| Location: | Washington |
|---|---|
| Posted: | Aug 5, 2026 |
| Due: | Aug 26, 2026 |
| Agency: | Pierce County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Ski Park Bridge
Addenda: 0
Release Date: 8/5/2026
Due Date: 8/26/2026
This contract provides improvement to the Foothills Trail by the replacement of the Pierce County Parks bridge #PRT27195-E with a 200-foot long, two span, precast concrete girder bridge. The work also includes the clearing, grubbing, grading, replanting, and construction of a mitigation channel connecting the unnamed stream to a wetland in the area adjacent to the bridge. The work also includes traffic control, erosion control, and other work in accordance with and as described in the Plans and Specifications.

With GovernmentContracts, you can:
...-treated timber piles. Commodity Codes 912-23-Construction, General (Backfill Services, Digging, Ditching, Road Grading, ...
State Government of Washington
Bid Due: 9/29/2026
...and grading, ditch lining with geotextile, erosion and scour protection, concrete slop protection... ...
State Government of Washington
Bid Due: 9/23/2026
...and Water Construction,Sidewalks/Curbs/Gutters,Signage,Sitework/Excavating and Grading,Storm Drain.../Excavating and Grading, Water and Wastewater Facilities, Grubbing ...
City of Wenatchee
Bid Due: 9/16/2026
...wells, vaults, and associated piping. N. Final grading and construction of new dam ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/30/2026