Woodside Drainage & Utility Infrastructure Improvements, Phase 2
| Location: |
Florida |
| Posted: |
Nov 2, 2025 |
| Due: |
Dec 12, 2025 |
| Agency: |
City of Kissimmee |
| Type of Government: |
State & Local |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
IFB2026001 |
| Publication URL: |
To access bid details, please log in. |
Main
Agency
City of Kissimmee
Status
Active
Title
Woodside Drainage & Utility Infrastructure Improvements, Phase 2
Type
Invitation to Bid
Department
Purchasing
Online Submissions
No
Project Estimate
Piggyback Solicitation
No
Insurance Required
Yes
Bid Bond Required
Yes
Bid Bond Amount
5% of Total Bid
Performance Bond Required
No
Performance Bond Amount
Construction Bond Required
Yes
Construction Bond Amount
100% of Accepted Bid
Scope of Services
Two projects are included in this advertisement. The first project is the City of Kissimmee
Woodside Drainage Improvements, Phase 2 that begins at Heron Ditch east of Dyer
Boulevard and continues to the west through the Kissimmee Gateway Airport to the
outfall at Shingle Creek. A 72-inch storm sewer will be constructed from the Heron Ditch,
under Dyer Boulevard, and into the existing airport ditch. The existing ditch within the
airport will be regraded and armored. A 72-inch storm sewer will be constructed from the
airport ditch, under Hoagland Boulevard, to the existing ditch along the Kissimmee Trail.
The 72-inch pipe will be jack and bored under Hoagland Boulevard. The existing ditch
along the Kissimmee Trail will be regraded and armored. Construction activities also
include pavement, drainage structures, concrete curb and gutter, concrete sidewalk,
guardrail, fencing, clearing and grubbing, earthwork, grading, and sodding. This
project is funded through a combination of sources including the Community Development
Block Grant – Mitigation (CDBG-MIT) Program, the American Rescue Plan Act (ARPA),
and local funds. The CDBG-MIT funds were awarded by the Florida Department of
Commerce with the source of these federal funds being the U.S. Department of Housing
and Urban Development (HUD), as authorized by Federal Register Notice 84 FR 45838,
dated August 30, 2019.
The second project is the Toho Water Authority Woodside Utility Relocations, Phase 2
that consists of relocating a 16-inch reclaimed watermain, a 16-inch watermain, and a 20-
inch sanitary force main in the area of Hoagland Boulevard. The scope also includes
relocating a 30-inch sanitary force main adjacent to the ditch within the Kissimmee
Gateway Airport and along Dyer Boulevard, as well as relocating a 12-inch watermain
and a 30-inch reclaimed watermain in the area of Dyer Boulevard. This project is funded
by the Toho Water Authority through an inter-local agreement with the City of Kissimmee.
PROJECT LOCATION: City of Kissimmee, FL
SITE: The project begins at Heron Ditch at Dyer Boulevard and continues to the
west through the Kissimmee Gateway Airport to the outfall at Shingle Creek.
Dates(All times are listed as
EST
)
Broadcast Date
11/2/2025 8:00 AM EST
Question End Date
Due Date
12/12/2025 2:00 PM EST
Bid Opening Date
Pre-Bid Meetings
Total: 0
(All times are listed as
EST
)
|
Date
|
Time
|
Mandatory
|
Location
|
Shortlist Meeting
Total: 0
(All times are listed as
EST
)
Documents
Total: 4
|
Type
|
Name
|
Description
|
File Type
|
|
|
Invitation for Bid
|
Bid Book for Woodside Drainage Improvements Project-IFB2026001 FINAL 10-27-2025 SIGNED.pdf
|
Bid Document
|
PDF
|
|
|
Plans
|
413557 Woodside Utility Relocates Phase 2 Issued for Bid Drawings SIGNED.pdf
|
Utility Relocates Phase 2
|
PDF
|
|
|
Plans
|
Woodside Drainage Improvements Phases 1 and 2 Survey Plans SIGNED.pdf
|
Phases 1 & 2 Survey Plans
|
PDF
|
|
|
Plans
|
Woodside Drainage Improvements Phase 2 Bid Plans 24OCT2025 SIGNED.pdf
|
Phase 2 Bid Plans
|
PDF
|
|
Commodity Codes
Total: 4
|
Code
|
Description
|
|
[961-85]
|
Utility Services, Water
|
|
[913-89]
|
Maintenance and Repair, Utility/Underground Projects
|
|
[968-63]
|
Relocation and/or Removal Services for Utility Works
|
|
[911-87]
|
Storm Drainage
|
Publications
Total: 1
|
Publication
|
Date
|
|
Orland Sentinel
|
11/2/2025
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...project will consist of earthwork operations, sheet pile installation, adjustments to existing headwalls...
Bay County
Bid Due: 6/30/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.