| Location: | District of Columbia |
|---|---|
| Posted: | Nov 2, 2026 |
| Due: | Dec 4, 2026 |
| Agency: | Airports Council International |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
REQUEST FOR QUALIFICATIONS
PRE-DESIGN, DESIGN & ENGINEERING SERVICES (PART 1)
Inbound Baggage Handling System
REQUEST NUMBER: 2616
DUE DATE: December 4, 2026
DUE TIME: 2:00 pm (local)
Gerald R. Ford International Airport RFQ 2616 Page 1
Table of Contents
INTRODUCTION ....................................................................................................................................................................... 3
SOLICITATION AND PROJECT SCHEDULE ................................................................................................................................. 3
VOLUNTARY PRE-SUBMISSION CONFERENCE ........................................................................................................................ 3
SCOPE OF WORK ..................................................................................................................................................................... 4
CONTRACTUAL EXPECTATIONS ............................................................................................................................................... 5
STATEMENT OF QUALIFICATIONS (SOQ) SPECIFICATIONS ..................................................................................................... 5
MISCELLANEOUS ..................................................................................................................................................................... 7
QUALIFICATIONS SUBMISSION ............................................................................................................................................... 9
EVALUATION MATRIX ........................................................................................................................................................... 10
FEDERAL CONTRACT PROVISIONS......................................................................................................................................... 11
EXHIBIT A - Layout ................................................................................................................................................................. 27
EXHIBIT B - Standard Form Of Agreement For Engineering Services ..................................................................................... 27
Gerald R. Ford International Airport RFQ 2616 Page 2
| ACTIVITY | DATE | ||
|---|---|---|---|
| RFQ Issue Date | December 4, 2026 | ||
| Question Deadline | November 20, 2026 | ||
| Submission Due Date | November 25, 2026 at 2 pm | ||
| Short-List Determination | December 11, 2026 | ||
| Professional Interviews | Early December 2026 | ||
| Firm Selection/Contract Negotiation | Late December 2026/Early January 2027 | ||
| Airport Board Contract Review* | January/February 2027 |
| CONFERENCE DETAILS | |
|---|---|
| Conference Date | November 18, 2026 |
| Conference Time (local) | 2 pm |
| Conference Location | International Room 1st floor of the airport terminal building, 5500 44th St. SE, Grand Rapids, MI 49512 |
INTRODUCTION
The Gerald R. Ford International Airport Authority (GFIAA) is seeking Professional Design & Engineering expertise for an
inbound baggage handling system. The firm selected as the consultant for this project must be capable of providing the
full range of design and construction phase services for the entire scope of work. Successful design of this project could
require the use of specialists in inbound baggage handling systems and phased construction. Consulting firms that
possess significant airport project management capability and resources, combined with demonstrated expertise in the
performance of inbound baggage and airport improvements, are invited to submit their qualifications in accordance
with the criteria specified in the Request for Qualifications (RFQ). Interested respondents must be able to demonstrate
successful implementation of projects using alternative project delivery methods.
Project: Design and oversee construction of a baggage handling system for incoming baggage, and supporting space, at
the Gerald R. Ford International Airport (GRR).
To obtain the highest quality facility within the required schedule and budget allocations, GFIAA seeks a consulting firm
through a 2-part public Qualifications-Based Selection (QBS) process which includes an initial qualifications evaluation
followed by short list interviews. Fee negotiation will commence with the selected consulting firm after contract award.
This 2-part selection process articulates the GFIAA's goals and provides openness and consistency so that all qualified
firms receive fair consideration. The remainder of this Statement of Qualifications (SOQ) identifies specifics regarding
the project.
SOLICITATION AND PROJECT SCHEDULE
ACTIVITY DATE
RFQ Issue Date December 4, 2026
Question Deadline November 20, 2026
Submission Due Date November 25, 2026 at 2 pm
Short-List Determination December 11, 2026
Professional Interviews Early December 2026
Firm Selection/Contract Negotiation Late December 2026/Early January 2027
Airport Board Contract Review* January/February 2027
*GFIAA Board review and approval of the design contract, and contract execution, is contingent upon receipt of federal
funding
VOLUNTARY PRE-SUBMISSION CONFERENCE
CONFERENCE DETAILS
Conference Date November 18, 2026
Conference Time (local) 2 pm
International Room 1st floor of the airport terminal building,
Conference Location
5500 44th St. SE, Grand Rapids, MI 49512
Gerald R. Ford International Airport RFQ 2616 Page 3
| Virtual Location | https://teams.microsoft.com/meet/284941272784664?p=vvEZ27GmrCpQxgdm7v Meeting ID: 284 941 272 784 664 Passcode: D7kA9Vu9 |
|---|
https://teams.microsoft.com/meet/284941272784664?p=vvEZ27GmrCpQxgdm7v
Virtual Location Meeting ID: 284 941 272 784 664
Passcode: D7kA9Vu9
The purpose of the voluntary pre-submission meeting is to provide equal opportunity for Respondents to inspect
the location, if applicable, and seek clarifications to the solicitation. Respondents shall have fully reviewed all
solicitation documents and correspondence prior to the pre-submission meeting. The GFIAA will respond to post
pre-submission meeting material inquiries at its sole discretion. Any material response to a post-submission
meeting question will be posted on the inquiry page for this solicitation.
Attendees requiring special services are asked to provide their requirements to the GFIAA at least forty-eight (48) hours
in advance to allow for accommodations.
SCOPE OF WORK
The GFIAA issues this RFQ in its process to obtain a partner for an inbound baggage system pre-design, design, and
construction services.
Background: GRR recently consolidated its split ticketing lobbies into one location on the west side of the Terminal. In
accordance with the Master Plan the old east ticketing area will be renovated to support new inbound baggage claim
devices (see Exhibit A). The following items are considered as the minimum scope of work to be performed by the
consultant. The final scopes of work will be negotiated with the selected consultant and is dependent upon federal
project financing. An initial contract for pre-design services is anticipated with design and construction phase services
amendments to follow. Pre-design, design, and construction phase services are dependent upon available funds which
are subject to federal approval and are not guaranteed at the time of RFQ issuance. Approval of design and construction
phase funding is anticipated in separate fiscal years.
* Program Management
Project progress reporting;
o
Document control with a collaborative project management system.
o
* Pre-design Development
Review and validation of the 2018 Master Plan data regarding the proposed inbound baggage system,
o
prepared by RS&H as the project basis;
Provide drawings and renderings of preliminary and final recommended concepts;
o
Provide a Pre-design Report describing recommended improvements, construction phasing
o
requirements, and estimated project costs;
Provide Level of Service (LOS) framework to measure passenger comfort, space provision, density, and
o
wait times in bag claim areas;
Review proposed inbound bag drop locations to support airline operations;
o
Review new solutions and automation technologies to improve the handling of inbound bags;
o
Review the necessary support spaces for inbound bag claim devices, operations, and security;
o
Provide as needed environmental services to meet program requirements;
o
* Phasing
Provide recommended phasing and a schedule for implementation of the pre-design concepts;
o
Improvements must be completed while maintaining the current level of service for airport operations.
o
* Cost Estimates and Contracting
Provide estimated costs for pre-design, design, construction, and construction administration services;
o
Provide recommendations as to construction delivery methods.
o
* Design Development Phase
Gerald R. Ford International Airport RFQ 2616 Page 4
Provide Design Development phase services, though final design to support the selected construction
o
delivery method;
Deliver Schematic Design (SD), Design Development (DD), and Construction Documents (CD) for FAA and
o
airport reviews and conduct associated review meetings.
* Construction Phase
Provide Construction Phase/Administration services, through project closeout;
o
Provide contract support in accordance with all local, state, and federal requirements including
o
documentation required for federal and state funding for all project phases.
* Close Out
Coordinate and verify training and commissioning efforts;
o
Contract close out and post occupancy evaluation;
o
Provide as-built drawings in CAD and PDF format;
o
Coordinate and conduct an eleven-month warranty walk through;
o
CONTRACTUAL EXPECTATIONS
GFIAA anticipates utilizing the Michigan Department of Transportation (MDOT) Office of Aeronautics standard
consultant contract as basis for the consultant contract resulting from this selection. Contract documents will be
outlined in part 2 of this selection process which will be issued to short listed firms. Federal regulations related to the
use of federal funding will be incorporated into the contract.
Consultants are required to conform to all federal procurement and contract requirements including Disadvantaged
Business Enterprise (DBE) firm participation in their submittal including those certified via the Michigan Department of
Transportation Michigan Unified Certification Program (MUCP). GFIAA will provide expected DBE participation goals
during the contract review process. All responses are required to submit information concerning the DBEs that will
participate in the contract.
STATEMENT OF QUALIFICATIONS (SOQ) SPECIFICATIONS
Firms interested in partnering with GFIAA and working to further improve their baggage handling systems are
encouraged to submit Statements of Qualifications. Qualifications must be submitted in the format outlined below:
Executive Summary - One (1) page maximum
Provide an overview of your firm's qualifications, relevant experience, and capabilities. Describe how your
firm's experience with similar projects will benefit the Authority in the planning, design, and construction
oversight of an inbound baggage handling system.
Problem Statement & Management Summary- Four (4) pages maximum
Demonstrate your firm's understanding of the project's scope, objectives, challenges, and key issues.
Describe your proposed approach for addressing the project's requirements, including anticipated
challenges, potential solutions, and important steps your firm will take to achieve the Authority's project
goals and expectations.
Pre-Design Approach - Three (3) pages maximum
Describe your firm's proposed approach to the pre-design phase of the project. Demonstrate your
understanding of the Authority's objectives, existing operational requirements, and anticipated project
needs related to the inbound baggage handling system. Discuss your approach to identifying project risks
and constraints, establishing preliminary project scope, developing cost estimates and schedules, and
providing recommendations to support the Authority's decision-making and advancement of the project.
Gerald R. Ford International Airport RFQ 2616 Page 5
Inbound Baggage Handling System Capabilities - Three (3) pages maximum
Describe your firm's experience in the design, construction, and administration of inbound baggage
handling systems. Include examples demonstrating your ability to manage project scope, budgets, quality,
and safety standards. The respondent shall demonstrate successful experience managing the construction
phase of at least three (3) inbound baggage system projects at small or medium-sized airports within the
last six (6) years.
Design and Construction Methods - Three (3) pages maximum
Describe your firm's proposed methods for project coordination, cost and quality control, scheduling, and
verification of constructability. Explain your approach to coordinating with the Authority and contractors,
including the preparation and review of construction documents and drawings.
Project Staffing - No page limit
Provide an organizational chart identifying all personnel proposed for the project. Clearly identify lines of
authority, reporting relationships, and communication responsibilities. Include a brief description of each
individual's role, responsibilities, qualifications, and relevant project experience as they relate to this
assignment. Identify key personnel and their anticipated involvement throughout the project. Attach
resumes for all proposed personnel using the GSA SF-330 format.
Relevant Project Experience - No page limit
Provide information on a minimum of three (3) recently completed projects of similar scope, size, and
complexity. At least one project should demonstrate experience comparable in scale to the Authority's
project.
For each project, include the following information:
* Project name, location, and owner.
* Description of project scope and services performed.
* Project schedule and completion date.
* Key personnel involved from your firm and the project owner.
* Pre-construction estimate, contractor's initial pricing, and total final cost.
* Number of change orders
* Contractor references, including contact information.
Highlight any project challenges, solutions implemented, and outcomes that demonstrate your firm's
ability to successfully deliver comparable projects. The Authority recommends including project data
sheets in the GSA SF-330 format. A completed GSA SF-330 Section G shall be included to summarize the
example projects identified in this section, with staff member participation indicated for the individuals
included in Project Staffing section.
References - One (1) page maximum
Provide a minimum of three (3) professional references for projects or services of similar scope, size, and
complexity not mentioned in the Relevant Project Experience section. References should preferably
include clients for whom your firm has performed pre-design or construction administration services.
REQUEST FOR PROPOSAL SUBMISSION
Responses may be delivered physically or electronically. To be considered, complete submissions must be received prior
to the due date and time specified (local time).
* Hard copy responses can be mailed or otherwise delivered to the address below.
Gerald R. Ford International Airport RFQ 2616 Page 6
Submission address:
Attn: Marissa Norris, Senior Procurement Specialist
Gerald R Ford International Airport Authority
5500 44th St SE
Grand Rapids, MI 49512
* Electronic responses can be securely uploaded as a single pdf document to:
https://www.dropbox.com/request/lkdxwka6lutsedqs4b6u
Electronic submissions shall be named with a form or portion of the firm's name as part of the document name.
The firm certifies the response submitted has not been made or prepared in collusion with any other respondent and the
prices, terms or conditions thereof have not been communicated by or on behalf of the respondent to any other respondent
prior to the official opening of this request. This certification may be treated for all purposes as if it were a sworn statement
made under oath, subject to the penalties for perjury. Moreover, it is made subject to the provisions of 18 U.S.C. Section
1001, relating to the making of false statements.
Submissions may be withdrawn by written request only if the request is received on or before the opening date and time.
Submissions not meeting these criterions may be deemed non-responsive.
GFIAA is not liable for any costs incurred by any prospective firm prior to the awarding of a contract, including any costs
incurred in addressing this solicitation.
MISCELLANEOUS
It is preferred by GFIAA that the selected firm have previous experience related to the following:
* Inbound baggage handling system design and construction administration experience;
* Similar experience working with local government work teams on the design and construction of a public use
facility.
* Airport specific construction experience on airport property including inbound baggage handling systems.
* Project development including short term and construction phasing to facilitate continued operations.
A Project Manager (PM) shall be named by the submitting agency in the SOQ. The SOQ shall include the PM's relevant
experience and experience with team members and subconsultant(s) proposed. The PM must participate in the firm's
short list interview if selected.
Information submitted in this solicitation is subject to the Michigan Freedom of Information Act (FOIA) and may not be
held in confidence after the Respondent's submission is opened. A submission will be available for review after staff has
evaluated it, or fifteen (15) business days after the opening date, whichever comes first. GFIAA cannot assure that any
of the information submitted as part of or peripheral to the Respondent's submission will be kept confidential. Any
Respondent submission language as confidential is considered automatically invalid and void. GFIAA is subject to FOIA
which prohibits it from concealing information on or associated with responses, successful or unsuccessful, once they
are opened.
Gerald R. Ford International Airport RFQ 2616 Page 7
Project fees and expenses will not be part of this SOQ submission. Do NOT provide fees and expenses within this
proposal.
Costs for Responding to this RFP - GFIAA will not pay for any information requested in the RFP or any cost incurred in
submitting proposals, responding to additional questions, or participating in the interview process.
Rejection of Proposals - GFIAA reserves the right to reject any or all proposals in whole or in part and to waive
irregularities in proposals received.
Evaluation, Status Updates, and Award Notification - GFIAA reserves the right to request additional information it
may deem necessary after the submissions are received. As part of the evaluation process, Respondents may be
requested to make an oral presentation, at the Respondent's expense, to an evaluation committee. Staff to be
assigned to this project must participate in this presentation unless otherwise waived by GFIAA. The
presentation will be followed by a question and answer session.
Any errors, omissions or discrepancies in the SOQ discovered by a prospective Respondent shall be brought to
the attention of the GFIAA Purchasing Division as soon as possible after discovery. Further, the Respondent
shall not be allowed to take advantage of error, omissions or discrepancies in the specifications.
GFIAA, at its sole discretion, reserves the right to award to the Respondent whose response is deemed most
advantageous to GFIAA. GFIAA, at its sole discretion, shall select the most responsive and responsible
Respondent and evaluate all responses based on the requirements and criterion set forth in this solicitation
while reserving the right to weigh specifications and other factors in the award.
Proposer's Communications with Airport Officials and Employees Restricted - GFIAA staff will not be available for
project related informational meetings until after the short list of firms has been identified. Persons or entities who
intend to respond to the RFQ shall only discuss the RFQ with the designated contact person.
Non-Discrimination - The vendor shall not discriminate against an employee or applicant for employment with respect to
hire, tenure, terms, conditions or privileges of employment, or a matter directly or indirectly related to employment,
because of race, color, religion, national origin, age, sex, height, weight, marital status, or disability that is unrelated to
the individual's ability to perform the duties of a particular job or position. The vendor shall observe and comply with all
applicable federal, state and local laws, ordinances, rules and regulations which shall be deemed to include, but not be
limited to, the Elliott-Larsen Civil Rights Act and the Persons with Disabilities Civil Rights Act.
Project funding will include federal funding sources. All federal regulations related to the use of federal funding,
including federal wage rates, must be adhered to under the construction contract resulting from this RFQ. The contract
will not be executed until federal funding has been identified for this project.
Disadvantaged Business Enterprise (DBE) - GFIAA encourages and solicits participation of qualified minority and women
businesses consistent with the principle of utilizing the most highly qualified and competitive firms. The selected firm
will be expected to include DBE participation in the resulting contract at a rate to be determined by the Michigan
Department of Transportation.
Signature - Each proposal must be signed by a person authorized to sign contracts on the behalf of the firm. The name of
the person signing must be followed by title.
Addendums - Addendums are published on the airport's website. It is the vendor's sole responsibility to monitor the
website for addendums and consider accordingly during preparation of this request.
Taxes - GFIAA is tax exempt. A copy of the Tax Certificate of Exemption is available upon request.
Gerald R. Ford International Airport RFQ 2616 Page 8
Inquiries - For questions regarding submittal requirements, contact Marissa Norris, at mnorris@grr.org. Please note that
staff interviews and/or site visits will not be granted until consultants have been invited for final interviews. GFIAA
reserves the right to publish and respond to an inquiry, respond directly to the inquirer without publishing, or not
respond to the inquiry at its sole discretion.
QUALIFICATIONS SUBMISSION
All proposals must be submitted in writing and in a sealed envelope or package marked "Statement of Qualifications,
RFQ 2616" and include the submitting firm's name. Proposal contents shall be as described in this Request for
Qualifications; sales and marketing materials beyond the scope of this request will not be used to determine award of
this proposal.
Proposals submitted not meeting these criteria may be deemed nonresponsive. Late, faxed or e-mailed proposals will
NOT be considered.
If the proposal is delivered by an express mail carrier or by any other means, it is the vendor's responsibility to ensure
delivery to GFIAA. GFIAA is not responsible for deliveries made to any place other than the designated address or for any
failure associated with any mode of delivery selected by the respondent.
GFIAA is not responsible for delays caused by any occurrence. The time/date clock located in the GFIAA administrative
office lobby shall serve as the official authority to determine lateness of any proposal. Under no circumstances shall
proposals delivered after the time specified be considered. The decision to refuse or consider a proposal that was
received beyond the date/time established in the solicitation shall not be the basis for a protest.
Gerald R. Ford International Airport RFQ 2616 Page 9
| Evaluation Criteria | Maximum Points |
|---|---|
| Executive Summary | 5 |
| Problem Statement & Management Summary | 10 |
| Pre-Design Approach | 35 |
| Inbound Baggage Handling Design Experience | 25 |
| Design and Construction Approach | 15 |
| Project Staffing | 25 |
| Relevant Experience | 15 |
| References | 10 |
| Interview (Shortlist Firms Only) | 40 |
| Total | 180 |
EVALUATION MATRIX
Evaluation Criteria Maximum Points
Executive Summary 5
Problem Statement & Management
10
Summary
Pre-Design Approach 35
Inbound Baggage Handling Design
25
Experience
Design and Construction Approach 15
Project Staffing 25
Relevant Experience 15
References 10
Interview (Shortlist Firms Only) 40
Total 180
Gerald R. Ford International Airport RFQ 2616 Page 10

With GovernmentContracts, you can:
Follow NK Pro Subscription Active Contract Opportunity Notice ID 2032H327N00002 Related Notice Department/Ind.
TREASURY, DEPARTMENT OF THE
Bid Due: 11/12/2026
Basic Information Solicitation Number Doc853872 Title Request For Quotation - FY27_OSSE_Employee DOT Medical
District of Columbia
Bid Due: 11/12/2026
Basic Information Solicitation Number Doc854134 Title FY27 Personal Hygiene Agency Youth Rehabilitation Services
District of Columbia
Bid Due: 11/11/2026
The Kenton County Airport Board ("KCAB") is a Kentucky Municipal corporation established pursuant
Airports Council International
Bid Due: 12/03/2026