| Location: | Washington |
|---|---|
| Posted: | Aug 5, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | Pierce County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Ski Park Bridge
Addenda: 0
Release Date: 8/5/2026
Due Date: 8/26/2026
This contract provides improvement to the Foothills Trail by the replacement of the Pierce County Parks bridge #PRT27195-E with a 200-foot long, two span, precast concrete girder bridge. The work also includes the clearing, grubbing, grading, replanting, and construction of a mitigation channel connecting the unnamed stream to a wetland in the area adjacent to the bridge. The work also includes traffic control, erosion control, and other work in accordance with and as described in the Plans and Specifications.

With GovernmentContracts, you can:
...of dewatering the site, providing erosion control, excavating the existing dike soil and ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/21/2026
..., ESC lead, erosion control and water pollution prevention, bark or wood chip ...
State Government of Washington
Bid Due: 9/23/2026
..., temporary erosion control, hot mix asphalt (HMA) paving, beam guardrail, electrical system ...
State Government of Washington
Bid Due: 9/23/2026
...restoration, erosion control, water management and traffic control. Public Works Publication Date...
State Government of Washington
Bid Due: 7/07/2027