| Location: | Pennsylvania |
|---|---|
| Posted: | May 21, 2025 |
| Due: | Jun 4, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Warminster Township, Bucks County |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be completed under this contract consists of all labor, equipment and materials necessary to
complete various stormwater management maintenance projects at seven (7) locations in Warminster
Township: Centennial Road, Laurel Avenue, Manor Drive, Arbor Lane, Lavera Road, Kemper Drive and Acorn
Drive. The stormwater work generally includes the following: replacement of 3’x12’ and 3’x16’ box culverts,
replacement of a 42” diameter Smooth Lined Corrugated Plastic Pipe (167 linear foot and 200 linear foot)
and a 72” diameter Smooth Lined Corrugated Plastic Pipe (163 linear foot), streambank restoration,
installation of concrete wing walls, a concrete endwall, a manhole, inlets and cofferdams, and the relocation
of a shed. Construction will occur in Township easements and rights-of-way and will involve roadway,
sidewalk, curb, riparian buffer and lawn restoration.

With GovernmentContracts, you can:
..., including pipe cleaning, CCTV inspection, bypass pumping, liner installation, traffic control, restoration, ...
PennBid
Bid Due: 6/11/2026
.... The project consists of the installation of 18-inch High-Density Polyethylene (HDPE) storm ...
PennBid
Bid Due: 6/17/2026
...of aeration fan, piping, pipe supports, valves, instruments and aeration trench components. * ...
PennBid
Bid Due: 6/19/2026
..., constructing the gravity sewer pipe including clearing and grubbing in easement/unpaved areas, ...
PennBid
Bid Due: 7/01/2026