| Location: | South Carolina |
|---|---|
| Posted: | May 12, 2025 |
| Due: | May 30, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB#25121 |
| Publication URL: | To access bid details, please log in. |
The main purpose of the project is to improve the drainage system. The work consists of the demolition/removal of the existing drainage system and the installation of new storm drainage lines and catch basins. The contractor shall remove existing asphalt and curbs and place new asphalt pavement and extruded curb after the pipe installation. More details can be found on the link below.

With GovernmentContracts, you can:
...Ad Title: Installation of Pipe and Duct Insulation Purchasing Agent/Entity: Greenville County...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...approved improvements include installation of a 60-inch reinforced concrete pipe (RCP) to maintain... ...
Beaufort County
Bid Due: 7/07/2026
...LF of 8" sanitary sewer line (open cut and 8" HDPE pipe bursting); ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...feet of new 72 inch RCP, riprap with filter fabric on each end, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/09/2026