Agency: | TRANSPORTATION, DEPARTMENT OF |
---|---|
State: | California |
Type of Government: | Federal |
Category: |
|
Posted: | Mar 30, 2023 |
Due: | Apr 27, 2023 |
Solicitation No: | 6982AF23B000014 |
Publication URL: | To access bid details, please log in. |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
THIS IS A REQUEST FOR BIDS. PLANS AND SPECIFICATION ARE AVAILABLE AT THIS TIME.
The project is located approximately 33 miles southwest of King City, CA on Forest Service Route 22S01 (Nacimiento Fergusson Road) within the Los Padres National Forest in Monterey, CA.
The project consists of repairing 13 sites, encompassing 11 miles along the route. Site repairs generally include embankment construction, retaining walls, and culvert replacements.
SCOPE OF THE WORK:
The purpose of the project is to repair 13 damaged sites along the Nacimiento Fergusson Road within the Los Padres National Forrest. 7 mechanically stabilized earth (MSE) walls and 8 drainage culverts are proposed as part of the repair design. Culverts range in size from 24-inch to 72-inch in diameter. Headwalls and wingwalls are proposed on the 72-inch culverts. Furthermore, as a result of the flood event, debris removal and grading are anticipated. Nacimiento Fergusson Road is currently paved and is proposed to be repaved with the existing pavement structural section within the repair sites.
Items worth noting:
*The terrain is mountainous with steep slopes.
*The roadway widths vary from 16-ft to 24-ft.
*The road is currently closed to the public. However, residents along the route do have access.
*The roadway serves as the primary route between King City and the Pacific Coast.
*Access for the residents will be maintained during construction.
*Shoring is anticipated for MSE wall excavations and to allow access.
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
ANTICIPATED SCHEDULE:
Award: May 2023
Construction: May 2023 – December 2023
ESTIMATED COST RANGE:
The anticipated cost range is between $10,000,000 and $20,000,000.
Mar 7, 2023 | [Presolicitation (Original)] CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road |
Mar 28, 2023 | [Solicitation (Updated)] CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road |
Apr 12, 2023 | [Solicitation (Updated)] CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road |
Apr 19, 2023 | [Solicitation (Updated)] CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road |
May 10, 2023 | [Solicitation (Updated)] CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road |
May 18, 2023 | [Solicitation (Updated)] CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road |
May 24, 2023 | [Solicitation (Updated)] CA ERFO FS LSPDR 2021-1(1) Nacimiento-Fergusson Road |
With GovernmentContracts, you can:
.... Installation to also include 3-year maintenance on access control database, patching/updates of ...
State Government of California
Bid Due: 4/18/2024
...Access control Project # AP-24-04 Request for Proposal Request-for-Proposal Access Control.pdf... 201.5 KB ...
Eastside Union School District
Bid Due: 5/21/2024
...Access control Project # AP-24-04 Request for Proposal Request-for-Proposal Access Control.pdf... 201.5 KB ...
Eastside Union School District
Bid Due: 5/21/2024
...Access control Project # AP-24-04 Request for Proposal Request-for-Proposal Access Control.pdf... 201.5 KB ...
Eastside Union School District
Bid Due: 5/21/2024