can:
..., and manage the loan pipeline in real time. The selected firm will ...
Connecticut Housing Finance Authority
Bid Due: 6/17/2026
...NAICS Code: 237120 - Oil and Gas Pipeline and Related Structures Construction Place ...
DEPT OF DEFENSE
Bid Due: 6/22/2026
...related to the rehabilitation of sewer manholes and sewer and drain pipelines throughout ...
Trumbull town
Bid Due: 6/17/2026
...documentation, and manage the loan pipeline in real time. The selected firm will ...
Connecticut Housing Finance Authority
Bid Due: 6/17/2026