| Location: | Texas |
|---|---|
| Posted: | Oct 27, 2025 |
| Due: | Dec 2, 2025 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Due to the Hillside Terrace roadway expansion, approximately 826 LF of Owner’s 24-inch ductile iron waterline will need to be relocated. The relocations include a proposed 126 LF of 36-inch steel casing pipe and 20 LF of 36-inch split steel casing and 80 LF trenchless install. The connection work shall be completed within 24 hours for the GBRA 24-inch pipeline as provided in the Sequence of Construction Notes on Sheet G1 of the Plans. Shutoff must occur during the low flow months of November to April.

With GovernmentContracts, you can:
...: Contractor shall provide office Moving and Relocation Services to all The Harris ...
The Harris Center For Mental Health and IDD
Bid Due: 6/10/2026
...418TH CSB Office W6QM MICC-FT BLISS Looking for contract opportunity help? (opens in ...
DEPT OF DEFENSE
Bid Due: 6/10/2026
...Sub Command 3 FDO SAM HOUSTON Office W6QM MICC-FDO FT SAM HOUSTON Looking ...
DEPT OF DEFENSE
Bid Due: 6/12/2026
...Sub Command 2 MISSION INSTALLATION CONTRACTING COMMAND Sub Command 3 418TH CSB Office ...
DEPT OF DEFENSE
Bid Due: 6/15/2026