Invitation to bid EDPL 1-2026

Location: Illinois
Posted: Jan 16, 2026
Due: Jan 29, 2026
Agency: City of Rock Island
Type of Government: State & Local
Category:
  • 89 - Subsistence (Food)
Solicitation No: EDPL 1-2026
Publication URL: To access bid details, please log in.
Bid Number: EDPL 1-2026
Bid Title: Invitation to bid EDPL 1-2026
Category: Housing Programs
Status: Open
Description:

Invitation to bid roof replacement located at 4202 23rd Avenue. Please refer to the bid document for the entire scope of work.

Publication Date/Time:
1/16/2026 12:00 am
Closing Date/Time:
1/29/2026 2:00 pm
Contact Person:
Jeff Laxton
Related Documents:

Attachment Preview

Invitation to Bid-Posted Date
Roof Replacement
4202 23rd Avenue
EDPL 1-2026
Introduction
The City of Rock Island is requesting bids from contractors for a rehabilitation project at a house located
at 4202 23rd Avenue. This owner-occupied property will be undergoing rehabilitation using Housing and
Urban Development (HUD) funds to ameliorate deteriorating and deteriorated conditions. All work shall
be subject to HUD 35.930 and Environmental Protection Agency (EPA) regulations. Contractors who are
interested in this project will need to schedule a site visit with the homeowner, Alexandria Engman-
VanMeter, by calling them at 309-558-9674, prior to submitting the bid. Sealed bids must be received
on or before January 29th by 2p.m . They shall be addressed and marked as follows.
CED Department
Attn: Jeff Laxton
1528 3rd Avenue
Rock Island, IL 61201
ENCLOSED: 4202 23rd Avenue Bid
Bids may be mailed or delivered in person. Late bids shall not be opened. All sealed bids shall be opened
on 1/29/2026 at 2p.m. at City Hall in the CED Department offices. Contractors who have submitted bids
may attend but are not required to do so. A bid tabulation shall be posted online afterward. All
questions shall be directed to the Construction Officer at 309-732-2906.
Scope of Work
The bidder shall submit a project plan using the design standards below that is in compliance with all
applicable HUD, EPA, and State of Illinois regulations as well as all local building and zoning codes. The
plan must include a clear project timeline and budget with line item costs. The contractor shall act as the
general contractor for the project using subcontractors as required. Subcontractors that will be required
should be clearly identified in the project plan.
Remove existing shingles from the roof down to the roof sheathing. Check for excessively wide gaps in
the roof planking. The back side of the roof should be inspected for water damage. Some framing
members may need to be addressed once the roof has been stripped down. There may be
appropriate and approved repairs at this time. Preferred method would be to repair and install from
the top side of the roof instead of tearing the ceilings down. This maybe cause the roof to be a
complete re-sheath. Install that Ice and snow guard in all of the valleys and lower edges of the roof
line. This must cover 2’ higher than the exterior plate line. Approved water barrier over the remain
roof sheathing. Install new 2’ style D roof edging throughout. Install 35-year architectural shingles of
the homeowner’s choice. Install a shingle over ridge vent following manufacture’s instruction. Allow
maximum cut back of the ridge line for ventilation. Install new plumbing flashing boots, extend the
plumbing vents if less the 12” on the shallow side. Patch all the turtle vent holes with approved
sheathing material. Install all head flashing and new step flashing at the wall lines where required.
On the flat roof pitched will need to be a rolled roofing product installed to manufacture
specification’s for overlaps and end terminations. There is a bath fan roof vent that will need installed
through the roof line and new vent connector to the existing fan in the bath room. The Contractor
will need to have a roof vent installed penetrated through the roof line to the gas dryer. Install
Co2/smokers with a ten-year lithium battery in the appliance area and in the hallway near the
sleeping rooms. Install new gutters and downs in white aluminum secured to the fascia with minimum
of ¼” of fall per foot. Downs will need two wall straps no further then 9’ apart. Tailpipes will need to
all be hinged and 4’ in length draining away from the foundation. Watershed must not be directed
towards neighboring property or to a low area that is susceptible to holding water. Building Permits
must be pulled and Paid for before work begins.
Alternative specifications shall be considered only if they are clearly justified, cost effective, and meet
all project objectives. The contractor shall have 30 days to complete the work from the date of contract
signing. Change work orders over the course of the project are strongly discouraged.
Bidder Qualifications & Requirements
1. Bidders must be currently licensed with the Illinois Secretary of State, bonded, and insured.
2. Bidders must have or be able to obtain all applicable licenses and permits in addition to meeting
all local, state, and federal requirements to perform requested work. Contractors maybe
required additional plans upon permit submittals.
3. Bidders must have and provide proof of General Liability, Vehicle, and Workers Compensation
Insurances and name the City of Rock Island as a Certificate Holder.
4. Bidders must own or be able to rent sufficient equipment to complete the work.
5. Contractor maybe required to supply additional plans or stamped drawings for a plan
review. Which maybe need to obtain a building permit.
Preparation of Bid
Each bid must be submitted on paper and delivered in a sealed envelope. Said envelope shall be clearly
labeled with “ENCLOSED: 4202 23rd Avenue.” The bid must clearly address all requirements as
described above. The cost of the work must be separated into line items with individual costs in addition
to providing a total project cost. Labor costs and material costs must be clearly delineated. The company
name, federal tax ID number, SAMs entity number, contact person, email, phone number, and a date
with signature are all required as well.
Awarding Contracts
The lowest bid shall not automatically guarantee that a contractor will get the work they bid on. Bids
shall be reviewed for pricing, experience, previous work history, references, State Licenses, State
Registration, insurances, bonds, subcontractors, equipment owned, equipment rented, operator
experience, and financial stability. The City at its sole discretion shall decide after a review which
contractor, if any, is responsive to the invitation to bid. All bidding and award procedures undertaken by
the City in regard to this project shall be consistent with the City’s adopted procurement procedures.
Submitted bid prices shall remain valid for 60 days after bid opening.
Bidder Responsibility
Bidders shall keep the bidding process confidential. Each bidder shall be fully acquainted with conditions
relating to the site, the scope of work, any current EPA and HUD regulations pertaining to the work, and
restrictions associated with acceptable execution of requested work. Failure or omission of the bidder to
acquaint themselves with site conditions shall in no way relieve them of any obligation with respect to
their bid or subsequent contract.
Federal, State, and Local Reporting Compliance
The contractor shall provide financial and programmatic information as required by the City of Rock
Island to comply with all Federal, State, and local law reporting requirements. The contractor shall also
adhere to all applicable Federal, State and local regulations including but not limited to the following.
US Department of Housing and Urban Development (HUD): 24 CFR 35
US Environmental Protection Agency (EPA): 40 CFR 745
US Occupational Safety and Health Administration (OSHA): 29 CFR 1926
Contact Information
The primary contact person for this project is the City’s Construction Officer.
Jeff Laxton
CED Department
1528 3rd Avenue
Rock Island, IL 61201
309-732-2906
laxton.jeff@rigov.org
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow Roof Replacement Active Contract Opportunity Notice ID 47PE5426Q0022 Related Notice... (RFQ) for ...

GENERAL SERVICES ADMINISTRATION

Bid Due: 6/12/2026

...Follow Roof Replacement Active Contract Opportunity Notice ID 47PE5426Q0022 Related Notice... as a ...

GENERAL SERVICES ADMINISTRATION

Bid Due: 6/12/2026

...IFB Garden Estates 207-427 Roof Replacement...

Housing Authority of the County of DeKalb

Bid Due: 7/07/2026

...Project ID: Bid #2027-07 Title: Miller Park Zoo Barn Roof Replacement Addenda: 0 ...

City of Bloomington

Bid Due: 6/24/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.