| Location: | Washington |
|---|---|
| Posted: | Oct 4, 2025 |
| Due: | Oct 20, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 10/20/25 1:00pm |
Spokane, WA
This project consists of the construction of 4 pedestrian hybrid beacon systems, including poles and signal conduits and equipment, 1,200 square yards of cement concrete sidewalk, 2,100 linear feet of curb or curb and gutter, 210 square feet of permanent signing, 4,100 square feet of durable striping, traffic control, and other related miscellaneous items.

With GovernmentContracts, you can:
...concrete low flow inlet structure, reinforced concrete flow control outlet structures, 305 linear ...
County of Cowlitz
Bid Due: 11/18/2025
...mix asphalt (HMA), pavement marking, permanent signing, temporary erosion control, temporary... traffic control ...
State Government of Washington
Bid Due: 11/19/2025
...Project ID: ITB# SU0-6990 Title: Roadway Dust Control Addenda: 0 Release Date: 10/8/2025 ...
City of Seattle
Bid Due: 11/20/2025
...portions of one existing bridge, reconstructing the bridge superstructure, traffic control and other ...
State Government of Washington
Bid Due: 12/03/2025