| Location: | Texas |
|---|---|
| Posted: | Mar 8, 2026 |
| Due: | Mar 19, 2026 |
| Agency: | City of Kyle |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Center Street Road Bond Project
Addenda: 4
Release Date: 1/5/2026
Due Date: 3/19/2026
The City of Kyle is seeking a contractor for improvements to Center Street from Old Stagecoach to Veterans Drive with full depth pavement reconstruction and curb and gutters.
Other improvements include proposed: roundabout with landscaping, mid-block crossing, Vybe Trail, sidewalks, curb ramps, driveways, storm sewers, cross culvert, extended detention basin, pedestrian railing, roadside ditches and culverts, water lines, street lighting, permanent signage and striping, and rectangular rapid flashing beacons (RRFB).

With GovernmentContracts, you can:
.... And Brahma Blvd.) STORM WATER IMPROVEMENTS (CDBG-MIT GLO CONTRACT NO. 22-085-009-D237)) August ...
City of Kingsville
Bid Due: 8/18/2026
...Torres Blvd. Project will include storm drainage improvements, BPUB water and wastewater utilities, ...
City of Brownsville
Bid Due: 8/26/2026
...Torres Blvd. Project will include storm drainage improvements, BPUB water and wastewater utilities, ...
City of Brownsville
Bid Due: 8/26/2026
...by 80 to 90%. Improve existing drainage and storm water management systems at ...
City of Austin
Bid Due: 8/06/2026