Company Information
- Legal Structure:
LLC
- Sales/Service Area:
Australia; China; Hong Kong; Israel; Italy; Japan; Jamaica; Jordan; Kyrgyzstan; Korea, Republic of; Kuwait; Kazakhstan; Laos; Macau; Philippines; Thailand; Tunisia; Turkey; Taiwan; Uzbekistan; Vietnam
- Contact Person:
JAMES JEN
- Year Established:
2005
- Business Type:
- Research and Development (20 %)
- Service (80 %)
- Ownership:
- Asian Pacific American
- Other Minority Owned
- Self-Certified Small Disadvantaged Business
- Certification Type:
8(a), Small Disadvantaged Business,
Products & Services
8(a) DSB, building commissioning services for new and existing buildings. high-performance energy-saving buildings thru effective project management, Owner's Project Requirements, Basis of Design reviews, rigorous site testings.
Special Equipment
Flir Infred Camara,Onset HOBO Data Loggers, TSI IAQ Meter, Fluke Digital Multimeter, Fluke Electrical Tester, Fluke Infrared Thermometer, AirData Multimeter kit, Carbon Diaoxide Meter; Automated Fault Detection and Diagnostic tool (AFDD)
Keywords
- Building Cx
- Bldg Commissioning
- Retrocommissioning
- Rcx
- Retro-commissioning
- Leed
- Usgbc
- Hvac
- Hvac Controls
- Digital Controls
- Ddc
- Energy Conservation
- Energy
- High Performance
- Sustainability
- Green Building
- Bas
- Building Controls
- Pneumatic Contro
NAICS Code(s)
- 541330
- Engineering Services
- 541340
- Drafting Services
- 541350
- Building Inspection Services
- 541618
- Other Management Consulting Services
Contracts
Name: | Mark Twain Middle School Boiler Replacement and Control Upgrade |
Contract: | building Cx |
Start: | 08/11/2011 |
End: | 01/31/2012 |
Value: | $450,000 |
Contact: | Pete Paradis |
Phone: | 503-991-6572 |
Name: | Glendale Elementary School HVAC and Control Upgrade |
Contract: | building Cx |
Start: | 08/11/2010 |
End: | 02/15/2011 |
Value: | $400,000 |
Contact: | Jim Howell |
Phone: | 503-540-4429 |
Name: | Hillside Elementary School |
Contract: | building Cx |
Start: | 04/07/2011 |
End: | |
Value: | $8.2 million |
Contact: | David McKay |
Phone: | 503-385-4788 |
Name: | Portland Community College - Newberg Center |
Contract: | Building Cx - LEED |
Start: | 05/01/2010 |
End: | 01/15/2012 |
Value: | $5.9 million |
Contact: | Gary Sutton |
Phone: | 503-977-8424 |
Name: | City of Portland - Bull Run Facilities |
Contract: | Building Cx - LEED |
Start: | 04/01/2010 |
End: | 12/15/2011 |
Value: | $60 million |
Contact: | Brad Bane |
Phone: | 503-973-5151 |
Name: | Pilot Rock School District |
Contract: | Building Cx |
Start: | 02/01/2010 |
End: | 09/30/2011 |
Value: | $2.4 million |
Contact: | Ryan Haggerty |
Phone: | 503-385-4700 |
Name: | City of Portland Emergency Coordination Center |
Contract: | Building Cx/Sub LEED |
Start: | 09/03/2009 |
End: | 12/31/2012 |
Value: | $10.6 million |
Contact: | Mr. Joshua Stein |
Phone: | 503-973-5151 |
Name: | Mt. Angel |
Contract: | Building Cx |
Start: | 08/15/2009 |
End: | 11/30/2009 |
Value: | $350,000 |
Contact: | Jim Howell |
Phone: | 503-540-4429 |
Name: | Southern Oregon Education Service District - Medford |
Contract: | Building Cx |
Start: | 06/24/2009 |
End: | 12/31/2009 |
Value: | $650,000 |
Contact: | Mr. Jim Howell P.E. |
Phone: | 503-540-4429 |
Name: | Port of Portland - Portland International Airport |
Contract: | NC Cx /Sub-LEED |
Start: | 05/17/2007 |
End: | 04/23/2010 |
Value: | $72 million |
Contact: | Mr. Bruce Fellows, Project Manager |
Phone: | 503-460-4091 |
Name: | Portland Community College, Trades and Industry Lab |
Contract: | HVAC Lab DDC Design |
Start: | 07/01/2007 |
End: | |
Value: | $200,000 |
Contact: | Mr. Rick Willebrand, Department Chair |
Phone: | 503-978-5653 |
Name: | Oregon Department of Corrections, 13 Facilities Survey |
Contract: | Kitchen Fire Code |
Start: | 06/01/2007 |
End: | |
Value: | $200,000 – 250,000 |
Contact: | Mr. Dan L. Howard, Construction Project Manager |
Phone: | 541-922-2036 |
Name: | Archer Glen Elementary School, DDC System Retrofit |
Contract: | EB Cx Services |
Start: | 07/01/2004 |
End: | |
Value: | $102,000 |
Contact: | Mr. Pierre Dehaze, Maintenance Director |
Phone: | 503-625-8178 |
Name: | Centennial High School Renovation & Addition |
Contract: | NC & EB Cx services |
Start: | 01/01/2003 |
End: | |
Value: | $16 million |
Contact: | Mr. Joe Soulagnet, Maintenance Supervisor |
Phone: | 503-762-3671 |
Name: | Butler Creek Elementary School |
Contract: | NC Cx services |
Start: | 01/01/2003 |
End: | |
Value: | $8.2 million |
Contact: | Mr. Joe Soulagnet, Maintenance Supervisor |
Phone: | 503-762-3761 |
Name: | Jefferson High School, BAS Upgrade |
Contract: | Controls Retrofit |
Start: | 07/01/2004 |
End: | |
Value: | |
Contact: | Mr. William Robbins, PE, CEM, Energy Engineer |
Phone: | 503-916-2000 x 4414 |
ENERGY PERFORMANCE ENGINEERING, LLC Website Links: