ADDENDUM NO. 1
TIDEWATER LANDING PHASE 1 B
RIVERWALK EAST CONTRACT 2 -
EARLY SITE WORK
BID #27-008
PAWTUCKET, RI
PAWTUCKET, RHODE ISLAND
DEPARTMENT OF PUBLIC WORKS
250 ARMISTICE BOULEVARD
PAWTUCKET, RHODE ISLAND
ISSUED: October 29, 2026
Addendum #1
TIDEWATER LANDING PHASE 1 B
RIVERWALK EAST CONTRACT 2 - EARLY SITE WORK
BID #27-008
Pawtucket, RI
The attention of bidders submitting proposals for the above-referenced project is
called to the following Addendum to the Request for Proposals indicated above. The
items set forth herein, whether of omission, addition, substitution or other change, are
all to be included in, and form a part of the proposed Contract Documents for the work.
Inclusion of this Addendum must be acknowledged in the spaces provided in the
document entitled "Request for Proposals Bid #27-008 Tidewater Landing Phase 1
B - Riverwalk East Contract 2- Early Site Work". Failure to acknowledge any and
all addenda in the above specified bid form may be cause for rejection of the bids
by the Owner on the grounds that it is not responsive.
This Addendum consists of Four (4) pages and Four (4) attachments, (24 pages),
for a total of 28 pages.
1. UPDATES TO REQUEST FOR PROPOSALS
A. Section 1 - Bid/Solicitation Information
Requests for Further Information is extended to 12/10/2026 at 4:00
PM
RFP Submission Deadline is extended to 01/14/2027 at 12:00 PM
Bids will be publicly opened on 01/14/2027 at 4:00 PM
B. Section 4 - Scope of Work
Subsection 4.2.1 Project Schedule
Project Award: 01/28/2027
Notice to Proceed - TBD
Start of Construction: 02/22/2027
Substantial Completion: 05/01/2027
Final Completion: 05/15/2027
Subsection 4.3 Scope of Work
Environmental investigation is currently underway and the
results are anticipated to be shared via an addendum in
December. Responses to prebid questions will be answered
once the environmental testing is completed.
C. Appendix C - General Wage Rate Decision Davis Bacon
Add - Municipal Contract Addendum Rhode Island Department Of
Labor and Training Prevailing Wage Requirements (37-13-1 SEQ.)
Addendum #1 - Tidewater Landing Phase 1 B Riverwalk East Contract 2 - Early Site Work
U p d a t e s & Q u e st i o n s a n d An s we r s: Pa g e 1 o f 3
D. Attachment D - Contract 1 Plans are being provided for reference to
ongoing work within the Project Area.
2. UPDATES TO PLANS & SPECIFICATIONS
See Attachment B - None
3. QUESTIONS & ANSWERS RECEIVED AT THE PRE-BID
CONFERENCE AND VIA EMAIL.
Q1: Would you pls lmk if the large granite blocks indicated on the Layout
Plan PA-1 Page 6 are included in the Tidewater Landing Phase 1B
Riverwalk East Contract 2 Early Site Work that bids Nov 12.
A1: There is no Layout Plan PA-1 in the plan set or any reference to using
large granite blocks in this Contract.
Q2: Clarify the loam and seed requirements for areas outside the 1-foot
and 2-foot hatched capping limits shown on the plans.
A2: Clarification regarding loam and seed requirements, including
hydroseeding limits and treatment of areas outside the permanent
capping limits, will be provided in a future addendum.
Q3: Whose responsibility is snow removal within the project area?
A3: Snow removal within the project limits shall be the responsibility of the
Contractor.
Q4: Can organic material generated from clearing, grubbing, and tree
removal be disposed of off site?
A4: Answer provided in future addendum.
Q5: Location A is currently a depressed area. May excess fill generated
from Location B be used to raise Location A above existing grades?
A5: Answer provided in future addendum.
Q6: Can lead-impacted soils at Location B be field tested and live loaded
for disposal rather than stockpiled and tested?
A6: Answer provided in future addendum.
Q7: Where will the construction laydown area be located?
A7: The construction laydown area will be coordinated with the Contractor
and shall be located within a cleared area inside the fenced limits
established under Contract 1. Staging and laydown activities will not be
permitted in adjacent parking lots or outside the designated
construction fence limits.
----------------------------------------------------------------------------------------------------
Addendum #1 - Tidewater Landing Phase 1 B Riverwalk East Contract 2 - Early Site Work
U p d a t e s & Q u e st i o n s a n d An s we r s: Pa g e 2 o f 3
ATTACHMENTS:
A. Pre-Bid Meeting Agenda and Sign-In Sheet (4 total pages, including 1 fly sheet)
B. Plans and Graphics (1 page, including 1 fly sheet)
C. Appendix C - General Wage Rate Decision Davis Bacon (4 pages, including 1
fly sheet)
D. Supplemental Information - Contract 1 Plans (15 pages, including 1 fly sheet)
Please contact Michael Wilcox (401-728-0500 ext 447), City of Pawtucket, with any
questions.
Addendum #1 - Tidewater Landing Phase 1 B Riverwalk East Contract 2 - Early Site Work
U p d a t e s & Q u e st i o n s a n d An s we r s: Pa g e 3 o f 3
Attachment A: Pre-Bid Meeting Agenda and Sign-In Sheet
PRE-BID MEETING AGENDA
RIVERWALK EAST CONTRACT 2 - EARLY SITE WORK
TIDEWATER PHASE 1B - PUBLIC INFRASTRUCTURE
Pawtucket, Rhode Island
Owner: City of Pawtucket, RI
City of Pawtucket Bid No. 27-008
October 22, 2026 at 11:00 am
Name of Owner: City of Pawtucket, RI
Name of Engineer: BETA Group, Inc.
Location: 100 Freight Street (Room 204)
Pawtucket, RI 02860
ATTENDEES: See sign in sheet
Anticipated Schedule
1. Bids Due:11/12/2026 at 12:00PM
2. Bid Opening Date: Thursday 11/12/2026 at 4:00PM Refer to noted submission times in this RFP
3. Project Award: 11/19/2026
4. Project Begins: 12/01/2026
5. Substantial Completion:04/01/2026
6. Final Completion: 04/15/2026
Questions/Addendums
Questions shall be submitted in writing, concurrently to both:
o Michael Wilcox, Project Engineer: Email:mwilcox@pawtucketri.gov and
o Kevin Aguiar: EmailKAguiar@BETA-Inc.com
Addenda will be issued on the provided on the City's Website. It is the bidder's responsibility to check the site
for up-to-date addenda and question responses.
Questions Deadline:Thursday, October 29, 2026, 2PM ET
Addenda and Question Responses:Friday, November 6, 2026, 4PM
Scope of Work (By Contractor)
In general terms, the Project includes, but is not limited to, the following construction activities:
Mobilization & Demobilization from the site.
Establishment of project control points, benchmarks, and layout of baselines.
Installation and maintenance of erosion controls.
Tree clearing and understory brush cutting and removal.
Installation of closed drainage system, temporary sediment forebay, and temporary drainage swales.
Construction of the shared access path
Soil management and remediation
Remove and dispose of lead impacted soils
Restoration of disturbed areas
PAGE 1
TIDEWATER PHASE 1B PUBLIC INFRASTRUCTURE
RIVERWALK EAST CONTRACT 2 - EARLY SITE WORK
PAWTUCKET BID # 27-008
Additional Bidding Details
Award will be made based on the evaluation criteria in the RFP.
Prevailing Wage Rates apply
Addendum 1 to be issued - Anticipated to include:
o Pre-bid attendees Sign-In Sheet
o Questions
PAGE 2
Attachment B: Plans and Graphics
Attachment C: Appendix C - General Decision Number

With GovernmentContracts, you can:
Info Opening Time Solicitation Number Status Bid Title Posting Group Posting Entity Contact
State Government of Rhode Island
Bid Due: 11/10/2026
Info Opening Time Solicitation Number Status Bid Title Posting Group Posting Entity Contact
State Government of Rhode Island
Bid Due: 11/17/2026
OEV27007095 |MPA 603 LITERACY AND DYSLEXIA ENDORSEMENT PROVIDERS The Rhode Island Department of
State Government of Rhode Island
Bid Due: 2/29/2028
Info Opening Time Solicitation Number Status Bid Title Posting Group Posting Entity Contact
State Government of Rhode Island
Bid Due: 11/12/2026