| Location: | Texas |
|---|---|
| Posted: | Aug 5, 2026 |
| Due: | Aug 20, 2026 |
| Agency: | City of Sugar Land |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-ITB-033 |
| Publication URL: | To access bid details, please log in. |
Project ID: 2026-ITB-033
Title: Ground Storage Tank Rehab - Homeward Way and First Colony CWA2503
Addenda: 0
Release Date: 8/5/2026
Due Date: 8/20/2026
The project entails the rehabilitation of one 0.3 MG ground storage tank at the Homeward Way Water Plant and one 1.5 MG ground storage tank at the First Colony Water Plant. The rehabilitation includes but is not limited to, blasting and coating of tank interior and exterior with full containment, roof, shell, and flooring plate repairs, removal and replacement of tank appurtenances, miscellaneous site work, site grading, concrete pavement work, tank disinfection, clean-up and site restoration. For additional details, Contractor should refer to the Contract Documents.
The City of Sugar Land maintains a network of ground storage tanks (GSTs) that play a critical role in delivering a safe, reliable, and resilient water distribution system for residents and businesses. These tanks provide essential water storage capacity, maintain system pressure, and support fire protection throughout the community. To ensure the continued reliability of this infrastructure, the City implements a proactive rehabilitation program that evaluates the condition of existing tanks and prioritizes improvements based on age, condition, and operational needs. Ground storage tanks typically require major rehabilitation every 15 to 20 years to preserve their structural integrity, prevent corrosion, and extend their service life. Rehabilitation efforts may include structural repairs, blasting and removal of deteriorated coatings, application of new protective coatings, and other modifications necessary to maintain compliance with industry standards. By investing in routine maintenance and rehabilitation through the Capital Improvement Program, the City protects critical water infrastructure, reduces the risk of service interruptions, extends the lifespan of valuable assets, and supports Sugar Land's strategic goal of maintaining sustainable and resilient infrastructure for the community

With GovernmentContracts, you can:
...Campus Domestic Water Distribution System Improvements, Design Services Follow Solicitation...
State Government of Texas
Bid Due: 9/18/2026
...crews on the city's potable and reclaimed water distribution systems. Assignments under this ...
City of Austin
Bid Due: 9/03/2026
...) Status: Open Solicitation Number: IFB 6100 CLMC1105 Description: Distribution Getaway Duct Bank ...
City of Austin
Bid Due: 9/17/2026
...water distribution system for residents and businesses. These tanks provide essential water storage... ...
City of Sugar Land
Bid Due: 8/27/2026