| Location: | Washington |
|---|---|
| Posted: | Aug 5, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | Pierce County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Ski Park Bridge
Addenda: 0
Release Date: 8/5/2026
Due Date: 8/26/2026
This contract provides improvement to the Foothills Trail by the replacement of the Pierce County Parks bridge #PRT27195-E with a 200-foot long, two span, precast concrete girder bridge. The work also includes the clearing, grubbing, grading, replanting, and construction of a mitigation channel connecting the unnamed stream to a wetland in the area adjacent to the bridge. The work also includes traffic control, erosion control, and other work in accordance with and as described in the Plans and Specifications.

With GovernmentContracts, you can:
...South Concourse Evolution (SCE), Bid Package 2.1.01 - Building Concrete - New Status ...
Port of Seattle
Bid Due: 10/15/2026
...concrete gravity sewer main and eleven 48-inch diameter concrete manholes. the Contractor shall ...
City of Vancouver
Bid Due: 9/22/2026
..., various stripe painting, concrete and asphalt saw cutting and coring of non-ACM/non-hazardous ...
Port of Seattle
Bid Due: 9/29/2026
...class 4 - asphalt concrete paving. Public Works Publication Date September 04, 2026 ...
State Government of Washington
Bid Due: 10/07/2026