| Location: | District of Columbia |
|---|---|
| Posted: | Dec 19, 2025 |
| Due: | Jan 6, 2026 |
| Agency: | Metropolitan Washington Airports Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-25-25989 |
| Publication URL: | To access bid details, please log in. |
IFB-25-25989: Concourse A-B Walkback Tunnel Leak Repairs, IAD
UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide repair leaks in the Concourse A-B Walkback Tunnel at Washington Dulles International Airport (IAD). Work includes, but not limited to, cleaning of the underfloor trench and surrounding floor areas; replacement of sump pumps and installation of hose bibbs; delegated design for the installation of UV lamp arrays in the existing four air handling units serving the walk back tunnel.
Solicitation Issue Date: November 14, 2025
Due Date for Submissions: January 6, 2026
Amendments Issued: Three
SLBE Requirement: 100%
Additional Information - See in MWAA Contract Lifecycle Management System

With GovernmentContracts, you can:
...IFB-26-21670: Air Operations Area Perimeter & Fence Line Enhancements, IAD NEW Description...: The ...
Metropolitan Washington Airports Authority
Bid Due: 6/18/2026
...IFB-26-21670: Air Operations Area Perimeter & Fence Line Enhancements, IAD UPDATED Description...: The ...
Metropolitan Washington Airports Authority
Bid Due: 6/18/2026
...Follow Request for Information (RFI): Intelligent Shift Scheduler Tool for 24/7 Continuous.... Agency ...
DEPT OF DEFENSE
Bid Due: 6/19/2026