Agency: | TRANSPORTATION, DEPARTMENT OF |
---|---|
State: | Colorado |
Type of Government: | Federal |
Category: |
|
Posted: | Nov 4, 2022 |
Due: | Dec 15, 2022 |
Solicitation No: | 6982AF22B000021 |
Publication URL: | To access bid details, please log in. |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with the National Park Service (NPS) is proposing to rehabilitate (3R) the pavement and curb conditions for Harpers Corner Road within the Dinosaur National Monument. The project is located in Moffat County near Dinosaur, CO and will consist of rehabilitating approximately 14 miles of the road and one (1) parking area. Harpers Corner Road needs rehabilitation due to deterioration that is typical of aging pavements and due to several subgrade failures.
SCOPE OF THE WORK: The project scope is rehabilitation of existing roads, pullouts and parking areas so that visitors can continue to safely access park destinations.
The existing pavement along Harpers Corner Road is generally in moderate condition with several moderate to high severity subgrade failures. The existing posted speed along the route is 45 mph. This roadway is classified as an NPS Class 1 roadway; a principal park road/rural parkway with one lane in each direction. The existing roadway is paved and varies from 22 to 30 feet in width along the entire 14 miles with an approximate 2% normal crown and superelevation and corner widening, as needed on curves. Existing drainage is adequate with the exception of one subgrade failure where a new culvert is proposed. The asphalt curb and gutter is completely buried in several locations and overrun with vegetation and debris on others. Guardrail is generally in good condition but will be replaced to be meet current MASH requirements.
The project will be split into a base schedule encompassing 4.33 miles, and 2 options, encompassing 2.73 miles and 7.06 miles. It will require minor widening where the existing width is less than 24 feet, as well as the addition of minor drainage improvements and concrete curbs. Improvements also include embankment, full-depth reclamation, asphalt concrete pavement, guardrail, concrete curb, culverts, gates, ADA improvements, pavement markings and subexcavation.
The project will be constructed under temporary single lane closures requiring temporary traffic control. All work occurs within environmentally sensitive settings which will require best management practices and restrictions to protect identified resources.
ESTIMATED COST RANGE: The project is between $10,000,000 and $20,000,000.
Oct 3, 2022 | [Presolicitation (Original)] CO FTNP DINO 11(1) Harpers Corner Road |
Nov 9, 2022 | [Solicitation (Updated)] CO FTNP DINO 11(1) Harpers Corner Road |
Dec 15, 2022 | [Solicitation (Updated)] CO FTNP DINO 11(1) Harpers Corner Road |
With GovernmentContracts, you can:
Bid No. Bid Description Bid Due Date Documents IFB 2023-030 Tuck Lateral Tree
City of Northglenn
Bid Due: 12/19/2024
Solicitation Number Status Due Description Attachments 119-24 Active 10/30/2024 5:00 PM City of
City of Thornton
Bid Due: 10/30/2024
Marathon Baler and Conveyor Replacement and By-pass Details Due Date: 05/21/2024 2:00 pm
Boulder County
Bid Due: 5/21/2024
Follow Cattle Guard Replacement on Dolores and Columbine Ranger Districts San Juan NF
Federal Agency
Bid Due: 4/30/2024