| Location: | Kentucky |
|---|---|
| Posted: | Nov 25, 2024 |
| Due: | Nov 26, 2024 |
| Agency: | State Government of Kentucky |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB-785-2500000227-4 |
| Publication URL: | To access bid details, please log in. |
Description: RFB-122-25 KSFB - Freedom Hall Seating Replacement
Department: Facilities & Support Services
Buyer: Susan Ward
Solicitation Number: RFB-785-2500000227-4
Type: Request for Bids (RFB)
Category: Construction
Closing Date and Time: 11/26/2024 01:30 PM EST
| Line Number | Commodity Description | Details | Requested | |
|
1
|
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.***
Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED.
On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.
** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded**
The Big Sandy Community and Technical College Pikeville Campus Allied Health Renovation project includes renovations to the south portion of the second floor of the N. Clayton Little Building. The N. Clayton Little Building was originally constructed in 1999 and has not been renovated prior.
This project is funded by a federal grant. Contractor will be required to meet the grant requirements for documentations and use the Davis Bacon wage rates.
This project includes renovations to the existing lab and classroom spaces to provide new nursing skills labs, a nursing simulation lab, an EMS simulation lab, and an updated nursing aide lab. The renovation will include the replacement of the existing floors in the renovated space and connecting corridor with luxury vinyl tile flooring. The doors and frames for each of the renovated rooms will be enlarged to accommodate the movement of hospital beds between the renovated spaces. New casework consisting of laminate faced wood with solid surface counters will be provided to meet the storage needs in each of the classrooms. New acoustical ceiling tile systems will be provided in each of the renovated labs as well as the connecting corridor. New walls will be a gypsum metal stud system and miscellaneous CMU work will be provided as needed for the modification of doorways and miscellaneous masonry repairs. All new and existing walls within the renovated spaces and connecting corridor will receive a new paint finish.
Mechanical, electrical, and plumbing systems will be reworked to accommodate the new layout. New lighting will be provided throughout the space.
|
Specifications
Commodity Code
912
|
Service From
12/05/2024
Service To
10/05/2025
|
View Purchase History
Additional Information
|

With GovernmentContracts, you can: