Location: | Georgia |
---|---|
Posted: | Jun 12, 2024 |
Due: | Aug 15, 2024 |
Agency: | DEPT OF DEFENSE |
Type of Government: | Federal |
Category: |
|
Solicitation No: | FA855424RB003 |
Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This solicitation will be used to establish a Firm Fixed Price Requirements type five-year Indefinite Delivery Indefinite Quantity (IDIQ) for 1 (one) year Basic ordering period and four (4) one (1) year ordering periods for Depot Level Teardown, Evaluation and Repair (as needed) of the Bomb Release Unit (BRU-57) Smart Bomb Rack sole source to L3 Harris (CAGE 82340).
The BRU-57/A (BRU- Bomb Release Unit) Smart Bomb Rack used on the F-16 Fighter. The BRU-57 is a MIL-STD-1760 capable, multiple-carriage, vertical-ejection BRU. Two USAF standard BRU-46/A bomb ejector racks are utilized on the BRU-57/A. The BRU-57/A is used to provide side-by-side carriage and release of two 14-inch suspension stores. The BRU-57/A accommodates the MIL-STD-1760 mission stores, allowing for communication between the aircraft Stores Management System (SMS) and the weapon/store. These mission stores include, but are not limited to, Joint Standoff Weapon (JSOW) and the Wind Corrected Munitions Dispenser (WCMD).
Perform depot-level repair of the BRU-57 Smart Rack. Depot-level repair/upgrade encompasses the teardown, evaluation, repair, rebuild, and test of components as specified in the Performance Work Statement (PWS.) The bomb rack and components listed below shall be repaired as required in accordance with original manufacturer's methods and procedures. The Contractor shall tear down and assess the level of repair within 15 working days of receipt of repairable items. The Contractor must control their inventory such that no unit exceeds a work in progress time of 45 working days for 90% of the units. The remaining 10% must be accomplished within a period not to exceed 60 working days. Whenever possible, parts should be stocked or locally manufactured to facilitate timely repair. Required delivery of repaired item is 60 working days after receipt. Contractor shall meet the required delivery at least 90% of the time Sole Source to EDO (82340).
BRU 57, NSN 1095-01-483-3872 GG, P/N MT57M1501-1 Height: 7.1 Width: 29" Length: 69.8 Weight: 250; The BRU 57 is a MIL-STD-1760 capable, multiple carriage, vertical ejection bomb rack unit (BRU). MATERIAL: CRES 17-4PH, 2004 ALUMINUM SUPER PLASTIC ALLOY; ITEM FUNCTION: Carries and releases stores on the F-16 aircraft; Basic Ordering Period 10 ea.; Ordering Periods I-IV 10 ea.
High Band Width Assembly NSN: 1095-01-523-5767, P/N: MT57M1165-1; Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 5.0"; MATERIAL: RTV, metal fasteners, EMI gasketing ITEM FUNCTION: The HBA provides signal routing of the two high bandwidth and low bandwidth signals; Basic Ordering Period 5 ea.; Ordering Periods I-IV 5 ea.
Power Supply Assembly NSN: 6130-01-523-3338GG, P/N: MT57M1177-1; Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 10.0"; MATERIAL Printed circuit board, metal fasteners, locking compound, interfacial sealant; ITEM FUNCTION: controls power regulation for the rack; Basic Ordering Period 5 ea.; Ordering Periods I-IV 5 ea.
Power Supply Assembly NSN: 6130-01-523-3339GG, P/N: MT57E1210-1; Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 10.0"; MATERIAL metal, wire; ITEM FUNCTION: Regulates and provide power for the rack; Basic Ordering Period 15 ea.; Ordering Periods I-IV 15 ea.
Micro Control Assembly NSN: 1095-01-523-3337GG, P/N: MT57M1153-2 and MT57M1153-5; Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 5.0"; MATERIAL Printed Circuit Board, metal fasteners, EMI gasketing, RTV; ITEM FUNCTION: Allow signal transfer throughout the rack; Basic Ordering Period 20 ea.; Ordering Periods I-IV 20 ea.
Bus Buffer Assembly NSN: 1095-01-523-5773GG, P/N: MT57E1212-1 and MT57E1212-2; Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 5.0"; MATERIAL metal, metal fasteners; ITEM FUNCTION: Allow signal transfer throughout the rack; Basic Ordering Period 15 ea.; Ordering Periods I-IV 15 ea.
Circuit Card Assembly NSN: 5998-01-522-7603GG, P/N: MT57M1190-2 and MT57M1190-3; Approx. Dimensions: 24.0" x 12.0" x 6.0", wt. 2.0"; MATERIAL Circuit car, RTV, EMI gasketing, metal fasteners; ITEM FUNCTION: Transfer and control signals, power, and other circuitry. thru out the rack; Basic Ordering Period 15 ea.; Ordering Periods I-IV 15 ea.
May 21, 2024 | [Solicitation (Updated)] Bomb Release Unit (BRU-57) Smart Bomb Rack |
With GovernmentContracts, you can:
Follow DDWG Propane - SP330024Q0260 Active Contract Opportunity Notice ID SP330024Q0260 Related Notice
DEPT OF DEFENSE
Bid Due: 9/19/2024
Follow NIOSH IT Services Active Contract Opportunity Notice ID 2024-89562 Related Notice Department/Ind.
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 10/09/2024
Follow Site Visit - AMXG Trailer and Modular Repair and Maintenance Active Contract
DEPT OF DEFENSE
Bid Due: 9/19/2024
Follow SBA Disaster Recovery and Resilience - High Roof Vans Active Contract Opportunity
GENERAL SERVICES ADMINISTRATION
Bid Due: 9/24/2024