| Location: | Virginia |
|---|---|
| Posted: | Nov 24, 2025 |
| Due: | Dec 4, 2025 |
| Agency: | State Government of Virginia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 106546-1 |
| Publication URL: | To access bid details, please log in. |
Virginia Department of Energy -The project is located on Office Drive off SR 765 near St. Charles, VA.
Closing On: 12/4/25 2:00 PM
Time Left: 9 days, 19 hours
The work to be performed under the terms of this Specification consists of replacing 2 (two) reinforced concrete pipes with a single 10â x 4â box culvert and installing approximately 1.5 feet of flowable fill in the bottom of a single 60â RCP. The removed structures will be taken to the disposal area. The existing road will be raised approximately 1â. Minor grading will take place so that higher flows can move through the crossings more easily. The project is known as the ELY PUCKETT OFFICE DRIVE CULVERT REPLACEMENT PROJECT in LEE COUNTY, Virginia, for the Commonwealth of Virginia.
IFB Construction
View Opportunity
Add to Favorites
With GovernmentContracts, you can:
...Title Tract 8 - Mass Grading Plan Roanoke Centre for Industry and Technology ...
City of Roanoke
Bid Due: 7/14/2026
...consists of E&SC, grading, construction of stormwater management facilities, construction...
State Government of Virginia
Bid Due: 6/13/2026
...demolition, grading, permeable pavement for stormwater management, and erosion and sediment control...
State Government of Virginia
Bid Due: 6/10/2026
...buildings based on available funding. The construction site consists of grading, drainage, and ...
State Government of Virginia
Bid Due: 6/23/2026